• Scaffolding formwork accessories base jack System 1
Scaffolding formwork accessories base jack

Scaffolding formwork accessories base jack

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

uick Details

Place of Origin:
Tianjin China (Mainland)


Model Number:
Scaffolding adjustable screw jack
Name:
factory price plate 120*120*4 standard base plate
Type:
Solid Jack; Hollow Jack
Components:
Pipe, Nut, Plate or Up U-Head
Size:
M30/M34/M38/M48
Surface:
Painted; Elecro galvanized
Length:
400mm-800mm
Color:
Silver ; blue
Certifcation:
ISO9001:2000; SGS; BV
Delivery time:
Within 10-15 days
Payment Item:
T/T ; L/C at sight

Packaging & Delivery

Packaging Detail:packed in pallent ,suitable sea transport.
Delivery Detail:10 days after receive the L/C or deposit

Specifications

120*120*4 standard base plate ,jack base ,factory price
1, Material : Q195
2. Size:dia 30, dia 32, dia 34
3. Elecro galvani

120*120*4 standard base plate ,jack base  ,factory price

Material: Q235

Adjustments from 225mm to 550mm

Surface finish: galvanized/ painted

Produced in our own factory,can control the quality much better


Samples are available

ISO 9001-2000 approved.

Performance:good bearing capacity,durable & stable

Test: SGS, BV or as per your request


OEM service is available.


These adjustable bases give stability to the structure with desired adjustments at the base.

Base Jack used as the base of the scaffolding system, to adjust the rough ground into the same level, and stablized the system.

Regular size of the Base Jack

Name

Type

Size

Screw rod(mm)

Base Plate(mm)

Adjustable

Base Jack

Hollow

38 x 4 x 600

150 x 150 x 5

42 x 4 x 600

150 x 150 x 5

48 x 4 x 600

160 x 160 x 6

38 x 5 x 400

150 x 150 x 5

38 x 5 x 500

150 x 150 x 5

38 x 5 x 600

150 x 150 x 5

42 x 5 x 500

150 x 150 x 5

42 x 5 x 750

150 x 150 x 5

48 x 5 x 400

150 x 150 x 5

48 x 5 x 500

150 x 150 x 5

48 x 5 x 600

150 x 150 x 5

Adjustable

Base Jack

Solid

30 x 400

120 x 120 x 5

30 x 600

120 x 120 x 5

32 x 400

120 x 120 x 5

32 x 600

120 x 120 x 5

34 x 400

120 x 120 x 5

34 x 600

120 x 120 x 5

35 x 400

150 x 150 x 5

35 x 500

150 x 150 x 5

35 x 600

150 x 150 x 5

38 x 500

150 x 150 x 5

38 x 750

150 x 150 x 5

45 x 400

150 x 150 x 5

45 x 500

150 x 150 x 5

45 x 600

150 x 150 x 5

Adjustable

U Head

Solid

30 x 400

150 x 120 x 50 x 5

30 x 600

150 x 120 x 50 x 5

32 x 400

150 x 120 x 50 x 5

32 x 600

150 x 120 x 50 x 5

34 x 400

150 x 120 x 50 x 5

34 x 600

150 x 120 x 50 x 5



Q:Bowl buckle scaffold inspection and evaluation
(2) the focus of quality inspection of structural parts:Steel tube wall thickness, welding quality, appearance quality, adjustable base and adjustable support rod diameter, and nut with gap and material.(3) scaffold erection shall be inspected at the stage:The first 1 paragraphs to a height of 6m for the first stage (left bottom stage) the inspection and acceptance;The 2 frame should be checked regularly with the progress of the construction, to achieve a comprehensive inspection and acceptance;3 cases of more than 6 winds, heavy rain, heavy snow after the special inspection;4 shutdown for more than a month before recovery.
Q:Cantilever scaffold technical disclosure Find satisfaction free speed!!!
Foot plate:(1) scaffold with welded steel sheet with 18# wire fence, bundled in the bar.(2) steel bar appear off, the serious corrosion of the prohibition of the use of.(3) the wire binding must use 18# wire binding, and each steel bar binding plate must be above 4
Q:I know its between chapters one and two, duh. Haha, but yeah, I needa do this thing on Edmodo for school, but i accidentally left my book in my locker.):I tried looking at online versions, but you know it's so hard, right? Looking and seeing all these different versions and I cant find the place...I need where she entered the scaffold because I need to cite where she thinks about how she's accepted her quot;sinquot;. So yeah~ PLEASE HELP! ( gt; . lt; )
i'm no longer completely constructive of the answer to this actual question, yet I only finished a unit in this novel and could like to help with any extra questions...be satisfied to invite -Alice
Q:They can see a good place to anchor it but they won't start to build the scaffolding. I've used different builders and tried different bits of the paths, but its just not working. What do I do?
Hey love, I'll try to help but right now I'm pretty exhausted so it won't be my best. I am going to link a website that has tips and tricks, and hopefully you'll see something that fits. I hate when I get provided a link that doesn't though, so I also suggest posting to the forum on the website. Strategy guide may be a good place to start. They are all die hard fans, and always happy to help. I assure you your question will be answered very quickly once you sign up. I wish I could help more, but I was more of a VV2 player. If you don't get the help you need from the forum, edit and I will look when I am able to think. ;) Also, do you think it may be a glitch or just something your missing? If you emailed lastdayofwork, they might be able to suggest a patch if that's the issue. Good luck! :)
Q:Any advise on nerves? I have 11 piercings but I'm still terrified of needles! Any tips on keeping my cool?
I got my industrial two days ago and it was my first piercing besides the standard lobes and i heard it hurt the worst of all the ear piercings and u have 11? Lol if I could do it u can do it lol I was soooooo nervous and then it just happened and not gonna lie it hurt a lot lol but what I did to distract myself I just talked really loud about the pain lol I was like O MY GOD IT HURTS SO BAD lmao and now it's a lil sore but ull be happy with the results :D
Q:How to calculate the double wall scaffolding
Calculation of bearing capacity of foundation:The average pressure of the bottom of the vertical rod foundation should meet the requirements of the formulaP = FGDesign value of foundation bearing capacity:FG = fgk x Kc = 200 kN/m2;
Q:What are the general specifications of bowl buckle scaffold?
Different specifications of the bowl buckle scaffolding accessories in the use of steel pipe materials and fasteners are different, the price is naturally the larger the price will be more expensive. What are the advantages of bowl-scaffold: Processing 1, scaffolding is very simple, the most commonly used 48 steel pipe, welding on the bowl, fastener scaffold steel pipe improvement can even use the traditional.
Q:The basic form of external scaffolding
The limit pin of the upper bowl buckle and the upper bowl buckle is arranged on the steel pipe upright rod according to the 60cm distance, wherein the lower bowl buckle and the limit pin are directly welded on the vertical rod. When the utility model is assembled, the notch of the upper bowl buckle is aligned with the limiting pin, the cross rod joint is inserted into the lower bowl buckle, and the upper bowl buckle is pressed and rotated. Bowl buckle joints can be connected at the same time 4 bars, can be perpendicular to each other or deflect a certain angle.
Q:What is the bowl buckle scaffolding, bowl buckle scaffold what are the characteristics
(1) main componentComponent for forming the main body of a scaffold. The vertical rod and the top rod are respectively provided with two kinds of specifications, and both sides of the rod are welded with a lower bowl buckle with a spacing of 600mm. If the vertical rod and the ejector rod are matched with each other for long use, the utility model can form an arbitrary height scaffold. Take a long pole, the joints should be staggered, the top layer and then leveling rod length two.
Q:Exterior wall scaffold construction plan?
Big bar:The large cross bar is arranged above the cross bar, and the inner side of the vertical rod is fastened with a right angle fastener and a vertical rod, and the length of the utility model is not less than 6m of the span of the 3m. The large cross bar is connected with a butt fastener, and the joint is arranged in a staggered way, not in the same time and in the same distance. The horizontal distance of adjacent joints shall not be less than 50cm. The distance from the joint to the riser is not more than 50cm

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords