• Scaffolding Coupler British Type Steel Galvanized Forged Double  Coupler 48.3 System 1
  • Scaffolding Coupler British Type Steel Galvanized Forged Double  Coupler 48.3 System 2
  • Scaffolding Coupler British Type Steel Galvanized Forged Double  Coupler 48.3 System 3
  • Scaffolding Coupler British Type Steel Galvanized Forged Double  Coupler 48.3 System 4
  • Scaffolding Coupler British Type Steel Galvanized Forged Double  Coupler 48.3 System 5
  • Scaffolding Coupler British Type Steel Galvanized Forged Double  Coupler 48.3 System 6
Scaffolding Coupler British Type Steel Galvanized Forged Double  Coupler 48.3

Scaffolding Coupler British Type Steel Galvanized Forged Double Coupler 48.3

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1000 pc
Supply Capability:
2000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Description:

1. Structure of  Scaffolding Coupler British Type Steel Galvanized Forged Double Coupler  Description 

What is Double  Scaffolding Coupler ?

Scaffolding Coupler is accessories of the scaffolding productions , it is usually made of Q235 steel material , The production technology can be forging or prssed  , With the development of the construction , Scaffolding Coupler British Type Steel Galvanized Forged Double Coupler has beome more and more popular. 


Function of the German Type Double  Coupler 

Scaffolding CouplerBritish Type Steel Galvanized Forged Double  Coupler used to connect two scaffolding tubes at certain direction . The scaffolding coupler used to connect tubes and bulid hige woking towers .It can be used to 48.3mm tube or 48.3mm and 60mm tube  Every size avaliable . 


Advantage of  British Type Double  Coupler

Strong ability of resistance to deformation, for different manufacturing process, It can resistant deformation, ensure the product safety and effective use of repeated; Strong anti-sliding performance, joint area is large, fasteners and overcomes the cast iron steel tube a point or line defect of joint, remove of steel pipe slip hazard.


2.Main features of Scaffolding Coupler British Type Steel Galvanized Forged Double  Coupler 

 Reliable performance

 Corrosion resistance

 Durable finish standards   

 Strong anti-sliding performance

 Manugacture 

 Good service 


3.Scaffolding Coupler British  Type Steel Galvanized Forged Double Coupler images 


Scaffolding Coupler British Type Steel Galvanized Forged Double  Coupler 48.3

Scaffolding Coupler British Type Steel Galvanized Forged Double  Coupler 48.3

Scaffolding Coupler British Type Steel Galvanized Forged Double  Coupler 48.3


4. Scaffolding Coupler British Type Steel Galvanized Forged Double Coupler Specification 

 Raw Material: Q235

 Size: 48.3mm

 Weight:1.25kg

 Certifies:, EN 74 and OSHA

 Technology : Forging 

 Surface treatment: Electro galvanized, Hot DIP galvanized, or painted

 Brand Name:FF

 Useage: connecting the scaffolding pipe

 OEM service offered



5.FAQ of Scaffolding Coupler British Type Steel Galvanized Forged Double Coupler 

Why you  choose  us ?

1)Highest quality -never use any equipment that is damaged or deteriorated in any way

2)Safety -inspect all equipment before using

3)Competitive price - factory suppler direct

4)We have strong engineering team that can give best solution for your project

5)Cutting -Edge product development

 Consult your scaffolding supplier when in doubt-scaffolding is his business .Never take chances

 Our firm belief that our customer's success are the only guarantee of our success .

 


Package ?

All the products package are suit for the sea transportation, steel and wooden plate is usual,  if you need special   package, Pls contact me for detail, we will meet your demands.


Delivery Time ?

For one 20GP container, the delivery time is about 15-25 days,

For 1-5 20GP containers, the delivery time is about 15-50 days.

For more than 5 containers, pls contact me ,our engineer will give you a delivery plan.

 

Product Quality

1)  we can send you the samples for your checking our quality.

2)  If you have time ,we welcome your coming to visit our factory.

