Scaffolding Coupler Steel Galvanized Forged Coupler with Welded Tube

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1000 pc
Supply Capability:
2000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

1. Scaffolding Coupler  Steel Galvanized Forged   Coupler with Welded Tube  Description 

What is   Scaffolding Coupler ?

Scaffolding Coupler is accessories of the scaffolding productions , it is usually made of Q235 steel material , The production technology can be forging or prssed  , With the development of the construction , Scaffolding Coupler  Steel Galvanized Forged   Coupler with Welded Tube    has beome more and more popular. 


Function of the Scaffold   Coupler 

Scaffolding Coupler  Steel Galvanized  Forged    Coupler  used to connect two scaffolding tubes at certain direction . The scaffolding coupler used to connect tubes and bulid hige woking towers .It can be used to 48.3mm tube or 48.3mm and 60mm tube  Every size avaliable . 


Advantage of  Scaffold   Coupler

Strong ability of resistance to deformation, for different manufacturing process, It can resistant deformation, ensure the product safety and effective use of repeated; Strong anti-sliding performance, joint area is large, fasteners and overcomes the cast iron steel tube a point or line defect of joint, remove of steel pipe slip hazard.


2.Main features of Scaffolding Coupler  Steel Galvanized Forged   Coupler with Welded Tube   

 Reliable performance

 Corrosion resistance

 Durable finish standards   

 Strong anti-sliding performance

 Manugacture 

 Good service 


3.Scaffolding Coupler  Steel Galvanized Forged   Coupler with Welded Tube   images 

Scaffolding Coupler  Steel Galvanized Forged   Coupler with Welded Tube

Scaffolding Coupler  Steel Galvanized Forged   Coupler with Welded Tube



4. Scaffolding Coupler  Steel Galvanized Forged   Coupler with Welded Tube   Specification 

 Raw Material: Q235

 Size: 48.3mm

 Weight:1.43kg

 Certifies:, EN 74 and OSHA

 Technology : Forging 

 Surface treatment: Electro galvanized, Hot DIP galvanized, or painted

 Brand Name:FF

 Useage: connecting the scaffolding pipe

 OEM service offered



5.FAQ of Scaffolding Coupler  Steel Galvanized Forged   Coupler with Welded Tube 

Why you  choose  us ?

1)Highest quality -never use any equipment that is damaged or deteriorated in any way

2)Safety -inspect all equipment before using

3)Competitive price - factory suppler direct

4)We have strong engineering team that can give best solution for your project

5)Cutting -Edge product development

 Consult your scaffolding supplier when in doubt-scaffolding is his business .Never take chances

 Our firm belief that our customer's success are the only guarantee of our success .

 


Package ?

All the products package are suit for the sea transportation, steel and wooden plate is usual,  if you need special   package, Pls contact me for detail, we will meet your demands.


Delivery Time ?

For one 20GP container, the delivery time is about 15-25 days,

For 1-5 20GP containers, the delivery time is about 15-50 days.

For more than 5 containers, pls contact me ,our engineer will give you a delivery plan.

 

Product Quality

1)  we can send you the samples for your checking our quality.

2)  If you have time ,we welcome your coming to visit our factory.

 




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:In the Scarlet Letter, how does the scaffold scene free Dimmesdale, Hester and Pearl?
Tell me what you know and I will elaborate. I had to read this book for a class and hated it, but I won't do your homework for you. I will help if you show you read it yourself and put in some effort we can see
Q:Can anyone give me a detailed design of a simple scaffolding?
can't draw here, but it's just an x with a flat board on top in 3 dimensions.
Q:What is the mobile scaffolding materials
About looking for specific mobile scaffolding, I suggest you here to see the mobile scaffolding, mobile scaffolding here all, other parts of the mobile scaffolding, mobile scaffolding may not fully determine where is here, you can find the mobile scaffolding, mobile scaffolding because it is easy to find, but now is not the mobile scaffolding too hard to find. About looking for specific mobile scaffolding, I suggest you here to see the mobile scaffolding, mobile scaffolding here all, other parts of the mobile scaffolding, mobile scaffolding may not fully here,
Q:What is the difference between Scaffolding and Zone of Proximal Development?
Taken from okorder: Vygotsky believed that when a student is at the zone of proximal development for a particular task, providing the appropriate assistance (scaffolding) will give the student enough of a boost to achieve the task. Once the student, with the benefit of scaffolding, masters the task, the scaffolding can then be removed and the student will then be able to complete the task again on his own.
Q:What is the rental price of the mobile scaffolding and accessories now? How to rent a law?
As for the specific rent is not easy to say, because each scaffolding rental companies may have some differences
Q:Scaffold climbing law?
OSHA says that you need guardrails, safety nets or a fall-arrest system if you're working or walking near an unprotected surface more than 6' above a lower level.
Q:]How does Pearl react when Dimmesdale calls Hester and herself to mount the scaffold with him?
The answer can be found in the novel The Scarlet Letter by Nathaniel Hawthorne. Read that and you'll have the answer!
Q:Topic?Scaffolding construction program how to doSpecial construction scheme
More recently asked scaffolding people, I made a standard answer to see if you have any useful (already adopted)
Q:how long will a scaffold piercing take to heal?
They take around 6-9 months to heal completely...you shouldn't be taking it out at all. I stupidly took mine out after 3 months to clean a bit behind the bar and the bar would never go back through the top hole. It hurt like crap and bled profusely if I tried to push it through.
Q:Erection of steel scaffolding tools and safety supplies
Safety belt, safety helmet, gloves, rope, steel shear, ribbon sling (sling)

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range