Scaffolding Kwik Stage System with Standard AS 1576/1577 CNBM

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  • Quick Details of  Scaffolding Kwik Stage System with Standard AS 1576/1577

  • Type:Fixed

  • Material:Steel

  • Construction Properties:Building Scaffold

  • Lapping Form:Full Scaffolding

  • Framework:Combined Scaffolding

  • Supporting Mode:Floor Type Scaffolding

  • Erection Position:External Scaffolding

  • Scaffolding Part Type:Scaffolding Frames

  • Move Method:Attached Lifting Scaffolding

  • Structural Style:Multi-Pole Scaffolding

  • Place of Origin:China (Mainland)

  • Surface:Painted or Hot Dipped Galvanized

  • Material.:Steel Q235 Q345

    Thickness:4mm;3.2mm;3mm

  • Scaffolding Kwik Stage System with Standard AS 1576/1577 CNBM

  • Scaffolding Kwik Stage System with Standard AS 1576/1577 CNBM

  • Scaffolding Kwik Stage System with Standard AS 1576/1577 CNBM





Descriptions of Scaffolding Kwik Stage System with Standard AS 1576/1577

Kwikstage Scaffolding is a multi-purpose modular scaffold system which can be used for all forms of access and support structures in the building and construction industries, ship buliding, offshore construction and industrial maintennace.
Details of Metal kwikstage Scaffolding
1. Metal kwikstage scaffolding system is a new type of selflock scaffolding which is very popular in Oceanian,African construction.
2. Metal kwikstage scaffolding System is suitable for both inside concrete slab supporting and outside masonry Construction multi-purpose for construction.
3. Metal kwikstage scaffolding systemstandard is weld with a plate every 600mm which can join ledgers at 90 degree.
4. Metal kwikstage scaffolding system ledger is a horizontal member with a blade at each end for insertion into the standard plate.
5. kwikstage scaffolding system is quick to erect and strip which has completely replaced other scaffolding.



  • The Accessories of Scaffolding Kwik Stage System with Standard AS 1576/1577


  • STEEL STANDARD

  • Material: steel tube φ48.3x3.25mm

  • Surface finish: hot dipped galvanized

  • Standard with normal length 3.0m, 17.02kg

  • Standard with normal length 2.5m, 14.32kg

  • Standard with normal length 2.0m, 11.64kg

  • Standard with normal length 1.5m, 8.94kg

  • Standard with normal length 1.0m, 6.26kg

  • Standard with normal length 0.5m, 3.56kg

  • Topper Standard, 1.72kg

  •  Material: steel tube φ48.3x4.0mm

  • Surface finish: hot dipped galvanized

  • Standard with normal length 3.0m, 19.48kg

  • Standard with normal length 2.5m, 16.38kg

  • Standard with normal length 2.0m, 13.28kg

  • Standard with normal length 1.5m, 10.18kg

  • Standard with normal length 1.0m, 7.07kg

  • Standard with normal length 0.5m, 3.97kg

  • Topper Standard, 1.93kg


  • STEEL LEDGER 

  • Material: Made of steel tube φ48.3x3.25mm

  • Surface: hot dipped galvanized

  • Ledger of  3.00m, 13.00kg

  • Ledger of  2.44m, 10.67kg

  • Ledger of  2.39m, 10.60kg

  • Ledger of  1.95m, 8.87kg

  • Ledger of  1.83m, 8.29kg

  • Ledger of 1.78m, 8.20kg

  • Ledger of 1.47m, 6.97kg

  • Ledger of 1.22m, 5.98kg

  • Ledger of 1.05m, 5.31kg

  • Ledger of 0.71m, 3.97kg


  • TRANSOM (ANGLE)

  • Material: Made of steel 5# angle

  • Surface: hot dipped galvanized

  • Transom 2.39m, 17.71kg

  • Transom 1.78m, 13.60kg

  • Transom 1.27m, 10.19kg

  • Transom 1.22m, 9.85kg

  • Transom 1.05m, 8.70kg

  • Transom 0.813m, 7.12kg

  • Transom 0.71m, 6.42kg

  • Transom 0.60m, 5.75kg

  • Transom 0.51m, 5.08kg

  • L/A Transom 1.8m, 11.78kg

  • L/A Transom 1.2m, 9.56kg


  • BRACE

  • Material: Made of steel tube φ48.3x3.25mm

  • Surface: hot dipped galvanized

  • Brace 3.6m, 15.33kg

  • Brace 3.2m, 14.00kg

  • Brace 2.7m, 12.25kg

  • Brace 2.0m, 9.33kg

  • Brace 1.6m, 7.99kg


  • STEEL PLANK

  • Material: Made of 1.8mm thickness pre-gal.steel sheet

  • Surface: hot dipped galvanized

  • Size: 229mm(W)x 66mm(H)

