Scaffolding Accessories Pressed Board Relaining Coupler

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Place of Origin:
Jiangsu China (Mainland)


Model Number:
SEJ-1011
Type:
Scaffolding Parts
Scaffolding Part Type:
Scaffolding Couplers
Material:
Q235
Surface Treatment:
Natural, Zinc plated
Size:
48.3mm X 48.3mm
Weight:
0.6kg
Standard:
BS1139/EN74

Packaging & Delivery

Packaging Detail:bags then on steel pallets or as request
Delivery Detail:20-45 days or as contract

Specifications

Pressed Board Retaining Coupler
1. BS1139/EN74 -1.
2. Clear marking.
3. Perfect surface.
4. Timely delivery.

1. Description of Pressed Board Retaining Coupler

Material

Q235/Q345/etc

Dimensions

48.3*48.3 or as your demands

Surface

Hot-dip galvanization/ electro galvanization /painted /or as your request

Standard

EN74,BS1139,

Fastener Grade

class8.8

Weight  

0.58-0.6kg/ as your requirement  

Feature

1.Good bearing capacity  2.Durable & stable
3.Easy to assemble & dismantle

MOQ

2000pieces

Package

bags with steel pallets, or as your request

Payment Terms

TT, L/C, or as our agreement.

Delivery Time

According to order quantity.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Is it possible to use Boston Ivy as scaffolding for wisteria so one climbs up the other?
No, ivy isn't that strong. One can easily unzip it from the walls. Wisteria is way too heavy for ivy. Plus you have the root competition down below. Ivy creates an incredible dense mat of roots , little grows with it. Wisteria would have quite a battle on its hands for root space and nutrients.
Q:Im planning on getting an industrial (scaffolding) ear piercing...?
via stretcher you advise gauge, ultimate? i've got in no way heard it suggested as a stretcher before, yet that would desire to easily be only an area slang differing style venture. besides, i think of gauges are suited or perhaps lovable in the event that they are smaller. bigger ones are too off-putting and that i might in no way do it myself. i like the belief of an commercial piercing nevertheless. i admire those. i myself % to get one sometime quickly. i've got needed one for a mutually as. i does no longer probably individually get a gauge, yet whilst that's what you sense works via all skill get one. i think of the commercial piercing is adequate on that is very own. i do no longer think of it should be accompanied via a gauge. besides, it sounds to be such as you needed the commercial piercing first, so which you may desire to start with that.
Q:Bracket cast in situ beam bracket must use bowl buckle scaffold
No mandatory provisions.JGJ1622008 construction formwork safety technical specifications, is the latest specification
Q:Is it possible to have the scaffold piercing done separately?
Technically yes but it is better to have them done at the same time so the holes are aligned properly. It is better to get them done at the same time, as the second piercing will be less painful because you are all adrenalin-ed up! Probably cheaper too.
Q:Is it easier to build a disc scaffolding system than a bowl buckle scaffold?
It is widely used in bridge engineering, tunnel engineering, workshop, elevated water tower, power plant, oil refinery... Support design and special plant, is also applicable to overpass span scaffolding, storage shelves, chimney, water tower and indoor and outdoor decoration, large concert stage, the background frame, stands, balcony frame, stairs, other party system, stage setting, sports watch station project.
Q:Introduction of external scaffolding
2 the size and surface quality of steel pipe shall meet the following requirements:1) the new steel pipe should have quality certificate, quality inspection report; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth of steel pipe; allowable deviation table item allowable deviation inspection tool 1 welded steel pipe size (mm) diameter 48 wall 3.5 -0.5 thick 2 vernier caliper at two ends of the steel tube shear diagonal deviation 1.7 corner ruler feeler, the outer surface of the steel pipe 3 corrosion depth is less than or equal to 0.50 bar 4 vernier caliper end bend L = 1.5m = 5, 5 pole bending steel ruler 3m
Q:Construction scheme of portal scaffold
This specification is applicable to the design, construction and use of the floor (bottom) door type steel pipe scaffold used in industrial and civil construction. The door type steel pipe scaffold for other purposes (such as chimneys, water towers, etc.) can be carried out in accordance with the principles of this specification.
Q:Specification for construction steel pipe scaffolding and construction safety rules?
Scaffolding specification 1Safety code for scaffold construction:Section 1 fastener type steel pipe scaffoldSpecification for scaffolding, scaffold construction scheme, door type scaffolding specification, door type scaffolding construction scheme, mobile scaffolding specification,This technology is applicable to a set of steel pipe fastening structure as the main body, to make bamboo scaffolding outside the fence.
Q:How badly does getting an industrial/scaffolding piercing hurt?
well when i got mine it really didn't hurt tht muchh the second hole hurt the most but only because i was thinking about it. andd it hurts more afterwards especially during the first few dayss if you hit it by accidentt. and cleaning it honestly is a pain, its annoyinggg but you have to do it, during the first few weeks clean it 3 times daily then you can start going down to two times daily. and do sea salt soaks and stufff anddd the actual piercing for me was about a 4 or a 5 (10 being painfulest) and the healing has been about a 5 or a 6 but i just got it done last weeek, if you really want it then get it,the pain is only temporaryy buttt its deff worth it in the end :)
Q:Specification and type of scaffold erection
technical requirementThe materials used for steel pipe scaffold shall meet the following requirements:1 steel pipe diameter should be 48 ~ 51mm, wall thickness of ~ 3.5mm, length of 2.1 ~ 2.8m and 4 ~ 6.5m is appropriate, there are serious corrosion, bending, cracks, damage shall not be used.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range