• Scaffolding Parts-Hot Dip Galvanized Bolt System 1
  • Scaffolding Parts-Hot Dip Galvanized Bolt System 2
  • Scaffolding Parts-Hot Dip Galvanized Bolt System 3
Scaffolding Parts-Hot Dip Galvanized Bolt

Scaffolding Parts-Hot Dip Galvanized Bolt

Ref Price:
get latest price
Loading Port:
XINGANG
Payment Terms:
TT
Min Order Qty:
2000 Unit/Units pc
Supply Capability:
50000 Unit/Units Per Month pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details of Scaffolding Parts-Hot Dip Galvanized Bolt

Place of Origin:  China (Mainland) 

Brand Name:  CMAX

Type:  Scaffolding Accessories 

Material:  Low Carbon Steel, 35K, Q235, C1010, C1008 etc.

Size:  Customize as per your needs. 

Color:  Silver, Gold, Self-color or painted as per your order.

Grade:  4.8 , 5.8 , 6.8 , 8.8 , 10.9 etc. 

Standard:  DIN931, DIN933, DIN934   

Lead time:  Within 20 days 

Package:  Boxes or cartons then on pallet 

Service:  OEM service is available. 

Size

Metric diameter M5 to M100   Inch Diameter 1/4” to 3

Material

316L 904L 317L 254SMO 654SMO AL6XN 1.4529 AISI310S S32760 Nickle copper alloy,

Duplex stainless steel 2205 ,duplex stainless steel 2507, 

Hastelloy C276, hastelloy C4,    Hastelloy C4, Hastelloy C22. Hastelloy B3,

 SUS321, Monelk500, Monel400, 724L,Inconel718,Inconel625, Inconel600,

 Incoloy825, 309S, Inconel601,A286, Alloy59, 316Ti, SUS347,17-4PH.Nickle201... Ect

Product range

Bolt ,nut ,screw ,washer, thread rod ,flange,welding rod

Standard

DIN ASME GB JIS  non-standard products

Logo

XDO ,  also according to clients requirements

MOQ

100pcs at least, also according to size and material

Sample policy

 sample could provided, sample fee will be charged if no instock.

Sample time

One day delivery if we have in stock, one week if no in stock.

In stock items

904L nut M6 to M20 , duplex stainless steel hex nut M6 to M20

316L hex bolt M6 to M30.  316L nut hex bolt M6 to M30

One stop purchase

we help you with one - stop purchasing, we could manufacture fasteners, flanges and also pipe fittings on these exotic materials.

OEM Accepted

Yes

Mill test certificate

Yes

Inspection report

Yes

Payment term

L/C  T/T Western Union 

Packing details

Carton box 200x100x200, Pallet 900X500X400

 

Packaging & Delivery of Scaffolding Parts-Hot Dip Galvanized Bolt

Packaging Detail: Cartons or boxes then on pallet, or as per your need.

Delivery Detail: Within 20 days

Specifications of Scaffolding Parts-Cold Galvanized Bolt

Bolts for Scaffolding Coupler

All size can be avaiable.

Grade:4.8/5.8/6.8/8.8/10.9etc.

stable Standard:DIN931 DIN933 DIN934

About us

1.Enough production lines and workers to delivery on time.

2.Main product: Scaffolding System( Kwikstage, Cuplock, Ringlock, Haki); Scaffold Coupler( British Type, American Type, German Type, Italian Type, Australian Type, Mideast Type, Korean Type, Janpanese Type, Indian Type etc.); Shoring Props,Formworks, Frame System, Scaffold Steel Tubes, Accessories, Steel / Aluminum Planks etc.

3. Main Market: Europe, Australia, Newzealand, North America, Middle East, ect.

4.Our products have passed the customer`s quality test,and the factories have thequality testing instruments.

5.OEM Service

6.Rizhao is a coastal city with convenient transportation.

7.Provide good service for everyone.

 Scaffolding Parts-Hot Dip Galvanized Bolt

 

 Scaffolding Parts-Hot Dip Galvanized Bolt

 

 Scaffolding Parts-Hot Dip Galvanized Bolt

Q:The whole concrete wall climbing frame or good use of steel scaffolding
Floor scaffold:Advantage:1) large bearing capacity. When the scaffolding geometry and structure comply with the relevant requirements, under normal circumstances, the bearing capacity of 15kN ~ 35kN of the single column scaffold (1.5tf ~ 3.5tf, design value).Clamp and Tube Scaffold2) easy to install and disassemble, set up flexible. Because the length of the steel tube is easy to adjust and the fastener is convenient to connect, the utility model can be used for various buildings and structures with various planes and elevations.3, compared with the economy, the processing is simple, and the investment cost is low; if the geometric dimensions of the scaffold are carefully designed, and the utilization rate of the steel tube is improved, the material consumption can also obtain better economic effect. Fastener steel pipe frame equivalent to 15 square meters per square meter of construction steel.
Q:What is an integrated climbing frame? What are the works? What are the advantages
. It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material
Q:Advantages and disadvantages of climbing frame and floor type scaffold
Floor scaffold:Advantage:1) large bearing capacity. When the scaffolding geometry and structure comply with the relevant requirements, under normal circumstances, the bearing capacity of 15kN ~ 35kN of the single column scaffold (1.5tf ~ 3.5tf, design value).
Q:What are the maintenance and maintenance of hydraulic climbing formwork
Whether or not the double screw nut is used on the important bolt connection, the degree of the fastening, whether the steel bar is pressed according to the rules, and the steel wires are bundled together
Q:Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
Climbing frame installation processInstallation of platform --- display base, installation guide, assembling components - horizontal truss beam with the bolt on the guide rail, the main frame vertical rod buckle on the beam - diagonal rod buckle on the vertical rod and beam - wall installation guide device, the frame structure of unloading with elevated body, the erection of scaffolding, the laying of the intermediate layer or temporary scaffolding and temporary building structure frame of pulling and hanging outside the dense mesh safety net - loaded third beams to guide seat -
Q:The difference between the scaffold and the scaffold
The climbing frame is the kind of iron that is assembled by a large construction site
We are an enterprise which is engaged in mechanical designing, processing, mold manufacturing and casting. Its customers are based on foreign investors, state-owned enterprises and medium-sized private companies. Because of the advanced technology, our products are involved in petroleum, metallurgy, mining, and textile, medical and other industries. The company makes a rapid rise in the machining area under the conduct of business philosophy “quality first, customer first” and the management principle “strengthen the management, continuous improvement”.

1. Manufacturer Overview

Location Hebei, China
Year Established 1987
Annual Output Value Below US$1 Million
Main Markets China; United States; Britain; Japan; Germany; Israel
Company Certifications GB/T19001-2008/ISO9001:2008 Quality Certification

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Xingang
Export Percentage 1% - 10%
No.of Employees in Trade Department 10-20 people
Language Spoken: Chinese; English
b)Factory Information  
Factory Size: Above 3,000 square meters
No. of Production Lines Above 10
Contract Manufacturing Design Service Offered
Product Price Range Average

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords