Scaffolding Accessories forged Metal coupler

Ref Price:
Loading Port:
Nanjing
Payment Terms:
TT OR LC
Min Order Qty:
1000 pc
Supply Capability:
50000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

SPECIFICATIONS:

1 MATERIAL:Q235

2 SWIVEL AND DOULE RIGHT ANGLE COUPLER

3 DROP FORGED AND PRESSED

4 BS1139 AND EN74 STANDARD

5 SIZE:48.3*48.3MM

6 PRESSED AND DROP FORED SWIVEL AND FIXED COUPLER/PUTLOG COUPLER/SLEEVE COUPLER/INNER CONNECTOR/BEAM COUPLER ETC.

Pressed swivel coupler 1.02kg  galvanized/ hot dipped galvanized

Pressed fixed coupler  0.85kg  galvanized / hot dipped galvanized

DROP FORGED SWIVEL COUPLER   0.98kg       galvanized / hot dipped galvanized

DROP FORGED SWIVEL COUPLER   1.12kg  

DROP FORGED PUT LOG COUPLER  0.62KG    galvanized / hot dipped galvanized

DROP FORGED SLEEVE COUPLER     1.1KG    galvanized / hot dipped galvanized

DROP FORGED  FIXED BEAM COUPLER     1.45KG    galvanized / hot dipped galvanized

DROP FORGED SWIVEL GRINDER COUPLER     1.5KG    galvanized / hot dipped galvanized

7  SUITABLE FOR PIPE DIAMETER:48MM,48.3MM,60.3MM

8 Payment terms:30%TT deposit, balance against BL copy or LC at sight

9 FOB .CIF.C&F ,CFR acceptable

10 Delivery time;20-30days after receiving deposit


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to calculate the double wall scaffolding
Answer supplementSet size: the vertical distance of the vertical rod is 1.20 meters, the vertical rod is a distance of 1.05 meters, the vertical rod of the distance of 1.80 meters;The calculation of the scaffolding for double scaffolding erection height of 10 meters, the vertical pole with a single riser;The length of the inner frame is 0.30 meters;Large cross bar on the small cross bar on the large number of cross rods 2;
Q:What are the dangers of scaffolding
(5) the improper operation of the accident collision accident, etc.)Analysis of the main reasons two accidents:1) whole frame dumping, vertical collapse or local collapse frameStructural defects: the structure of the lack of the necessary structural members, not in accordance with the provisions of the number and requirements of the erection of the wall, etc.;In the process of using the arbitrary demolition essential bars and even wall pieces etc.;
Q:What are the components of a mobile scaffolding
The main parts of the door type scaffolding are the basic structure of the door frame, the cross support, the connecting rod, the hanging button type foot board or the horizontal frame, the lock arm, etc.
Q:What is the bowl buckle scaffolding, bowl buckle scaffold what are the characteristics
(c) the cross bar is made of welded joints of 48 mm x 3.5mm steel pipe with a certain length. Horizontal connecting rod for vertical rod, or horizontal bearing rod of frame;
Q:A window washer weighing 700 N is standing on a scaffold supported by a vertical rope at each end. The scaffol?
The tension in the two vertical ropes must sum to 700N in order to balance the window washer. EDIT. In order to find the answer for each rope, I need to know how long the scaffold is and where the window washer is standing. EDIT. Taking moments about the end nearest to window washer. T1*3.044 = 298.6*1.522 + 700*1.51 ----> T1 = 496.54 N (2. d. p.) Taking moments about the other end. T2*3.044 = 298.6*1.522 + 700*1.534 ----> T2 = 502.06 N (2. d. p.) T1 + T2 = 496.54 + 502.06 = 998.6 = 700 + 298.6 as required.
Q:What is a bowl buckle scaffold?
Compared with other types of scaffolding, bowl buckle type multifunctional scaffolding is a new scaffold with broad development prospects.
Q:Mobile scaffolding accessories prices
The cross rod is also called the diagonal pull rod, and is a cross connecting rod which is vertically connected with the two door frames. The part of both ends of the rod part is punched with a pin hole, and the locking pin on the vertical rod of the door and the frame is locked when assembling.
Q:In the construction of steel pipe scaffolding steel pipe and steel stamping fastener usage ratio is how much?
There are a lot of people do not know the construction of steel pipe scaffolding and steel plate and the proportion of the amount of stamping fastener is much, then let the people tell you the problem
Q:As Hester once did, what time of day did Dimmesdale attend the Scaffold, and what compels his action?
Haven't read this book in years but I believe he goes back to the scaffold at night because he is being eaten away by guilt. It is a type of redemptive action, just as Hester had to stand there and be judged for her sins he feels the need to also stand there on the scaffold with Hester (theoretically) and be judged/punished as well, the only difference, of course, is that he does it under the cloak of night, when no one can see him.
Q:does anyone know where i can find dimmesdale's confession (at night) of his sins upon the scaffold.?
Dimmesdale does not confess to his crimes on the scaffold at night, but he does meet with Hester and little Pearl on the scaffold while Chillingsworth watches. (pg. 220) His public confession comes at the end of the book during the day time and then he dies.(pg. 367) Follow the link I have attached and type in the page numbers in the little box near the top of the page.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range