Scaffolding Parts-Hot Dip Galvanized Beam Clump
- Loading Port:
- XINGANG
- Payment Terms:
- TT
- Min Order Qty:
- 2000 Unit/Units set
- Supply Capability:
- 5000 Unit/Units Per Month set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details of Scaffolding Parts-hot dip galvanized beam clump
Place of Origin: China (Mainland)
Brand Name: CMAX
Type: Scaffolding Parts
Scaffolding Part Type: Scaffolding Couplers
Materail: Q235
Surface treatment: zink
plate Size: 48.3mm
Weight: 1.50kg
Packaging & Delivery of Scaffolding Parts-hot dip galvanized beam clump
Packaging Detail: steel pallet or as your requests
Delivery Detail: 20-45days or as your quantity
The Details of Drop Forged Scaffold Beam Clamp/Girder Coupler
Material of the swivel coupler |
Q235 Q255 Q345 |
Standard |
BS1139 |
Certificate |
ISO9001:2000,ISO9001:2008 |
Technic |
Drop forged |
Application |
connecting the scaffolding pipe |
Surface treatment |
Hot-dip galvanized/Galvanized |
Main market of the scaffolding swivel coupler |
Europe, America, Australia, Africa, etc |
Specifications of Scaffolding Parts-hot dip galvanized beam clump
1.Materail:Q235
2.Surface:zink plate
3.Size:48.3mm
4.Weight:1.50kg
5.high quality and competitive price
Scaffold Fixed Girder Coupler /Beam Clamp
Product description of Scaffolding Parts-hot dip galvanized beam clump
(1)raw materail:Q235
(2)surface treatment:zink plate
(3)size:48.3mm
(4)weight:1.50kg
(5)OEM service is available
(6)high quality and competitive price
Our main manufacturing
(1) Scaffolding System:
Including Ringlock Scaffolding System and accessories; Cuplock Scaffolding System and accessories; Kwikstage Scaffolding System and accessories; Haki Scaffolding System and accessories;
(2) Scaffolding Frame & Accessories:
Including Walk Through Frame Scaffolding; Ladder Frame Scaffolding; Accessories; we also can make scaffolding according to your samples or drawings.
(3) Scaffolding Couplers/Clamps:
We can produce all kinds of forged and pressed couplers, including British type couplers, American type couplers, German type couplers, Italian type couplers ,fence couplers, BRC coplers and so on. We also can produce according to your drawings or samples.
(4) Formwork System Scaffolding & Accessories:
Light Duty Shoring prop and Heavy Duty Shoring Prop; Wing nuts and Tie rods; RASTO clamp and so on.
- Q:The whole concrete wall climbing frame or good use of steel scaffolding
- Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction
- Q:What is an integrated climbing frame? What are the works? What are the advantages
- And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings. Rental fees do not want the same
- Q:Advantages and disadvantages of climbing frame and floor type scaffold
- 2) easy to install and disassemble, set up flexible. Because the length of the steel tube is easy to adjust and the fastener is convenient to connect, the utility model can be used for various buildings and structures with various planes and elevations.
- Q:What are the maintenance and maintenance of hydraulic climbing formwork
- Whether or not the double screw nut is used on the important bolt connection, the degree of the fastening, whether the steel bar is pressed according to the rules, and the steel wires are bundled together
- Q:Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
- Install the lifting seat and a guide seat is connected with the high wall, main frame vertical rod, the frame set up to the designed height, laying the top scaffold, block feet - laying bottom safety nets and scaffolding, making turning plate - the upper part of the frame body structure and effective tie (tie spacing is not greater than 6m) - display efflux dense mesh safety net to the top of the shelf, the anti dropping boom is inserted into the base anti dropping device, the installation of steel rope - placed distribution cables, installation control cabinet, electric hoist, electric wiring and debugging system, pre inspection, electric hoist, demolition of frame body and the upper structure of pulling and synchronization a layer - installation completed, enter the upgrade cycle
- Q:The difference between the scaffold and the scaffold
- Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction. It can climb up or down the building. This system makes the change: one is the scaffold without turning over shelf, two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material. And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings.
1. Manufacturer Overview |
|
---|---|
Location | Hebei, China |
Year Established | 1987 |
Annual Output Value | Below US$1 Million |
Main Markets | China; United States; Britain; Japan; Germany; Israel |
Company Certifications | GB/T19001-2008/ISO9001:2008 Quality Certification |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | Xingang |
Export Percentage | 1% - 10% |
No.of Employees in Trade Department | 10-20 people |
Language Spoken: | Chinese; English |
b)Factory Information | |
Factory Size: | Above 3,000 square meters |
No. of Production Lines | Above 10 |
Contract Manufacturing | Design Service Offered |
Product Price Range | Average |
Send your message to us
Scaffolding Parts-Hot Dip Galvanized Beam Clump
- Loading Port:
- XINGANG
- Payment Terms:
- TT
- Min Order Qty:
- 2000 Unit/Units set
- Supply Capability:
- 5000 Unit/Units Per Month set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords