scaffolding lock pins of buliding system

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Place of Origin:
China (Mainland)


Model Number:
Light duty, Heavy duty
color:
red blue yellow etc.
height:
2-3.5m
Material:
Q235,Q275,Q345...
finished:
galvanized,painted,power coating
Certificate:
ISO9001
Pin:
G-pin or Straight-pin
nut:
cup nut or as your requirement
plate:
flower plate or square plate
Base plate:
120*120*4mm

Packaging & Delivery

Packaging Detail:50/60 per bundle.
Delivery Detail:30days

Specifications

1.Adjustable Post
2.Material:Q235,Q345...
3.Type:Light/Heavy Duty
4.Surface Treatment:Galvanized,Powder Coating,Painted

adjustable steel support:

1. Products Name:

Steel prop, Scaffolding Prop, shoring prop, formwork prop, heavy duty prop, post shore, shoring post, shoring systems, Acrow prop

2.Surface treatment:

Powder Coating, hot-DIP galvanized, electro galvanized, painting

3. Package:

Steel Pallet, customized package

4. Material:

Q235, Q275, Q345

5. Type:

Light duty, Heavy duty

6. Finished:

Galvanized, painted, powder coating, hot DIP galvanized

7. Max Height:

2900mm-5000mm

8. Min Height:

500mm-4000mm

9.Screw Adjustment:

150mm, 200mm

10.Outer Pipe Diameter:

48mm, 56mm, 60mm, 70mm

11. Thickness of Outer tube:

1.2-3.5mm

12. Inner Pipe Diameter:

40mm, 48mm, 60mm

13. Thickness of Inner Pipe:

1.5mm, 1.6mm, 1.8mm, 2.0mm, 2.5mm, 3.0mm

14. Top and Base plate Size:

120x120x3(4 or 5)mm, 150*150*5mm

15. Weight:

5.0kg-50.0kg

16. Handle nut weight:

0.6kgs to 1.5kgs

17.Payment terms:

T/T, L/C, Westen Union

18. MOQ:

1*20'FCL

19. Deliveiry time:

15-25Days

20. OEM service:

Can make as customer's request drawing

21. Quality:

ISO9001

22. Usage:

Concrete Construction Works

23.Note:

When the adjustable height more than 4 meters, suggested using a tripod.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the functions and requirements of the masonry wall
6, vertical closure: from the second step to the fifth step, each step required in the outer row of pole side door set like baluster 1.00m high and block feet or to set up protective net, rod (net) and the vertical rod fastened; more than fifth steps in a protective railing, should all the safety fence or security legislation net; in the street or densely populated areas, should be from the second step, the safety fence or outside of all network security legislation.7, scaffolding erection should be higher than the top of the building or the operating surface of 1.5m or more, and add enclosure.
Q:According to the standard set up double scaffolding scaffolding to the number of meters per square meter
Once the calculation is qualified, you can according to the vertical distance
Q:when do i change my scaffold piercing?
Hi :) You can change it after 4 months usually But sometimes it can take up to a year It depends on the person , everybody's body heals differently You should go back to your piercer and ask if it's healed enough to change the jewellery Yep , it's normal A scaffold piercing goes through the cartilage and cartilage piercings can take up to a year to fully heal :)
Q:Standard for inspection of portal scaffolding
1.4 willow nails shall be made of ML2 steel specified in GB 715. All accord with the 1.5 electrode should be used in GB 5117 series E43 electrode. Comply with the 2 basic requirements: qualified 2.1 door frame and accessories in different combination conditions, shall be accorded with the inspection results are summarized in table NO:2008JW1658 inspection project and standard units of measurement test results 1# 2# single determine connectivity and interchangeability. When the 2.2 cross support, the connecting rod and other accessories are connected with the door frame, the utility model is in conformity with the retreat mechanism which is used to prevent the exit. When the connecting rod is used with the lock arm, the connecting rod is not limited by the limit. The 2.3 level frame, and the door frame scaffolding should prevent off the hooks, are in line with the fastening mechanism of the fall.
Q:What are the components of a mobile scaffolding
The main parts of the door type scaffolding are the basic structure of the door frame, the cross support, the connecting rod, the hanging button type foot board or the horizontal frame, the lock arm, etc.
Q:Are there any biological examples of scaffolding in evolution?
The classic demonstration was in the E. coli long term experiment. A strain gained the ability to metabolize citric acid after 31,500 generations. Culturing preserved strains from 15,000 and 20,000 generations showed that there was an event that occurred in between that enabled the later conversion to citrate metabolism.
Q:Hester Prynne on the scaffold?
She was only on it once officially but there are several appearances in the book.
Q:What is the rental price of the mobile scaffolding and accessories now? How to rent a law?
As for the specific rent is not easy to say, because each scaffolding rental companies may have some differences
Q:How many meters per square meter and the number of steel fasteners
According to the height of their own construction plans, according to the construction area of 1 square root, fasteners ranging from docking fasteners and rotating fasteners, rotating fasteners should be every square of the 3 bar, a detailed look at the old construction workers
Q:Can I clean my scaffold piercing with my make-up wipes?
problematic problem. browse at search engines like google. this could help!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range