Scaffolding Galvanized Pressed Fixed Coupler

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Place of Origin:
Shandong China (Mainland)


Type:
Scaffolding Parts
Scaffolding Part Type:
Scaffolding Couplers
Material:
Q235
Surface:
E.G. or H.G.
Color:
Yellow or White

Packaging & Delivery

Packaging Detail:pallet or as your requirements
Delivery Detail:30 days after deposited arrive us

Specifications

Pressed fixed coupler
Material:High grade carbon steel Q235
Standard:EN74/BS1139
Surface:HDG or EG

   Pressed fixed coupler  

1.Material:High grade carbon steel Q235 Q245 or as required, both forged and pressed are available.

2.Standard:we can manufacture according to standard EN74 or BS1139.

3.Anti-sliding:the inside wall of the couplers are well processed into threads for anti-sliding.

4.Type:sleeve coupers,pressed double couplers,pressed swivel

couplers,forged/pressed putlog couplers,forged swivel couplers and so on.

5.Surface treatment: hot dip galvanized or electro galvanized.



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Please help me in building professional people (scaffolding)
Please know a good personLearn slowlyWell then consider whether or not to kick offMore types of scaffolding
Q:How to calculate the vertical force of scaffolding
The calculation of steel tubular scaffold with reference to "construction safety code for steel tubular scaffold with couplers" (JGJ130-2001). Need to calculate the following eight aspects:
Q:Exterior wall scaffold construction plan?
Vertical pole:Double row scaffolding pole, pole top high eaves 1.5m structure. Single tube base for vertical rod bottom. The vertical rod joint is connected with a butt fastener, and the vertical rod and the large cross bar are connected by a right angle fastener. When the joint is staggered, the two adjacent column joints are avoided to be in the same span, and the distance between them is not less than 50cm; the distance between each joint center and the main node is not greater than 60cm.
Q:Calculation method of complete scaffold
The most distant light is closer to us than the nearest darkness:Distance is usually just a myth
Q:Are Nuclear Matrix and Nuclear Scaffold the same thing?
For most purposes, they are interchangeable terms for the same things. Some people favor one term, some the other. The ones who favor matrix over scaffold or vice versa may have some argument as to why it is better or a difference but in general people use them interchangeably.
Q:Bowl buckle scaffold inspection and evaluation
(2) the focus of quality inspection of structural parts:Steel tube wall thickness, welding quality, appearance quality, adjustable base and adjustable support rod diameter, and nut with gap and material.(3) scaffold erection shall be inspected at the stage:The first 1 paragraphs to a height of 6m for the first stage (left bottom stage) the inspection and acceptance;The 2 frame should be checked regularly with the progress of the construction, to achieve a comprehensive inspection and acceptance;3 cases of more than 6 winds, heavy rain, heavy snow after the special inspection;4 shutdown for more than a month before recovery.
Q:Specific specification for erection of civil scaffold
The surface of the steel pipe shall be smooth and free of cracks, scars, delamination, dislocation, hard bending, burrs, indentation and deep scratches.The outer diameter of steel pipe 48mm allowable deviation is 0.5mm; the thickness of the wall 3.5mm allowable deviation of.0.5mm; steel pipe surface cutting oblique deviation 1.7mm;Dressing should be checked once a year. When the examination, should be in serious pipe corrosion in the selected three roots in each part of the serious corrosion of transverse sampling inspection, the outer surface of the steel pipe corrosion depth allowable deviation is less than 0.5mm, more than the provisions shall not be used.All new and old steel pipes must be painted with anti rust paint.
Q:Is there any requirement for the installation of the disc scaffold?
Regardless of the site is the use of their own disc foot accessories, or rental of disc scaffolding accessories, before use should be carried out preliminary calculations, see how many accessories,
Q:Which kind of scaffolding is the most convenient and time-saving?
4, the new type of formwork is the most suitable for the early removal of the keel, through early demolition can save a lot of keel, formwork and support rod, saving about 30%.5, strong and durable, plug and socket is not afraid to fall, not easy to be dead by cement, easy to transport, easy to inventory. At the same time, there is no loss of spare parts, lower than the bowl buckle type multifunctional scaffold.
Q:scaffolding piercing.. do they hurt? and how much are they in england? thanks x?
Yes they hurt but like all piercings if you look after them then it wont hurt for long. If you don't like pain don't get them. I can't tell you what they cost in England as you posted your question in the Australia section.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range