  • Steel Plank 4.00m, 25.30kg

  • Steel Plank 3.00m, 18.90kg

  • Steel Plank 2.44m, 15.37kg

  • Steel Plank 2.00m, 12.52kg

  • Steel Plank 1.81m, 11.42kg

  • Steel Plank 1.25m, 8.20kg

  • Steel Plank 1.05m, 7.05kg

  • Steel Plank 0.736m, 5.25kg


  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Compared to Pankou scaffolding and scaffolding have what distinction, what are the advantages
Pankou scaffolding and scaffolding to build shape is not the same, is not the same, the price is not the same1, Pankou scaffolding hot-dip galvanizing process, lasting up to 15 years of age or above.2, scaffolding, low cost, high efficiency, convenient disassembly and effort to build.
Q:What is the importance of the second scaffold scene in the Scarlet Letter?
concentration your activity on who's on the scaffold, how they react to the customary public shaming, and what the reader learns with connection with the character from analyzing the define of them on the scaffold.
Q:Standard for inspection of portal scaffolding
The 1.2 Standard Specification for steel portal frame and accessories: vertical rod and the transverse diameter: 42.7 + 0.5 mm with an average of 42.9 with a wall thickness of 2.5 + 0.3 mm with an average of 2.45 cross brace: outer diameter of 25 + 0.5 mm with an average of 25.4 with a wall thickness of 2 + 0.3 mm average for 2.3 1.3 door frame and accessories the steel pipe and plate, the welding meets the conditions, allowing the use of the mechanical properties of Q235 steel are made of Q235 steel or better material; when using the tensile strength and yield strength of Q195 steel is low, without affecting the connection and construction conditions, allows for increasing the thickness of the way to make up for the strength the lack of.
Q:How long do you have to wait in between getting two piercings? cartilage and industrial (scaffold)?
You can have both done in the same day if you can handle the pain and shock. Get the industrial done first, and if you still feel OK afterwords, you can get your other ear done by the same piercer. Talk to him/her and let them know what you want to do before you start. If you feel like you need to wait after the industrial, wait at least a day before getting the second piercing. It's all about what you can handle.
Q:A window washer weighing 700 N is standing on a scaffold supported by a vertical rope at each end. The scaffol?
difficult situation. search in google or bing. that could actually help!
Q:How old do you have to be to get a scaffold piercing in washington?
I'm pretty sure it's 16-17 with parental permission. I suggest looking up some of the shops in your area and seeing what they say. There usually isn't a set rule for it, every shop is different. Like some shops may refuse seeing, say, a 14 year old, whereas another shop might do it with the parent's permission. Then of course, once you hit 18, you can do whatever you want, lol.
Q:Is it dangerous to get a scaffold piercing?
It shouldn't be dangerous if you go to a good piercer (mine pierced mine funny) and clean it regularly. and it should be fine, Just learn which type of earring you;re allergic to and make sure they dont pierce it with that kind of metal.
Q:Seeking for the safe construction scheme of mobile scaffolding!
Wall point setWhen the height is not less than 6.0m, you must set the uniform distribution of wall, its setting should meet the following requirements:Door type steel pipe scaffold: when height is less than or equal to 20m, less than 50m2 of a wall, and even the vertical spacing wall point should be less than or equal to 6m; when the frame of high >20m, not less than 30 M2 a point, and even the vertical spacing wall point should be less than 4m.The other floor (or bottom bracket) scaffolding frame: when high than 20m, a point of not less than 40m2, and even the vertical spacing wall point should be less than or equal to 6m; when the high frame >20m, a point of not less than 30m2, and even the vertical spacing wall point should be less than 4m.The free height of the upper wall of the scaffold is not more than 6m.
Q:What issues need to pay attention to the construction of high-level scaffolding
The use of the end of the scaffolding (including the construction of accessories) should be returned to the library, classified storage. Open dumps, the site should be smooth, good drainage, under the support pad, and covered with a sheet, accessories, parts should be stored indoors. Wuxi Dongfang scaffolding scaffolding factory products strictly according to JOD-1999 and OD15001-1205 standards, a type of mobile scaffolding scaffolding, scaffolding, roulette scaffolding, scaffolding and scaffolding accessories.
Q:When scaffolding is erected on the base of the permanent structural concrete
Selection of the project using 48 mm, 3.5mm wall thickness of steel pipe and the corresponding fasteners, dense mesh safety net, big eyes, such as net feet

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range