Scaffolding Formwork Counter Plate

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Place of Origin:
Hebei China (Mainland)


Model Number:
standard or custom
color:
white/black/yllow

Packaging & Delivery

Packaging Detail:in bags or as your request
Delivery Detail:30days

Specifications

1.construction formwork accessories counter plate
2. Surface treatment: galvanized or not
3. Certification:ISO9001

The sizes  105*50mm, 150*50mm, 200*50mm              


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:A painter and a scaffold?
First of all...no units, no answer. Second of all...according to OSHA (Occupation Safety and Health Administration), NO ONE can walk on a scaffold beam outside the support ropes OR SET ANY OBJECT DOWN outside the support ropes. Hence the answers for both questions are 1 meter. It doesn't matter what a calculation will yield...NO ONE can walk on the beam outside the support ropes safely. Even if a torque balance yields that it will not put the ropes in compression and buckle them...it still isn't considered to be safe by OSHA if the painter is outside the ropes.
Q:A 115 kg scaffold is 7 m long. It is hanging with two wires, one from each end?
Because the scaffold is not moving, we can assume that the net Torque acting on the scaffold equals zero. Net Torque = 0 torque = Force x distance (d) Use the left end of the scaffold as the center point. This will eliminate the Torque caused by the left wire (d = 0, so torque = 0) There are now three forces creating torque on the scaffold. There is the weight (m x g) of the scaffold, at 3.5m from the left end. m1 x g x 3.5m There is the weight of the crate, located 1.4m from the left end: m2 x g x 1.4m These two torques are countered by the torque caused by the Tension (T) of the right wire, located 7m from the left side. T x 7m The sum of these torques is zero. (T x 7m) - (m1 x g x 3.5m) - (m2 x g x 1.4m) = zero solve for T T = ((m1 x g x 3.5m) + (m2 x g x 1.4m)) / 7m T = ((115kg x 9.8m/s^2 x 3.5m) + (520kg x 9.8m/s^2 x 1.4m)) = 1.58 x 10^3 N Hope this helps.
Q:In the construction of steel pipe scaffolding steel pipe and steel stamping fastener usage ratio is how much?
There are a lot of people do not know the construction of steel pipe scaffolding and steel plate and the proportion of the amount of stamping fastener is much, then let the people tell you the problem
Q:Hoisting a scaffold: newton's second law tension problem?
a million. pass to: study your answer on your question internet site. 2. form in: Newton/2nd regulation of action/guidance/info? 3. pass to: Newton's 2nd regulation of action, an get admission to on internet site considered one of headings provided. examine the precis on the precise of the internet site and something you prefer/prefer under the crimson field interior the middle of the internet site.
Q:Please help me in building professional people (scaffolding)
Please know a good personLearn slowlyWell then consider whether or not to kick offMore types of scaffolding
Q:i wanna ask regarding scaffold to any structural/civil engineer?
It is a work safety issue. Past experience has shown that scaffolding sometimes gets modified by unqualified people (or weather) resulting in injury or death.
Q:Standard for inspection of portal scaffolding
The inspection results are summarized in table NO:2008JW1658 serial number of inspection items and standard units of measurement test results 1# 2# single judge 1 Materials: 1.1 qualified door frame and accessories in addition to special requirements, the material should be consistent with the provisions of the Q235 according to GB/T 700
Q:what is common cause of formwork and scaffolding failure during construction?
I believe that you have covered it all. Improper handling covers my first thought; workers carelessness by not following safety guidlines
Q:Which kind of scaffolding is the most convenient and time-saving?
4, the new type of formwork is the most suitable for the early removal of the keel, through early demolition can save a lot of keel, formwork and support rod, saving about 30%.5, strong and durable, plug and socket is not afraid to fall, not easy to be dead by cement, easy to transport, easy to inventory. At the same time, there is no loss of spare parts, lower than the bowl buckle type multifunctional scaffold.
Q:Disc scaffolding and bowl buckle scaffolding which kind of bridge support better?
One is in any uneven slopes and ladder type foundation erection; two is the support ladder type template, template can realize the early dismantling; the three is to achieve early removal of part of the support frame, capable of setting up a passage, with four wing cornice; is the erection of climbing frame, a movable working table, efflux frame, to achieve the various functions of supporting role; five is used as storage shelves, can be used for the erection of a variety of stage, advertising support engineering. The pole is connected with a long press 600mm modulus of arbitrary function, also has a head butt function, provides the convenience for the use of special height. The utility model provides a technical support for the hanging, installing and fixing of the new type of formwork, and the utility model is used for the large-scale standardized template.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range