scaffolding cup lock system Ladders & Scaffoldings

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 PCS
Supply Capability:
10000 PCS/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Material:

Q235, Q345

Surface treatment:

HDG/ painted/EG

Tube size of standard:

48.3X3.25 MM

Technique:

Stamping, shearing, bending, welding





Packaging & Delivery

Packaging Detail:pallet or as your requirements
Delivery Detail:30-40 days after the order conformation

Specifications

scaffolding cup lock system manufacturer 
1.Approved by ISO9001 
2.Safe, easy to assemble, heaving loading 
3.Best price

scaffolding cup lock system

 

We are a professional manufacturer of scaffolding cup lock system

 

Features of  scaffolding cup lock system

NameSizeLengthSurface treatmentColour

scaffolding cup lock system standard

(Q234,Q345)

48.3*3.25MM

 

500;

1000;

1500;

2000;

2500;

3000;

3500MM;

etc.

 

painted;

hot-dipped galvanized;

electro-galvanized;

powder-coated 

upon

your request

 

 

 1. Quality: safe working, easy to assemble and heavy loading capacity 

 2. Approved by ISO9001-2000, AS1576, EN74, BS1139

 3.Term: FOB Qingdao(or upon your request)

 4. Payment: T/T, 30% in advance, 70% against the copy of the B/L

 5.We also undertake designing and manufacturing according to your request

 

 

 

If you are interested, please feel free to contact me for the best price!


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the requirements for acceptance of external scaffolding? Want to know before
5, the level should be closed: the first step, every step or two, covered with planks or hand foot fence, scaffolding to laying along the long, joints should be overlapped in the small bar, do not appear short board. And in between in the pole and the wall every four steps long laying safety bottom fence.
Q:The relevant provisions of the demolition of the external wall scaffold:
The relevant provisions of the demolition of the external wall scaffold:First, the removal of scaffolding before the accurate preparation work should meet the following requirements:1, should be a comprehensive inspection of the scaffold fastener connection, even wall pieces, support system, etc. are in line with the requirements of the structure;2, should be based on the results of the inspection to improve the construction organization design of the demolition order and measures, approved by the competent authorities before the implementation;3, should remove the scaffolding on the debris and ground obstacles.
Q:examples of scaffolding?
Google these 1) Independent scaffold 2) Putlog scaffold 3) Birdcage scaffold
Q:Fastener type steel pipe scaffold composed of two components? What are the roles?
Bowl buckle steel pipe scaffolding when using steel pipe, as a "single steel pipe scaffolding"; when using the steel cross bar, for the "steel pipe based scaffold".2.2 according to the vertical and horizontal transmission force between the vertical and horizontal1) the frictional force acting on the contact surface. That is, the friction force at the contact surface of the joint is pressed to support the load of the cross bar and is transmitted to the vertical rod;2) welding force. Most of the cross bar and vertical rod socket connection is used in this way, the door frame is also this way;3) direct pressure transmission. This method is more common in the horizontal bar placed in the top of the scaffolding;4) shear force of pin. That is to say, the connecting rod and the hole of the vertical rod are connected by the pin rod through the vertical connecting plate of the transverse rod to realize the double side shear action of the connecting rod and the pin rod. This method is rarely seen in the connection between the rod and the vertical rod.
Q:Method for inspection of foot hand frame fittings
Should adopt the current national standard "straight welded steel pipe" GBT 13793
Q:Questions about Scaffold (aka Industrial) piercings?
Ask how long they have been piercing and what certifications (if any) they carry, additionally verify close by regulations to ascertain if any are required. additionally ask how generally they spore verify their autoclave and while it grew to become into accomplished final time. Ask to ascertain a portfolio of HEALED piercings, exceptionally pictures of in spite of piercing you try to get.
Q:Having problems with my scaffold/industrial piercing?
If so, its hypertrohic scarring, a common occurence in cartilaginous piercings caused by too much jewelry movement/improperly fitted jewelry. It can be treated by applying tea tree oil to the bump once or twice a day.
Q:would a scaffold piercing look gay on a guy?
No, it would not look gay on a guy. I know plenty of guys who have them. However, it will look silly on anyone if their ear is not shaped properly to accommodate a scaffold piercing....
Q:Erection of steel scaffolding tools and safety supplies
Safety belt, safety helmet, gloves, rope, steel shear, ribbon sling (sling)
Q:Specification for construction steel pipe scaffolding and construction safety rules?
Construction preparation1, materialThe steel pipe diameter is 48 or 51mm, wall thickness is 3 ~ 3 5mm or hot-rolled seamless pipe joints, used as the main column, a large bar, a small bar, inclined support.The connecting member: rotary buckle, square buckle, buckle, docking barge core.The base made of phi 40 steel tubes and 4 ~ 5mm steel, used for main column stepping. The floor area of the base should not be less than 200C.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range