Scaffolding Formwork Ladder Clamp

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Place of Origin:
Hebei China (Mainland)
Brand Name:
scaffold ladder clamp
Model Number:
scaffold ladder clamp
Usage:
Pipe Clamp
Material:
Metal
Structure:
Swivel Clamp
Standard or Nonstandard:
Nonstandard


Packaging & Delivery

Packaging Detail:Plastic bags with steel pallet or as your requirment
Delivery Detail:Within 7-15 days after receiving your prepayment

Specifications

scaffold ladder clamp
1.Material:carbon steel
2.Surface: HDG, galvanized, gold color galvanized, self-colour

Product Description  

scaffold ladder clamp


Packaging & Delivery
Packaging DetailPlastic bags with steel pallet or as your requirment
Delivery DetailWithin 7-15 days after receive the prepayment
Specifications
Material steel
SurfaceHDG, galvanized, gold color galvanized, self-coloured
AppearanceSelf-color(Black) , White, Yellow
Nut21mm,22mm,23mm
T-bolt80mm,89mm
Weight0.6~1.5kg or as your requirement
Min. Slip Load12.5KN
Distortion Load17 KN



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Erection of scaffolding accessories
When the scaffolding height of more than 20m, should be in the scaffolding outside every 4 steps to set a level of reinforcement bar, and even walls should be in a horizontal layer set pieces; set of longitudinal reinforcement bars should be continuous, and the formation of the level of closed loop; on the bottom step lower door frame scaffolding should be sealed in the mouth bar, door frame and should be located on both sides of long rod should adopt sweeping bar; fastener rack pole fastened by. Construction should pay attention to the door frame and accessories should not be mixed with the same hand rack.
Q:Fastener type steel pipe scaffold composed of two components? What are the roles?
2.1 divide the material according to the bar1) single specification steel pipe scaffold. It only uses a steel pipe specifications, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5.2) a variety of specifications of steel pipe scaffolding. The utility model is composed of two or more steel pipes of different specifications, such as a door type scaffold.3) steel tubular scaffolding. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on.
Q:I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
The general price of 3800-4200 yuan per ton, you need to see the material and specifications.1 scaffolding steel pipe material Q195, Q215 or Q235, 2 scaffolding steel pipe specifications of phi, phi, phi, phi, phi, phi, 3.25, phi, phi, phi, 2.752, 5, 3 scaffolding steel pipe length of 1-6 meters, half a meter specifications; according to customer requirements specifications4 scaffolding steel pipe standard SY/T5768-
Q:Scaffolding installation process, construction preparation
Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
Q:Should you twist and Industrial/Scaffold Piercing?
mine told me to twist it....i twist it like every day haha. nothing bad has happened
Q:scaffold pierving help please=] ???!!?
Several people have told me it hurts about the same. I do not have one, sorry couldn't be more help than that.
Q:The role of the external scaffolding and the relevant provisions?
There are many kinds of scaffolding, there are many types of scaffolding alone. According to the use, structure, decoration scaffolding scaffolding and protective scaffolding; according to the use of materials, there are bamboo scaffolding, scaffolding, metal scaffolding; according to the structure form, there are several independent bar type, frame type, bridge, hanging, hanging, pick style etc..
Q:21M high full scaffold erection scheme
2 even wall pieces must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall of the whole layer or several layers removed and then removed the scaffolding; demolition should not exceed the height of the 2 step, such as the height difference is greater than the step, should be added to strengthen the wall;3 when the scaffolding removed to the lower part of the last long rod height (about 6.5m), should be in the appropriate position to set up temporary support reinforcement, and then dismantle the wall;4 when the scaffold is divided into sections and sub sections to be removed, the two ends of the scaffold without dismantling should be added with the wall and the transverse reinforcement.
Q:How soon can you change a scaffolding piercing?
9-12 months of healing time so 9-12 months until you change it. You should never change an unhealed piercing. Take it from someone who had to retire her industrial piercing from changing it too early, leave it alone until it is 100% healed.
Q:Please help me in building professional people (scaffolding)
Ordinary scaffolding is a variety of length of steel pipe and direct, cross buckle, three kinds of fastenerClimbing scaffolding is the use of steel or steel beams to do the platform, and above the same as ordinary scaffolding

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing