Scaffolding Formwork Accessories Anchor Plate

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Place of Origin:
Shandong China (Mainland)


Model Number:
SD-4006A
Type:
Scaffolding Parts
Scaffolding Part Type:
formwork anchor plate
material:
Q235
winf nut weight:
0.35kg
surface:
zinc plate
waler plate size:
120*120*4mm
waler plate weight:
0.44kg

Packaging & Delivery

Packaging Detail:in steel plate or plywood plate,as your requests
Delivery Detail:20-45days

Specifications

anchor plate
1 material:Q235
2 weight:0.35kg
3 suface:zinc plate/electroplate
4 High quality competitive price

Formwork accessories anchor plate for scaffolding

1.material:Q235
2.nut weight:0.35kg
3.waler plate size:120*120*4mm

4.plate weight:0.44kg

5.suface:zinc plate,electroplate

6.Fit for 17mm tie rod

7.High quality and competitive price


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Hoisting a scaffold: newton's second law tension problem?
The force felt by the person pulling is the same as the force in the rope between the two pulleys. It doesn't matter if the person is pulling straight up (without the pulley) or straight down(with the pulley) it's the same. Therefore the weight/force is divided equally between the two ropes.
Q:I want to know the classification of scaffolding in the building
Steel pipe scaffold. The utility model is composed of two or more steel pipes of different specifications, such as a door type scaffold.
Q:What are the requirements for the construction of the scaffold eye in the building?
The surface of the steel pipe shall be smooth and free of cracks, scars, delamination, dislocation, hard bending, burrs, indentation and deep scratches.The outer diameter of steel pipe 48mm allowable deviation is 0.5mm; the thickness of the wall 3.5mm allowable deviation of.0.5mm; steel pipe surface cutting oblique deviation 1.7mm;
Q:How to remove the disc scaffolding ah, do not know how to get through the decoration
First, in the demolition of the mobile frame should pay attention to the partner can not be replaced, it is better to slow down or stop work, do not have the experience of the construction personnel to carry out the demolition work.
Q:Having problems with my scaffold/industrial piercing?
have a piercer look at it.
Q:Im planning on getting an industrial (scaffolding) ear piercing...?
via stretcher you advise gauge, ultimate? i've got in no way heard it suggested as a stretcher before, yet that would desire to easily be only an area slang differing style venture. besides, i think of gauges are suited or perhaps lovable in the event that they are smaller. bigger ones are too off-putting and that i might in no way do it myself. i like the belief of an commercial piercing nevertheless. i admire those. i myself % to get one sometime quickly. i've got needed one for a mutually as. i does no longer probably individually get a gauge, yet whilst that's what you sense works via all skill get one. i think of the commercial piercing is adequate on that is very own. i do no longer think of it should be accompanied via a gauge. besides, it sounds to be such as you needed the commercial piercing first, so which you may desire to start with that.
Q:How old do you have to be to have your hip peirced and scaffolding?
This site seems to get sicker everyday. But I finally get to give Trish a Thumbs up for a change. WTF are you people thinking. You really have some serious issues with this piercing stuff. This is mutilation.... plain and simple. Sick, Sick, Sick I'm wondering when someone is going to ask about Temple to Temple piercing.
Q:Piercing question: How do I know what size industrial/scaffold bar to get?
I originality did not read the entire introductory question, and was going to tell you to speak with your suppliers representative. LOL As if you were doing actual scaffold work. Thx for reading my irrelevant answer!!! LOL
Q:21M high full scaffold erection scheme
2 even wall pieces must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall of the whole layer or several layers removed and then removed the scaffolding; demolition should not exceed the height of the 2 step, such as the height difference is greater than the step, should be added to strengthen the wall;3 when the scaffolding removed to the lower part of the last long rod height (about 6.5m), should be in the appropriate position to set up temporary support reinforcement, and then dismantle the wall;4 when the scaffold is divided into sections and sub sections to be removed, the two ends of the scaffold without dismantling should be added with the wall and the transverse reinforcement.
Q:What does my earth science teacher mean when he says to do a powerpoint with Link Scaffolding,how d u do it?
Link Scaffolding = A search found no answer. - Ask teacher to clarify.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range