scaffolding cup lock scaffolding for sale

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Brand Name:

bridgesteel

Model Number:

48*48mm



type:

cup lock scaffolding for sale

surface treatment:

galvanized,painting

Thickness:

2.4-4.0mm

useage:

building

OD:

48*48mm

payment terms:

L/C,T/T,D/A,D/P

Packaging & Delivery

Packaging Detail:standard packaging or according to the customers' requirements for cup lock scaffolding for sale
Delivery Detail:within 15 days for cup lock scaffolding for sale

Specifications

cup lock scaffolding for sale 
1.construction material steel pipes&beams scaffolding 
2.High quality construction st

scaffolding

  cup lock scaffolding for sale  

 

1. Introduction

 

We are manufacturer specialized in scaffolding&formwork materials. Our best-selling products areslab formwork system(Patent No:ZL200420091863.6). It's adjustable system, very time-saving and labor-saving.

 

They replaced timbers,steel pipe&couplers.Wasting of timbers and couplers can be avoided. Moreover, this system can quicken construction period and improve quality of concrete casting.

2. Product Details and Show

a. Main Beam & Sub Beam ( replace H20 wood beam and aluminium I beam)

b. Horizontals & Vertical Props ( need no scaffold clamps)

c. Top jack & Base Jack(adjustable on occasion of an uneven floor )

d. Adjustable Steel Props ( customized sizes available)

3. Product Advantages

 

1)cold-rolled steel, strong,reliable

2)electrophoretic painted

3)need no fittings or couplers

4)easy and quick to operate

5)form smooth concrete surface

6)cycle-used for 300 times

7)keep construction site neat and clean

 


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:New features of quick dismantling scaffolding?
Preservative treatment: Advanced electrophoresis paint treatment, both inside and outside the paintCorrosion effect is longer than the traditional painting and painting steel tube life of 5-8 years
Q:The latest JGJ130-2011 construction fastener type steel pipe scaffolding safety technical specifications
And check the most basic bearing capacity of the scaffold, that is, to calculate the standard value of load
Q:Which accessories are included in a movable scaffold
Chinese now used in the steel pipe scaffold material made of steel tubular scaffolding, bowl button steel scaffolding, buckle disc scaffolding, socket type steel pipe scaffolding, scaffolding, ladder scaffolding, and every kind of the scaffolding, hanging scaffold and the scaffold steel pipe materials.
Q:What are the characteristics of Pankou scaffolding
Pankou scaffolding, unique technology of hot dip galvanizing, hot-dip galvanizing is a strong adhesion, used for a long time, a uniform film coating.
Q:I need to set up scaffolding on a tiled floor to reach some lights 28 ft high?
unless you are majorly manhandling the scaffolding, such as slamming it around and jerking it into place, etc, you won't crack the tiles (this is being said with the hopes that the flooring was installed correctly.) i would throw a layer or two of bedsheets or a good heavy drop cloth over the tiled floor just to protect the tile from being chipped or scratched. be careful going up so high. good luck!
Q:How to do an industrial(Scaffold) piercing without a bend in the ear?
This is why you need a pro. I can see where you should probably put a helix-to-helix industrial in that ear, but if yall can't see it, then I don't think you should be trying this, as neither of you have the experience a professional piercer does.
Q:How soon can you change a scaffolding piercing?
Scaffold piercings, being two cartilage piercings connected by a single bar, take six months for initial healing and twelve months for a fully healed tunnel of flesh to be formed. Don't change it yet, I assure you, you will regret it. Just be patient, keep on cleaning, cleaning, salt-soaking.
Q:The relevant provisions of the demolition of the external wall scaffold:
The relevant provisions of the demolition of the external wall scaffold:First, the removal of scaffolding before the accurate preparation work should meet the following requirements:1, should be a comprehensive inspection of the scaffold fastener connection, even wall pieces, support system, etc. are in line with the requirements of the structure;2, should be based on the results of the inspection to improve the construction organization design of the demolition order and measures, approved by the competent authorities before the implementation;3, should remove the scaffolding on the debris and ground obstacles.
Q:what is the height of a scaffold if the person is 6ft tall?
Whatever they set it at. It could be 1 foot, 4 feet, or 20 feet. How tall a person is, is irrelevant.
Q:Scaffolding scaffolding erection norms which requirements, who can say?
Scaffolding operators must be qualified through the examination of professional personnel, should be held on the card and do a regular physical examination, the operator must wear a helmet, fasten the seat belt, wear non slipIn the process of using frame control load less than ZkN/mZ2kN/ square meters, the prohibition of arbitrary demolition wall connecting rod and other safety facilitiesEach component and frame tube of the cantilever frame must be transmitted to the ground in timeWhen the shelf is removed, a fence or warning sign should be set up around it, and someone should be assigned to guard itFasteners and steel pipe diameter matching use, and the factory certificate. It is found that there is crack, deformation, the prohibition of the use of silkThe erection of temporary power lines and the grounding of the suspension frame and the lightning protection measures shall be carried out according to the national standards

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range