Scaffolding Double Pipe Coupler with top quality CNBM

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t
Supply Capability:
3000 m.t/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Quick Details

  • Material: Carbon Steel

  • Technics: pressed

  • Type: Coupling

  • Model Number: KZ48-1

  • Connection: bolts

  • Shape: right angle

  • Head Code: Hexagon

  • Usage: Pipe Clamp

  • Structure: Fixed type

  • Standard: BS1139/EN74

  • Workmanship: pressed

  • Surface: Galvanized/painted

2.Packaging:pallet

3.Product Description

Model No: FAS-LP

Model Name: Scaffolding Hook-Lock Pin

Features:

1) Material: made of  Φ9 steel bar.

2) Surface: electro-galvanized/hot dipped galvanized

3) Weight: 0.1kg

4.


Model

Description

Weight(kg)

Weight(lbs)

AR.DB.3050x2000

Ring   Lock Bay Brace 3050x2000mm (10')

10.87

23.96

AR.DB.2745x2000

Ring   Lock Bay Brace 3050x2000mm (10')

10.24

23.96

AR.DB.2440x2000

Ring   Lock Bay Brace 2440x2000mm (8')

9.62

21.20

AR.DB.2130x2000

Ring   Lock Bay Brace 2130x2000mm (7')

9.03

19.91

AR.DB.1830x2000

Ring   Lock Bay Brace 1830x2000mm (6')

8.51

18.76

AR.DB.1520x2000

Ring   Lock Bay Brace 1520x2000mm (5')

7.91

17.45

5.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Scaffolding Double Pipe Coupler with top quality CNBM

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:I would like to know what the scope of responsibility for the construction engineering supervision is specific
Especially when the project quality accident and other accidents need to be investigated, the supervising enterprise or the supervisor is often in a passive state of fear or fear , With the resignation of life to describe the situation at this time and then appropriate
Q:Seeking real estate development project emergency rescue plan, the word asked a little more. Thank you
2 Hazard Analysis 21 Project Overview (omitted) 22 Hazard Source According to the characteristics of the project engaged in the project, the following projects are mainly mechanical equipment, electrical welding, aerial work and other construction
Q:A man is 2 ft from 1 end of a 6 ft plnk spprted at each end by scaffold. How much wght is spprted at each end?
the 4 ft end will support 66,66% of the weight and the 2 ft end will support 33,34% of the weight
Q:Will the equipment based on the beam column and other structures, can not be poured once completed, should be set up civil construction or fixed?
So do the project budget review work, will help improve the design level and investment efficiency
Q:71.0-kg painter is on a uniform 22.0-kg scaffold supported from above by ropes. How close to the left can he approach safely?
At the threshold of danger, the tension on the far rope reaches zero. (a) Distance from left edge = x; then summing moments about the left rope gives ΣM = 0 = 71.0kg * g * (1m - x) - 22.0kg * g * 2.0m - 6.0kg * g * 1m The g term cancels, and the rest solves to x = 0.296 m ◄ (b) Distance from right edge is X; summing about the right rope, and knowing the g terms will cancel, ΣM = 0 = 22.0kg * 2m + 6.0kg * 3m - 71.0kg * (1m - X) leads to X = 0.127 m ◄ Hope this helps!
Q:Why the height increase of ten centimeters increase in housing ten percent
Increase the cost of ten centimeters increase in housing costs by about three percent
Q:a scaffold that weighs 300n supports two painters. one of the painters weighs 250n and the other weighs 300n.?
Total weight is 300+250+300 = 850 weight on other scale is 850–400 = 450 newtons
Q:A man of mass 74.4 kg stands on a scaffold supported by a vertical rope at each end. The scaffold has a mass o?
Left rope = T1 Right rope = T2 1/6 of 3.9 m = 0.65 m 3.9/2= 1.95 1.95 - 0.65 = 1.3 m from right rope. Take g = 10m/s^2 T1 = ((219 x 3.9)/2) + (744 x 1.3) = 1394.25 1394.25 = 3.9 x T1 1394.25/3.9 = T1 = 357.5 N (answer for left rope) T2 = ((219 x 3.9)/2) + (744 x (3.9 -1.3)) = 2361.45 2361.45 = 3.9 x T2 2361.45/3.9 = T2 = 605.5 N (answer for right rope)
Q:At the scaffold, Dimmesdale sees 3 people before Hester and Pearl. Who are they, what do they represent?Help!?
First I would like to acknowledge that this question is from the book: The Scarlet Letter by Nathaniel Hawthorne
Q:Construction technology measures fee is directly into the sub - project costs
Division of project costs only include human labor costs, materials, machinery, business management fees and profits

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range