Scaffolding Material Cuplock Material Q235

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

 1.Specification of Cup lock Scaffolding:

 We are one professional scaffolding syestem manufacturer.

 We could produce scaffolding as per your drawing or sample.


In the early 80 s, some domestic manufacturers began to manufacture doors scaffold, products are widely used in some parts of the project construction, achieved good effect.

Some domestic factories started to copy the Frame Scaffolding, after 1985,about 10  factories supply the Frame Scaffolding, and widely using in construction and be more and more popular at that time.

 

However, because different factories produced type based on different specification and different quality standard ,bring some difficulty to construction unit .At the same time, because of some factory adopts the material of steel pipe and specifications were not conformed to the requirements of the design, frame stiffness is small, weight is heavy, will be easy deformation by transportation, and bad machining accuracy was shorten using lifetime, all above seriously affected the promotion of the new technology.

2.The picture of Cup lock Scaffolding:

 

 Scaffolding Material Cuplock  Material Q235

3.Cup lock Scaffolding advantages:

1) Multifunction:equipments of construction with different size and load of construction could be assembled,such as one-side and double-sides scaffolding,props,etc.Applied to high-rise building,bridge,watertower,and so on.

2) 5 times fast of adapter plug assembly and disassembly than normal

3) Avioid using bolt in assembly and low down labor intensity. 

4)Not easy to lose fastener, portable firm and easy to maintain and transport

 4.FAQ

  We have organized several common questions for our clientsmay help you sincerely

 1Can we provide different size of Frame system Scaffolding as customer need

The answer is Yes, customer can provide the Tec spec to us and Drawing for production.

 

The production and Using time of Frame Scaffolding is not long in China, different factories has their own scaffolding Standard, variety specification variety product cannot be matched each other .Some factories copy foreign products, adopt the inch size. So far, Frame scaffolding still don’t have the standard specification,  different factories produced by different design and product standards. Not only bring considerable difficulties in using, is not conducive to popularized, at the same time, also brings to safety hidden trouble in construction. So, should organize the unified standard formulation as soon as possible.

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Scaffolding installation and precautions?
Began to set up the column, should be set up every 6 span of a throw support, even after the installation of the wall is stable, can be removed according to the circumstances.
Q:Can I get an industrial/scaffold piercing pierced with 2 separate bars?
nope! Cartilage piercings take about a year to fully heal up. Yes, you can get 2 separate bars, but let the piercer know thats what you want. Industrials are VERY hard to take care of. Make sure to listen to EVERYTHING the piercer says!
Q:I would like to ask how much scaffolding steel prices
Scaffolding steel pipe1, set up a high-level scaffolding, the various materials used must meet the quality requirements.2, the foundation must be firm, before the erection of the calculation, to meet the load requirements, and according to the construction code set up, do drainage measures.3, scaffolding erection technical requirements shall comply with the relevant provisions of the code.4, we must attach great importance to a variety of structural measures: scissors, pull nodes, etc. should be set according to requirements.5, the level should be closed: the first step, every step or two, covered with planks or hand foot fence, scaffolding to laying along the long, joints should be overlapped in the small bar, do not appear short board. And in between in the pole and the wall every four steps long laying safety bottom fence.6, vertical closure: from the second step to the fifth step, each step required in the outer row of pole side door set like baluster 1.00m high and block feet or to set up protective net, rod (net) and the vertical rod fastened; more than fifth steps in a protective railing, should all the safety fence or security legislation net; in the street or densely populated areas, should be from the second step, the safety fence or outside of all network security legislation.
Q:What are the components of a mobile scaffolding
The utility model relates to a standard steel pipe scaffold which is connected with the main structure of the wall and is connected with the main structure of the building.
Q:How to remove the disc scaffolding ah, do not know how to get through the decoration
First, in the demolition of the mobile frame should pay attention to the partner can not be replaced, it is better to slow down or stop work, do not have the experience of the construction personnel to carry out the demolition work.
Q:Specific specification for erection of civil scaffold
Inspection and acceptance1) the relevant provisions on inspection of steel pipesSteel pipes, fasteners, safety nets and other products must have a certificate of quality.All components must have quality inspection report, steel material inspection method must comply with the national standard "metal tensile test method" (GB/T228) the relevant provisions of the quality should be consistent with the "carbon structural steel" (GB/T700) regulations Q235. a steel.The surface of the steel pipe shall be smooth and free of cracks, scars, delamination, dislocation, hard bending, burrs, indentation and deep scratches.The outer diameter of steel pipe 48mm allowable deviation is 0.5mm; the thickness of the wall 3.5mm allowable deviation of.0.5mm; steel pipe surface cutting oblique deviation 1.7mm;
Q:Hoisting a scaffold: newton's second law tension problem?
well, the person is going to have to pull on the rope, and that will be another force that is not pictured in the book. if you think about it, when a rope is under tension, each end is getting pulled, like a tug of war, otherwise it just moves toward the other force. When the forces are balanced, the rope is in tension and does not move. The forces pictured in the book are tension provided by the weight. The person will have to add a tension force downward to compensate.
Q:is my scaffolding piercing infected/?
I've also had my scaffolding and I had the same issue. It was totally normal, I went back to the peircing place and asked if this was regular for the piercing. They said it was and to proceed with the cleaning process etc. they said it just has scabs because its healing :)
Q:Can anyone give a very brief description on all three scaffold scenes in The Scarlet Letter?
oh dang u have to read that story too ! man i had to read it and watch the movie ! so boring. What grade are u in ?
Q:scaffold, where to buy?
northern tools . 1800-556-7885

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range