scaffolding for sale: Cup-lock scaffolding System Pressed Bottom Cup
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Model Number: | MTH0401-MTH0407 | ||||
.Material: | Steel Q235 | Certificate: | ISO9001:2008 | surface: | galvanized or black. |
Weight:: | 0.27kg. | Name: | scaffolding for sale: Cup-lock scaffoldi |
Terms of payment:
L/C and T/T
experience:
10 years
sample:
free
Packaging & Delivery
Packaging Detail: | To be packed in pallet or carton or Big bags or to buyer's requirement . |
Delivery Detail: | with 20 days after confirming the order |
Specifications
scaffolding for sale: Cup-lock scaffolding System Pressed Bottom Cup
1.Material:Q235
2.surface: galvanized or black.
3.wei
Scaffolding top cup Product Description
scaffolding for sale: Cup-lock scaffolding System Pressed Bottom Cup
1.Material:Q235
2.surface: galvanized or black.
3.weight :0.45kg,0.53kg.
4.sample: free.
Our Advantage
1.Dedicated attitude and attention on metal-forming industry;
2.Specialized in stamping, casting, forging process;
3.Completed product delivery system;
4. We submit required products by reasonable cost;
5. Trustworthy business partner, perfect after-sales service!
- Q:How to calculate the vertical force of scaffolding
- First, the calculation of small beams: small beams in accordance with the strength and deflection calculation of simple beams, small bars in the upper bar. According to the small bar scaffold board and live loads above the maximum bending moment and deformation the uniform load calculation of small bar.
- Q:Which God can tell me what is required, how to get ah?
- Regardless of the site is the use of their own disc foot accessories, or rental of disc scaffolding accessories, before use should be carried out preliminary calculations, see how many accessories,
- Q:I'm a civil engineering student and we were asked to submit a paper about designing a simple scaffolding. I just want to see a sample paper so that I would know what details should I include.
- can't draw here, but it's just an x with a flat board on top in 3 dimensions.
- Q:How to calculate the rental price of portal scaffolding
- Fierce competition, is 2 yuan / sets / dayPulleys, pedals, and base are normally 1 yuan per day
- Q:New features of quick dismantling scaffolding?
- Material: the main keel is made of cold rolled steel with 2mm thickness
- Q:Erection of scaffolding accessories
- Erection of scaffolding accessories:Door frame should be installed from one end to the other end of the extension, and layer by layer to change the direction of the set, not the opposite. After the completion of one step, should check and adjust its level and verticality. Scaffolding should be built around the building, continuous, synchronous erection elevation, in the form of a closed structure around the building; if not closed, the scaffold should be added at both ends of the wall.
- Q:Specification for construction steel pipe scaffolding and construction safety rules?
- Construction preparation1, materialThe steel pipe diameter is 48 or 51mm, wall thickness is 3 ~ 3 5mm or hot-rolled seamless pipe joints, used as the main column, a large bar, a small bar, inclined support.The connecting member: rotary buckle, square buckle, buckle, docking barge core.The base made of phi 40 steel tubes and 4 ~ 5mm steel, used for main column stepping. The floor area of the base should not be less than 200C.
- Q:i am getting my industrial (scaffold) pierced on one ear and i want my cartilage on the other ear, how long do i have to wait between them? What are pros and cons for industrial (scaffold)? what are risks and stuff and how much is it? i want to get it so any information or anything i should know would be great thanks especially for industrial:)
- You can have both done in the same day if you can handle the pain and shock. Get the industrial done first, and if you still feel OK afterwords, you can get your other ear done by the same piercer. Talk to him/her and let them know what you want to do before you start. If you feel like you need to wait after the industrial, wait at least a day before getting the second piercing. It's all about what you can handle.
- Q:Exterior wall scaffold construction plan?
- Vertical pole:Double row scaffolding pole, pole top high eaves 1.5m structure. Single tube base for vertical rod bottom. The vertical rod joint is connected with a butt fastener, and the vertical rod and the large cross bar are connected by a right angle fastener. When the joint is staggered, the two adjacent column joints are avoided to be in the same span, and the distance between them is not less than 50cm; the distance between each joint center and the main node is not greater than 60cm.
- Q:hi, ive had my scaffolding for a little over a month now, and one of the holes has started going really weird. on the top, its swollen and sore on one side, and on the bottom, its the same but on the opposite side. not sure if its infected ir being rejected by ear, which ive heard can happen. i would like to keep it in if possible,as i love it. any help welcomed :) thanks xx
- I've also had my scaffolding and I had the same issue. It was totally normal, I went back to the peircing place and asked if this was regular for the piercing. They said it was and to proceed with the cleaning process etc. they said it just has scabs because its healing :)
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
scaffolding for sale: Cup-lock scaffolding System Pressed Bottom Cup
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords