Scaffolding Cuplock System Safe Durable for Construction CNBM

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  • Quick Details of Scaffolding Cuplock System Safe Durable for Construction

  • Type: Heavy Section Steel

  • Forming: Welding Products

  • Standard:GB, ASTM, DIN, JIS, AISI, BS, En74,Bs1139

  • Member:Steel Column

  • Trademark:Quality Carbon Structural Steel and Alloy Structural Steel

  • Connection Form:Welded Connection

  • Carbon Structural Steel:Q235,Q255,Q345

  • Residential Wall Structure:Wall Support

  • Type of Steel For Building Structure:High-Strength Steel

  • Bs1139, En74 Standard:Tube :48.3mmx3.25mm/2.5mm

  • Export Markets:Global


  • Scaffolding Cuplock System Safe Durable for Construction CNBM

  • Scaffolding Cuplock System Safe Durable for Construction CNBM



  • Scaffolding Cuplock System Safe Durable for Construction CNBM

Descriptions of  Scaffolding Cuplock System Safe Durable for Construction

Cuplock is a kind of multi-purpose and versatile modular system scaffolding, suitable for access and formwork support in all types of construction of building & civil engineering projects, offshore projects, etc. This complete galvanized Cuplock system is probably the fastest and most widely preferred scaffolding system. It has flexible erection as straight, curved or circular configuration for both access and support purposes.


Futures of  Scaffolding Cuplock System Safe Durable for Construction

Multi-functional-with the universal joint and fully interchangeable components, the cuplock system can be used in most construction projects for both formwork and access. It is very versatile and diverse. Use in the shipping industries, oil and gas and aviation industries.
Versatile-Verticals are assembled with horizontals and diagonals using secure fixed cup connections. Its versatility has a distinct advantage to conventional scaffolding methods. A positive & ridged connection of four units is achieved in one single action. The cupock system is very cost effective and can be erected safely and quickly.
Time saving-cuplock scaffold is the solution for temporary structures Performance stages. Small teams can erect it safely and quickly.
Economical-Easily assembled system scaffold saves time and labor costs.
Durable-All components are hot dip galvanized and manufactures to international standard.
Easily Stored-Individual pipe elements can be packed in bundles for easy storage and transportation. For returns, material can be packed in steel racks.

  • The Main Components of  Scaffolding Cuplock System Safe Durable for Construction

  • Verticals

  • Description

    Material

    kg/pc

    Article No.

    9'10" Vertical 3.00m

    Q345 φ48.3×3.2

    16.90

    SC1001 3000

    8'2" Vertical 2.50m

    Q345 φ48.3×3.2

    14.20

    SC1001 2500

    6'6" Vertical 2.00m

    Q345 φ48.3×3.2

    11.60

    SC1001 2000

    4'11" Vertical 1.50m

    Q345 φ48.3×3.2

    8.90

    SC1001 1500

    3'3" Vertical 1.00m

    Q345 φ48.3×3.2

    6.20

    SC1001 1000

    1' Vertical 0.50m

    Q345 φ48.3×3.2

    3.50

    SC1001 0500

Horizontals

  • Description

    Material

    kg/pc

    Article No.