 




Q:Scaffolding scaffolding erection norms which requirements, who can say?
The construction load on the frame must be in accordance with the design requirementsAfter the first erection of the body, must be approved by the company's safety and technical departments, and the company's project safety officer after the visa can continueIn case of suspension frame, use more than one month, such as re started, the frame must pass the reinforcement, rod must be re tighten oil, can be usedBefore the building should be approved with the consent of the special construction plan, should be in accordance with the scheme requirements of embedded embedded parts of the main structure of the construction processFeet should be laid flat tile, and tied with wire fixed on the lower supporting steel pipe. Scaffold of the butt joint between the tile, the rest of the bearing rail spacing shall not be greater than 400~700 mm
Q:What are the requirements for the construction of the scaffold eye in the building?
Optimistic, the most comprehensive!5.2.5 scaffold EngineeringA. accessories(1) selection and calculation basis of structural parts
Q:i have now got lumps on my scaffolding and i have searched and it seems to be normal.. i just want to know how to get rid? any ideas? :)
A scaffold piercing should not be done with a single long bar. Go back to your piercer, or to another one and ask them to change it to two short bars, this will take the pressure off the tissue. Then you should buy some cotton cosmetic pads. Fill up a mug with boiling water from the kettle, soak a cotton pad in the water, squeeze out most of the water but not all of it, have it as hot as you can stand and hold it onto the lump. The lump is likely filled with lymph and this will encourage it to drain. Do this for about two weeks. If the lump still hasn't gone away either go back to the piercer or go see a doctor. To the person that said it shouldn't be done with the two shorter bars. Yes, I know many people who have had it done with one bar and have been fine, but I know plenty of people with horror stories. My ear could not cope with the one bar and wasn't draining properly even with regular sea salt soaks. One of my piercings has migrated slightly but I'm confident that my piercer will be able to put my long bar back in for me.
Q:Scaffold removal should comply with those requirements......
Demolition safety requirementsThe removal order should be 1 layers from the top down, at the same time no homework.2 remove the frame rods and connectors, springboard and other materials, should be used in rolling, prohibited throw down. The foot lever and remove the plate have been demolished, should be disposable.3 all the pieces of the wall should be removed from the scaffold layer by layer, it is strictly forbidden to take the whole or a few layers of the demolition of the wall and then dismantle the scaffolding; the demolition of the height difference should not be greater than two steps, such as the height difference is greater than the two step should be added to strengthen the wall.4 when the scaffolding removed to the lower part of the last long steel pipe height, according to the needs of the site in the appropriate position to take temporary support reinforcement, after the demolition of the wall.
Q:I sincerely ask you to help me, door scaffolding, build 30 meters high, without any reinforcement points of the construction program. Thanks, high marks!
1 in order to design and construct the steel pipe scaffold in the door, to carry out the relevant regulations of the state on safe production, and to realize the advanced technology, reasonable economy and safe application.
Q:Why is it necessary to keep records of all inspection carried out on scaffolds as stated in Regulation 39?
some times ppl die because of neglect and lack of mentainance so some have take responsobility for this
Q:hi, i already have my cartlidge pierced on my right ear and thinking about getting a scaffold piercing on my left ear. will a scaffold piercing hurt more than my cartlidge piercing,,less,,or about the same???thanks answers apprecietedhope =] xx
Several people have told me it hurts about the same. I do not have one, sorry couldn't be more help than that.
Q:What's an antonym for the word scaffold?
Since a scaffold is a bridge/ladder/support used to allow you to span the gap between you and and object you wish to reach, I'd go with barrier.
Q:Exterior wall scaffold construction plan?
Foundation treatment:Pit backfill every 30cm thick layer by ramming into vibration compaction, compaction by cutting ring sampling test, the bearing capacity of Rammed Soil reached 60270KN/m2. And then in the compacted soil C15 cast in situ concrete hardening, thickness 100mm. The foundation of all scaffolds must be smooth. On the basis of the base plate, the thickness of not less than 50mm, the layout must be smooth, shall not be suspended; and in the periphery of the scaffolding outside the vertical rod 50cm set up a shallow ditch drainage.
Q:I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
10, the scaffolding removed, should first check to connect with the building, and will remain on the scaffold material, clean, and other debris from the top down, according to the first after the demolition, demolition of first order after installation, demolition materials should be passed down or lifted onto the ground, step one clear. Not allowed to use the method of step down, it is strictly prohibited to throw down or push (pull) down the demolition method.11, take off scaffolding, should be set up warning area, and sent a special alert. In case of more than six winds and bad weather, the scaffolding should be stopped.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords