scaffolding forged double coupler

Ref Price:
Loading Port:
Nanjing
Payment Terms:
TT OR LC
Min Order Qty:
1000 pc
Supply Capability:
30000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

SPECIFICATIONS:

1 MATERIAL:Q235

2 SWIVEL AND DOULE RIGHT ANGLE COUPLER

3 DROP FORGED AND PRESSED

4 BS1139 AND EN74 STANDARD

5 SIZE:48.3*48.3MM

6 PRESSED AND DROP FORED SWIVEL AND FIXED COUPLER/PUTLOG COUPLER/SLEEVE COUPLER/INNER CONNECTOR/BEAM COUPLER ETC.

Pressed swivel coupler 1.02kg  galvanized/ hot dipped galvanized

Pressed fixed coupler  0.85kg  galvanized / hot dipped galvanized

DROP FORGED SWIVEL COUPLER   0.98kg       galvanized / hot dipped galvanized

DROP FORGED SWIVEL COUPLER   1.12kg  

DROP FORGED PUT LOG COUPLER  0.62KG    galvanized / hot dipped galvanized

SLEEVE COUPLER     1.0KG    galvanized / hot dipped galvanized

DROP FORGED  FIXED BEAM COUPLER     1.45KG    galvanized / hot dipped galvanized

DROP FORGED SWIVEL GRINDER COUPLER     1.5KG    galvanized / hot dipped galvanized

7  SUITABLE FOR PIPE DIAMETER:48MM,48.3MM,60.3MM

8 Payment terms:30%TT deposit, balance against BL copy or LC at sight

9 FOB .CIF.C&F ,CFR acceptable

10 Delivery time;20-30days after receiving deposit


NO

SPECIFICATION

1

Dimensions

48.3*48.3

2

Material

Q235,Q345

3

Nut

17mm,19mm,21mm,22mm,23mm

4

T-bolt

80mm,86mm,89mm

5

Weight

0.95-1.0kg or according to your requirements.

6

Standard

EN74,BS1139,CE,China domestic standard , as well as SGS Test Report.

7

Process

Forged.

8

Surface treatment

Black , Zinc plated ,Hot dip galvanized.

9

Color

Self-color(black), White, Yellow.

10

Style

British.

11

Feature

High Breaking Strength , Skidproof &Antirust.

12

Price

reasonable & wonderful.

13

Accessories

Bolt,Nut&Shim.

14

OEM service

available.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

  2. More details. 



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the minimum spacing between the crossbar and the pole spacing of the scaffold?
Send a mail to you, but whether you can give the best answer, huh, huh
Q:Bowl button scaffolding in the bowl buckle joints of what components
XPS board is extruded board, you say which one is good .... you think EPS insulation board, right?
Q:According to the "construction of fasteners steel scaffold safety technical specifications", the structure of the pole which
There are many kinds of insulation materials, the process is not the same
Q:On the scaffolding sweeping pole, vertical and horizontal and vertical cross on the issue of conflict.
2 Residential gas introduction pipe should be located in the kitchen, outside the corridor, and the kitchen connected to the balcony (cold area when the wet gas when the balcony should be closed) and other easy to repair the non-residential room
Q:My neighbour has built scaffolding in my garden?
If this is obstructing your access then you hae a right to have this moved tell your neighbour that you need to remove the scaffolding ..Also tell the contractor that you will need to see a copy of the permission that has been given .If none of this is available then ask them to remove the scaffolding then contact you land Lord as he will have the right to charge a fee for either the removal of the scaffolding or the time it is on his land and has the right to refuse permission to have it on his land
Q:swollen scaffold piercing! HELP?
The piercing is most likely very irritated. Just keep cleaning it. Be extremely careful around it now, because it probably hurts. xD If it continues for more than a week or two, go see your piercer.
Q:New scaffold (industrial) piercing?
Crusting is totally normal. I got my industrial pierced almost a year ago and it got crusty pretty regularly for the first six or seven months, so don't worry about that. Swelling and throbbing are signs or irritation or possible infection. Your ear might just be angry if you've hit it or got it caught on things a few too many times, but it could be infected. Keep washing it with warm salty water and consider having a reputable piercer take a look at it.
Q:Is the scaffolding off of the Duomo in florence?
A local newspaper, on june the 3rd wrote that the restauration of the part of the Duomo called Porta della Mandorla (something like Almond Door) was finished and the scaffolders are down. (I looked for it in italian google news) This are news, but I was not personally there. Anyway Florence is so full of beautyes that you can't miss it.
Q:What are the design requirements for fastener type steel pipe scaffolds
Upstairs do not understand the air conditioning Oh, you can change the outdoor unit plus a four-way valve on it, the principle is very simple, the compressor is out of the hot air, do not change the valve outside the machine is hot air, To the valve to reverse the direction of the fluorine (the compressor does not change) the room can blow the hot air, of course, plus the valve if you say that and the performance of the TV and then follow the porphyry rescue Hanmer, But also for the circuit version, but not too much necessary. You put the valve to get a separate power plug, summer do not plug. Winter with the re-inserted, the need to defrost when the external machine unplug the plug. As for the cost of what, but also the best valve in the 100 yuan, cheap only 40 yuan or so, but also need to re-fluoride, fluoride costs and your local market, the general maintenance of the replacement valve costs 240 yuan Around (this is the air conditioning warranty settlement fee) only for reference. General maintenance points can be changed.
Q:Is it safe to use a 40' ladder supported by 6' scaffolding?
Ladder On Scaffolding

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range