Scaffolding Jack Base for Construction

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
500000根 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Scaffolding Jack Base

1.Steel material: Q235
2.Length:Customized.
3.Hollow .
4.Shpae of base: U head, plain head.

5.Surface treatment: Oiled Color painted, Hot dip galvanized, Electro galvanized

6.Usage:Scaffolding part, adjusts the balance of scaffolding frame.

Adjustable Scaffolding Base jack
Size: 35/38x4mm, 143x143x5/6mm, 600,914,1524mm
Material: Q235

Surface finish:painted,galvanized

Type: base jack, top jack

Diameter: 30mm, 32mm, 34mm, 36mm, 37mm, 38mm, 40mm

Length: 400mm, 600mm

Base plate: 140*140*5mm

OEM service provided

Screw Jack Base

Dimensions: Diameter 35/38mm, Base plate 143x143x5/6mm, length 600,914,1524mm

Item

Screw Jack Base

Material

Q235

Dimensions

35/38mm, 100x150mm, 600,914,1524mm

Surface

Hot-dip galvanization, electro galvanization ,or as your request

Standard

EN74

Note

OEM service is available

MOQ

1000pieces

Package

in steel pallet, or as your request

Payment Terms

TT,L/C, we can contact in detail

Delivery Time

20-30days

Feature of screw jack base:

1) Base plates provide extra stability.

2) Enables safe use on uneven ground.

3) Galvanization for long lasting protection.

4) Elements safely connected.



Type: base jack, top jack

Diameter: 32mm, 34mm, 38mm

Length: 400mm, 600mm

Base plate: 120*120*5mm, 140*140*5mm, 150*150*6mm

OEM service provided




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the distance from the external walls of the scaffolding and scaffolding?
Scaffold (scaffold) refers to the construction site for workers to operate and solve the vertical and horizontal transport and erected various stents
Q:Construction scaffolding erected what is the standard, there is no template can refer to it?
scaffolding load shall not exceed 270kg / m
Q:How to calculate the amount of steel pipe Pay attention to meters as a unit, or tons of units! Thank you
Steel pipe commonly used specifications for 1m-6m first determine your height and length, width
Q:I need to know if these company is hiring scaffold builders Mobly Inc OKorder.com?
This company is hiring that company for those who buys them for that thing, from now and then!!
Q:(Spoilers) In the Scarlet Letter if DImmesdale did not die on the scaffold would Chillingworth have killed him? He speaks of revenge.?
Chllingworth's revenge did not involve killing Dimmesdale. He preyed on Dimmesdale's guilty conscience and drove him to do what he did, out of guilt. What Chillingtonworth did was actually much crueler than just killing Dimmesdale outright.
Q:There is no shelter outside the scaffolding project has been accident accident case
When the construction unit dismantles the top steel formwork, the 18 steel pipes (4m long) and the fasteners are removed to the hanging plate of the frame, and five workers fall from the roof with the hanging plate
Q:What would you like to ask?At what height do scaffolds have to be engineered?
At all heights...they are engineered as a system.
Q:71.0-kg painter is on a uniform 22.0-kg scaffold supported from above by ropes. How close to the left can he approach safely?
At the threshold of danger, the tension on the far rope reaches zero. (a) Distance from left edge = x; then summing moments about the left rope gives ΣM = 0 = 71.0kg * g * (1m - x) - 22.0kg * g * 2.0m - 6.0kg * g * 1m The g term cancels, and the rest solves to x = 0.296 m ◄ (b) Distance from right edge is X; summing about the right rope, and knowing the g terms will cancel, ΣM = 0 = 22.0kg * 2m + 6.0kg * 3m - 71.0kg * (1m - X) leads to X = 0.127 m ◄ Hope this helps!
Q:In the housing budget in what circumstances calculate the dependent chute and independent ramps? Thank you
Dependent ramps or independent ramps, there are construction organization design or construction program, according to the construction organization design or construction program requirements
Q:What is the most important safety hazard at the construction site?
Civilized construction Site fencing Some works in the urban area of ​​the main section of the site is not set above the 25m fence some site fence material is not strong, unstable, not clean, do not meet the local aesthetic requirements

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range