Scaffolding Formwork Steel Kwikstage

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Place of Origin:
Jiangsu China (Mainland)


Model Number:
kwikstage Scaffolding
Type:
scaffolding system
Material:
Q235/225/345
Surface:
Paint,Galvanized,HDG
Color:
silver,yellow,black or as your request
Size:
48.3mm
Length:
0.5/1.0/1.5/2.0/2.5/3.0M
Thickness:
2.75/3.0/3.2/3.25/4.0mm
Standard:
EN74, BS1139
kwikstage Scaffolding:
kwikstage Scaffolding system standard
Stable:
durable

Packaging & Delivery

Packaging Detail:in bulk or pallet according to customer's requirement kwikstage Scaffolding system standard
Delivery Detail:no more than 15days

Specifications

Best price kwikstage scafffolding
Good bearing capacity .
Used time long .
Very good stability .
Covenient to transport

Kwikstage system

1.have our own factory
2.Good bearing capacity
3.Stable& durable
4.Easy to assemble or dismantle

Our capability

Produce Equipment: 4 forged production lines,2assembly line,2 bolish line ,1sets 400 punch   press,3sets 300t punch press

Produce Technology: stamping/pressing/forging;

Produce Capacity: 500 tons/month

Output: 3000 pcs/day couplers,3000pcs steel plank

Specification

1.Standard:

Thickness(mm):48.3*2.75 / 3.0 / 3.2 / 3.75 / 4.0

Length(mm):500/1000/1500/2000/2500/3000/3500/4000

2.Ledger:

  Thickness(mm): 48.3*2.75 / 3.0 / 3.2 / 3.75 / 4.0

  Length(mm):1200/1800/2400

3.Transom:

 50mm*50mm*5mm thickness steel angle  

Length(mm):600/800/1200/1800

4.Brace(diagonal)

  size:48.3*2.5mm thickness steel tube   Length(mm): 1830/2750/3530/3660

5.Bace Jack:

   Solid Base Jack:38mm(diameter)*650mm     (length)or as your request

   Hollow Base Jack: 38mm(diameter)*4/4.5/5/6mm(thickness) or as your request

size for reference

Kwikstage ItemsLength(mm)Steel GradeTheoretical Weight(kg)

Standard w/o spigot3000Q23517.5
Standard w/o spigot2500Q23514.5
Standard w/o spigot2000Q23511.5
Standard w/o spigot1500Q2358.5
Standard w/o spigot1000Q2356
Standard w/o spigot500Q2352
Ledger 3.2mm2400Q2359.26
Ledger 3.2mm1800Q2357
Ledger 3.2mm1200Q2355
Ledger 3.2mm760Q2354.3
Transom 5.0mm2400Q23522
Transom 5.0mm1800Q23513.5
Transom 5.0mm1200Q2359.6
Transom 5.0mm1000Q2358
Transom 5.0mm760Q2356
Ladder Access Tran2400Q23511.6
Ladder Access Tran1800Q23515.3
Ladder Access Tran1200Q23524
3 Board Stage Bracket3000Q2359
2 Board Stage Bracket2000Q2356
1 Board Stage Bracket1000Q2352.5
Tie Bar2400Q2357
Tie Bar1800Q2355
Tie Bar1200Q2353
Tie Bar760Q2352.1
Double Coupler Q2351.25
Swivel Coupler Q2351.25
51mm Double Coupler Q2351.3
51mm Swivel Coupler Q2351.3
Putlog/Single Coupler Q2351
Girder Gravelock Coupler Q2351.5


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:A window washer's scaffold is 12.0 ft long and weighing 75.0 lb is suspended from each end. One washer weighs?
Let the two upward forces be F1 and F2. F1 + F2 = 155 + 75 + X. Taking moment about the end near the washer of X lb 4X + 6*75 + 12* 155 = 12.*200 X = 22.5 lb ==================================
Q:While standing on a long board resting on a scaffold, a 80-kg painter paints the side of a house?
good one babe. Heres yet another for ya An airline captain became into breaking in an rather notably new blonde stewardess. The direction they have been flying had a stay-over in yet another city. Upon their arrival the captain confirmed the stewardess the ultimate place for airline workers to consume, save and stay in a single day. the subsequent morning by fact the pilot became into making waiting the team for the day's direction, he observed the hot stewardess became into lacking. He knew which room she became into in on the inn and called her up questioning what got here approximately to her. She responded the telephone, crying, and pronounced she could not get out of her room. you are able to not get out of your room? the captain asked, Why not? The stewardess responded, There are basically 3 doorways in right here, she sobbed, one is the bathing room, one is the closet, and one has a demonstration on it that asserts 'do not Disturb'!
Q:What would be a good song for Hester in the Scarlet Letter when she is standing on the scaffold?
who says by selena gomez. HAHA not really. what about regina spektor, the call or maybe dream by priscilla ahn i dunno... or maybe try the lonely by christina perri. blah. i feel like i was no help
Q:Would you rather walk across an unfinished bridge with scaffolding or a string of tooth floss?
But the tooth floss is magical if I have faith!!!
Q:how does the scarlet letter represent atonement in third scaffold scene?
Dimmesdale atones by admitting that he was a party to the adultery.
Q:What is a scaffold scene?
If you do a google search with the words scaffold scene the results are numerous.
Q:Is a scaffold piercing n a guy gay?
There are no gay piercings. If you honestly think that, perhaps piercings aren't for you.
Q:Does anyone have an Industrial/Scaffold Piercing...Please answer?
My bestfriend got his industrial piercing and while getting it done, he was holding my hand... He squeezed it so hard that it fell asleep and my eyes started tearing. So I'm assuming it hurt really bad. A lot of my other friends that got it said it hurt a lot. But with piercings, the pain is only temporary... you'll get over it. I have a bunch of piercings. I think the pain is worth it. By the way, industrials tend to heal pretty nicely. Take care of it... you might bump it a lot with your hair and whatnot. Just be careful. Clean it every day with bactine, which you can buy from a drug store, or a soap (non scented not an antibacterial one) and water mix. The piercer should give you instructions or a piece of paper telling you how to take care of your new piercing. As far as the bar and 2 rings go, I've NEVER seen anyone with two rings in their industrial. I say just go ahead and get the bar. There's no way it won't be aligned if you do decide to go with getting the 2 rings instead. Eventually, you'll trade those in for a bar and it will connect the two holes no matter what the angle. Just ask your piercer what he suggests. He'll/She'll know what's best.
Q:what is Polymer Scaffolds?
Q:Tips for someone with a scaffolding piercing?
Since everyone's anatomy is different, you'll have to get your barbells custom-bent. I don't advise doing this yourself; You should take your barbells to your piercer and have them do it.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range