Scaffolding Formwork Accessories -Adjustable Steel Props

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Model Number:
0013
Color:
red green orange blue or as your requirement
Weight:
8-20kgs
thickness:
1.6/1.8/2.0/2.2/2.5/3.0/3.5/4.0
Diameter:
40/48/56/60

Specifications

easy to operate
steel prop with heavy loading
adjustable height
fast to set up
heavy duty steel material

Product name: scaffolding prop

Type:italian ,German,Spanish,Middle East prop, steel pipe surpport.

Adjustable height:0.8-5.5m

Pipe/Tube tickness:1.5mm-4mm

Innner Diameter:40mm,48mm,etc.

Outer Diameter:48mm,56mm,60mm,etc.

Plate type:square,flower/clover,U-head

Nut type: single handle(common,7-style, big 7-style),Cup-style/Double handle

Pin type:line stright with metal cap,line straight without metal cap,chain,G-style

Plate size:120*12*4mm,120*120*5mm,140*140*5mm/5.5mm,etc.

Surface treatment: painted,galvanized,powder coating

Color:orange,red,blue,green,white,etc.

OEM ACCEPTABLE


Steel props


Scaffolding steel shoring prop supporting system is used to support formwork system. The system composed by shoring prop, tripod, fork and H20 beam, and then put the formwork panels on the H20 beam to make slab. The maxium loading on one single prop (2-4m) is 1.1 ton when the height adjust to 4m, the high capacity of loading gurantee the safety of the whole formwork system.


DescriptionSteel Props are infinitely reusable product used to support formwork shuttering. Their telescopic function allows speedy erection and dismantling without tools and it has no loose parts to be mislaid or lost.
ComponentsSteel Tube, Prop Sleeve, U-Head and Square or other shape Plate.
FinishingPre-Galvanized, Hot Dipped Galvanized, Painted
Adjustable height1600-2900mm, 1700-3000mm, 1750-3000mm,2000-3800mm,1800-3200mm, 2000-3600mm, 2100-3900mm, 2200-4000mm, 2500-4500mm, 3500-5000mm, 4000-6000mm. etc.
Pipe thickness1.5mm - 5.0mm
Weight5.0kg 50.0kg
Inner Tube48mm, 40mm
Outer tuber48mm, 56mm , 60mm
Our advantage

1:years experince in steel structure field
2:we can provide any items according to your buliding requirment
3:we can design and manufacture according to your specirfic requirment
4:best possible service
5:OEM service is available


Heavy duty galvanized steel props

MINMAXINTERNAL TUBEEXTERNAL TUBE
1.8m3.2m48mmx2.0mm60mmx2.0mm
2.1m3.4m48mmx2.0mm60mmx2.0mm
2.2m4.0m48mmx2.0mm60mmx2.0mm
2.4m3.9m48mmx2.0mm60mmx2.0mm
3.5m4.0m48mmx2.0mm60mmx2.0mm
3.0m5.0m48mmx3.5mm60mmx3.5mm

Light duty galvanized steel props

MINMAXINTERNAL TUBEEXTERNAL TUBE
1.6m3.0m40mmx2.0mm48mmx2.0mm
48mmx2.0mm56mmx2.0mm
1.8m3.5m40mmx2.0mm48mmx2.0mm
48mmx2.0mm60mmx2.0mm
2.0m3.5m40mmx2.0mm48mmx2.0mm
48mmx3.5mm60mmx3.5mm


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to reinforce the lower part of the steel structure of the construction elevator on the roof of the non - air defense garage
On the basis of the natural foundation of the tower crane, you can balance the freedom of the height of the crane hoisting moment, a considerable weight. To 5 m X5 m X1.4 m tower base to calculate the weight of 84 tons.
Q:How much is the triangle angle support window, bearing?
The concrete parameters that affect the bearing capacity are as follows;
Q:The construction scheme of the steel pipe support frame
It is important to note that the length of the front beam is usually 1.1 m -1.3 M. The maximum extension shall not exceed 1.7 meters, if the construction needs, the front beamLength of more than 1.3 meters, must take corresponding safety measures, accordingly reduce work load or increase the weight, guarantee of safety against overturning coefficientIn 2(5) the steel wire rope is fixed at one end of the reinforcing steel wire rope and the rolling wheel which is connected with the front beam, and the steel wire rope clamp is tightly screwedThe utility model is characterized in that: the utility model is characterized in that: the utility model is characterized in that: a pin shaft of the small connecting sleeve is arranged on the other end of the steel wire rope, and the closed end of the rope passing through the rigging spiral buckle is fixed with a steel wire rope clamp to adjust the screw of the screw buckle.(6) the working steel wire rope and the safety rope are respectively fixed on the front beam steel wire rope hanging plate according to the above method, and an upper limit block is arranged at the proper place of the safety wire.
Q:Why should the deep foundation pit support axial force monitoring?
There is a problem with our numerical axial force meter measured are small, usually the first force only after the pre 30%~70% value, sometimes even very small, and they force to support unit said, as a result of retaining wall (pile) large deformation,
Q:In the construction site template support must be equipped with vertical and horizontal sweep bar
For the formwork support, the floor must be set to sweep the floor, no matter how high the height of the frame
Q:Big steel pipe support painted what color look good
This color has a hint of warmth, like polished bronze, polished.
Q:What are the requirements for acceptance of steel support
What are the requirements for acceptance of steel supportAcceptance criteria for BRB product, only in China's 2010 version of "code for seismic design of buildings" (GB 50011-2010) and "technical specification for steel structure of tall buildings" (JGJ99-2010) manuscript has been mentioned, but the standard is still low:
Q:Steel support lease 700 tons, the total amount of money per day
The key is to see this steel support lease fee 700 tons is to let you rent a few days, with the rental fee divided by the total number of days to be able to calculate how much the daily rent.
Q:Subway construction of steel support needs qualification
From a professional point of view, the difference between light rail and subway, is not in heaven and earth, but in the heavy rail and the maximum cross section passenger flow: Rail weight per meter 60 kg per hour, 15 thousand passengers to 30 thousand passengers called light rail; rail weight per meter 60 kilograms, call the subway traffic per hour to 30 thousand 60 thousand passengers.
Q:For the deep foundation pit supporting steel purlin supporting scheme of a
The steel sheet pile is inserted into the steel sheet pile: the first pile is inserted into the continuous steel sheet pile and is inserted into the design depth of the steel sheet pile supporting system of the foundation pit along the front pile buckle grooveSteel plate pile construction setting allow error: pile top elevation deviation + 100mm steel plate pile axis deviation + + 100mm steel plate pile verticality deviation 1%; should be monitored in the allowable error rangeSteel plate piles with steel sheet pile, pile deviation, making itself the error limitation of construction to ensure the actual degree of steel sheet pile curtain according to the standard width of the integer times of steel sheet pile curtain end closed up by the difficulty of adjustment phase do like profiled steel sheet pile closure or through adjusting curtain axis using standard pile to achieve closure due to the engineering precision of sheet pile wall the realization of high angle closure of the corner on both sides of the 10 sheet pile width adjustment axis to achieve closure is Department of steel sheet pile by welding of foot like fish plates for welding to avoid two adjacent pile connected with the depth of 1M and the appropriate position should be connected to the wrong place pile spacing

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range