    10'0" Horizontal 3.05m

    Q345 φ48.3×3.2

    11.80

    SC1002 3048

    9'0" Horizontal 2.74m

    Q345 φ48.3×3.2

    10.70

    SC1002 2743

    8'2" Horizontal 2.50m

    Q345 φ48.3×3.2

    9.80

    SC1002 2500

    7'0" Horizontal 2.13m

    Q345 φ48.3×3.2

    8.40

    SC1002 2133

    6'6" Horizontal 2.00m

    Q345 φ48.3×3.2

    7.90

    SC1002 2000

    6'0" Horizontal 1.83m

    Q345 φ48.3×3.2

    7.20

    SC1002 1828

    5'11" Horizontal 1.80m

    Q345 φ48.3×3.2

    7.10

    SC1002 1800

    5'0" Horizontal 1.52m

    Q345 φ48.3×3.2

    6.10

    SC1002 1524

    4'11" Horizontal 1.50m

    Q345 φ48.3×3.2

    6.00

    SC1002 1500

    4'1" Horizontal 1.25m

    Q345 φ48.3×3.2

    5.00

    SC1002 1250

    4'0" Horizontal 1.22m

    Q345 φ48.3×3.2

    4.90

    SC1002 1219

    3'6" Horizontal 1.07m

    Q345 φ48.3×3.2

    4.30

    SC1002 1067

    3'3" Horizontal 1.00m

    Q345 φ48.3×3.2

    4.10

    SC1002 1000

    3'0" Horizontal 0.91m

    Q345 φ48.3×3.2

    3.80

    SC1002 0914

    2'11" Horizontal 0.90m

    Q345 φ48.3×3.2

    3.70

    SC1002 0900

    8'0" Horizontal 2.44m

    Q345 φ48.3×3.2

    9.50

    SC1002 2438

    1'10" Horizontal 0.57m

    Q345 φ48.3×3.2

    2.40

    SC1002 0600

  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:in the scarlet letter, what events happen at the scaffold during the night??
On the Scaffold Dimmesdale is really starting to go crazy. the guilt in his heart about loving hester is eating him up. he goes onto the scaffold thinking no one will see him. he is punishing himself. he yells out and thinks that it will be the end of his secrect but no one hears him. they just think he is the cry in the night. then reverend wilson comes along. but he doesnt see dimmesdale. then hester and pearl walk by they notice them. they come up on the scaffold. Pearl asked dimmesdale if he would stand with hester and her at noon the next day but of he says no that he will only stand with them on Judgement Day. then they see the scarlet letter in the sky and the town people thought that it was just an a for angel because the gov passed away. they next day wilson finds dimmesdale's glove on the scarrold but he thought that the devil put it there. i cant remember what chapter it is in but it is toward the middle good luck with the book i loved it
Q:Method for inspection of foot hand frame fittings
GB15831-2006 steel pipe scaffold fastenerGB_5725-2009 safety net
Q:What are the requirements for the construction of the scaffolding structure?
The invention also provides an anchoring device for anchoring a scaffold structure to a building. Arm with longitudinal axis. The anchoring device further comprises an anchoring device which is fixed to the building by the anchoring device and the scaffold structure.
Q:How is Hester changed by the 7 years which elapse before her final stand on the scaffold?
you can see how weak morally dimmesdale is, because he keeps his hand over his heart all the time, and is constantly beating himself up over his crime. he whips himself in the closet, and brands himself with a scarlett a to match hesters. hester... when she first walks out on the scaffold she can be seen as defiant, as if she isn't ashamed of the embellished letter a she wears. the cottage she lives in is on the edge of the town, bordering the forest. towards the end of the 7 years, her actions can be seen as repent maybe for her crime: she is a self ordained sister of mercy, helps the poor and homeless, sews... and the a turns from adultery to able
Q:Standard Specification for bowl buckle scaffold
Compared with other types of scaffolding, bowl buckle type multifunctional scaffolding is a new scaffold with broad development prospects.
Q:Topic?Scaffolding construction program how to doSpecial construction scheme
Full support calculation method:1, determine the above line load (ie, the length of a variety of meters, take the maximum);2, to determine the bearing capacity of the foundation (through the strengthening of the bearing capacity);3, according to the bearing capacity of the foundation, about how many square meters per square meter to determine the vertical tube, assigned to specific point load;4, to determine the number of tons of vertical pipe can be per ton (according to pipe diameter, wall thickness calculation of allowable stress);
Q:what is the height of a scaffold if the person is 6ft tall?
Whatever they set it at. It could be 1 foot, 4 feet, or 20 feet. How tall a person is, is irrelevant.
Q:Industrial/Scaffolding piercing swollen and sore?
1. go and see the piercer... 2. go to a doctor 3. kepp doing what your doing
Q:Scaffold Piercing Im 15 Help.?
Sorry to rain on your parade, but neither of those plans will work. Scaffold piercings need to be lined up a certain way in your ear, so you can't start with an existing piercing because you can't change your ear to fit what is already pierced. Scaffold piercings also need to heal with a bar in for them to be able to support a bar. You can't just get 2 cartilage piercings and stick a bar through. They won't line up and may not be able to support the extra weight of the bar, and migrate out. Seriously, do some research and wait until you are 16 at least.
Q:What are the full house scaffolding specification
5 "technical code for safety of steel tubular scaffold for building construction" (JGJ128-2000)6 "construction formwork safety technical specifications" (JGJ162-2008)

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range