Scaffolding forged swivel Beam coupler

Ref Price:
Loading Port:
Nanjing
Payment Terms:
TT OR LC
Min Order Qty:
1000 pc
Supply Capability:
50000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

SPECIFICATIONS:

1 MATERIAL:Q235

2 SWIVEL AND DOULE RIGHT ANGLE COUPLER

3 DROP FORGED AND PRESSED

4 BS1139 AND EN74 STANDARD

5 SIZE:48.3*48.3MM

6 PRESSED AND DROP FORED SWIVEL AND FIXED COUPLER/PUTLOG COUPLER/SLEEVE COUPLER/INNER CONNECTOR/BEAM COUPLER ETC.

Pressed swivel coupler 1.02kg  galvanized/ hot dipped galvanized

Pressed fixed coupler  0.85kg  galvanized / hot dipped galvanized

DROP FORGED SWIVEL COUPLER   0.98kg       galvanized / hot dipped galvanized

DROP FORGED SWIVEL COUPLER   1.12kg  

DROP FORGED PUT LOG COUPLER  0.62KG    galvanized / hot dipped galvanized

DROP FORGED SLEEVE COUPLER     1.1KG    galvanized / hot dipped galvanized

DROP FORGED  FIXED BEAM COUPLER     1.45KG    galvanized / hot dipped galvanized

DROP FORGED SWIVEL GRINDER COUPLER     1.5KG    galvanized / hot dipped galvanized

7  SUITABLE FOR PIPE DIAMETER:48MM,48.3MM,60.3MM

8 Payment terms:30%TT deposit, balance against BL copy or LC at sight

9 FOB .CIF.C&F ,CFR acceptable

10 Delivery time;20-30days after receiving deposit


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to remove the disc scaffolding ah, do not know how to get through the decoration
Second, the demolition of disc type scaffolding parts down to classify storage and management, in order to transport, but also a process of removing parts check the parts, to separate the deformation, the rusty parts, don't put the next time in construction.
Q:Standard Specification for bowl buckle scaffold
The utility model has the advantages of reasonable structure, simple manufacturing process, easy operation and wide application range, and can fully meet the construction requirements of buildings, bridges and culverts, tunnels, chimneys, water towers and other buildings
Q:Hoisting a scaffold: newton's second law tension problem?
The force felt by the person pulling is the same as the force in the rope between the two pulleys. It doesn't matter if the person is pulling straight up (without the pulley) or straight down(with the pulley) it's the same. Therefore the weight/force is divided equally between the two ropes.
Q:What is the importance of the second scaffold scene in the Scarlet Letter?
It is less about Hester because she has accepted her punishment. It is more about Dimmesdale.
Q:21M high full scaffold erection scheme
2 should be based on the results of the inspection to improve the construction organization design of the demolition of the order and measures, approved by the competent authorities before the implementation;3 removal of debris and ground barriers on the scaffold.4.2 removal of scaffolding, should meet the following requirements:
Q:What's the difference between scaffold and industrial piercing?
Nothing... The piercer will use an extra long barbell, most likely a 14 gauge.. too.
Q:What are the functions and requirements of the masonry wall
6, vertical closure: from the second step to the fifth step, each step required in the outer row of pole side door set like baluster 1.00m high and block feet or to set up protective net, rod (net) and the vertical rod fastened; more than fifth steps in a protective railing, should all the safety fence or security legislation net; in the street or densely populated areas, should be from the second step, the safety fence or outside of all network security legislation.7, scaffolding erection should be higher than the top of the building or the operating surface of 1.5m or more, and add enclosure.
Q:What is a bar in the scaffold
Scaffolding is 1.5 meters of the cross bar is called the cross bar; long to such as the steel pipe is generally called the 6 horizontal pull rod
Q:what is common cause of formwork and scaffolding failure during construction?
Improper assembly seems to be a big one. Workers often neglect to install the internal diagonal from upper corner to opposite lower corner when it comes to scaffolding. Formwork usually fails by inadequate bracing at the bottom as hydrostatic pressure builds. This can be mitigated to some extent by allowing the concrete to set up a bit before pouring the next layer. For earth formwork, you have to be real careful about expansive clay becoming saturated and overwhelming the bracing as it expands.
Q:how long will a scaffold piercing take to heal?
They take around 6-9 months to heal completely...you shouldn't be taking it out at all. I stupidly took mine out after 3 months to clean a bit behind the bar and the bar would never go back through the top hole. It hurt like crap and bled profusely if I tried to push it through.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range