Scaffolding Accesories Drop Forged Coupler

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Place of Origin:
Shandong China (Mainland)


Model Number:
SD-3001A
Type:
Scaffolding Parts
Scaffolding Part Type:
Scaffolding Couplers
item:
drop forged coupler
material:
Q235
size:
48.3*48.3mm
weight:
1.00kg
surface:
zinc plated
colour:
white or yellow

Packaging & Delivery

Packaging Detail:Drop Forged Coupler is packed with woven bags+steel pallet
Delivery Detail:drop forged coupler 20-30 days according to your quantity

Specifications

Scaffold Drop Forged Coupler
material:Q235
size:48.3*48.3mm
weight:1.00kg
Surface: Electroplate

Scaffold Drop Forged Coupler

Production Detail:

  1. Name: Drop Forged Coupler

  2. material:Q235

  3. size:48.3*48.3mm

  4. weight:1.00kg

  5. standard:EN74B or BS1139

  6. surface treatment:Electroplate

  7. High quality and competitive price

Specification of Drop Forged Coupler

Image

Item No

Name

Dia

Weight

Surface treatment

 Scaffold Drop Forged Coupler

SD-3001

British type double coupler

48.3*48.3mm

1.00kg

painting,

galvanized

Scaffold Drop Forged Coupler

SD-3002

British type swivel coupler

1.10kg

Scaffold Drop Forged Coupler

SD-3003

Pressed double coupler

0.88kg

Scaffold Drop Forged Coupler

SD-3004

Pressed swivel coupler


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the general specifications of bowl buckle scaffold?
In fact, the conventional bowl buckle scaffold is made of 48 Q235 carbon steel pipe processing, pole specifications are 0.6m, 0.9m, 1.2m, 1.5m, 1.8m, 2.4m, 3.0m; crossbar specifications are 0.6m, 1.2m, 1.5m. The price of any product is determined by its consumption of materials and processing costs
Q:in the scarlet letter, what events happen at the scaffold during the night??
The Democrats took decrease back a majority particularly through attacking Republicans on the unpopularity of the conflict and Bush's adverse approval rankings. there have been additionally various ethics scandals concerning republicans that twelve months that led to various of them resigning their seats and a regular loss of self belief that strengthened Democrat momentum. Tom postpone resigned after being charged with marketing campaign finance violations. He substitute into never convicted. Mark Foley sexually under pressure an underage male congressional website. The Abramoff indictment solid suspicion on all and sundry in Washington, extraordinarily those in ability. Scooter Libby substitute into Indicted. It substitute into basically a nasty twelve months to be a republican. a brilliant number of the scandals disappeared after the elections and became out to be not something. some indictments caught, and extremely, in basic terms as many democrats have been grimy as republicans. yet comparable to a corrupt regime helped positioned the democrats on top of issues. Then all their can provide to question Bush and end the conflict dwindled into not something as they took over the political equipment and grew to alter into as corrupt as a results of fact those they replaced.
Q:What are the safety requirements for the dismantling of construction scaffolding
(3) prior to the dismantling of scaffolding, the scaffolding should be retained on the material, debris and other clean, and should be removed by the removal of mechanical equipment, electrical and other pipelines, such as demolition, or to be protected.(4) the dismantling of the scaffolding should be unified command, should be approved by the construction plan, the requirements of the work instructions, from top to bottom in the order of the upper and lower levels are strictly prohibited demolition operations.
Q:What is the importance of the second scaffold scene in the Scarlet Letter?
concentration your activity on who's on the scaffold, how they react to the customary public shaming, and what the reader learns with connection with the character from analyzing the define of them on the scaffold.
Q:What is the mobile scaffolding materials
About looking for specific mobile scaffolding, I suggest you here to see the mobile scaffolding, mobile scaffolding here all, other parts of the mobile scaffolding, mobile scaffolding may not fully determine where is here, you can find the mobile scaffolding, mobile scaffolding because it is easy to find, but now is not the mobile scaffolding too hard to find. About looking for specific mobile scaffolding, I suggest you here to see the mobile scaffolding, mobile scaffolding here all, other parts of the mobile scaffolding, mobile scaffolding may not fully here,
Q:Electric basket accessories are generic
Electric basket among many different parts, such parts have effect to better play its electric basket. Safety rope and the Rieter electric basket frame connection, because the rope with a diameter of not less than 13mm diameter steel wire rope length is arranged. One way is to use the rope around a basket frame bottom and the safety rope prison card (at least 4 buttons) each card once left not greater than 1m lifting weight, basket case from off bearing wire rope or wire rod chain, safety rope hanging basket frame plays the role. This method is very troublesome, each 1m will lift an insurance card rope, and in case of loss Ping An, rope there will be no more than 1m about free falling impact. Therefore newly developed into a safety self-locking device (LSL63 type hanging scaffold with a safety lock, at the same time, set in peace on the wire rope, the normal lift safety lock with electric basket frame along. The risk of wire rope lifting, in case the basket falls off, the safety lock can automatically lock the cradle body on the safe wire rope
Q:How do you calculate the tonnage of scaffolds to use in a project?
tonnage is related to the volume of a certain material to be used in a certain project... so as to volume, tonnage is just the volume of the material to be used, given the specifiations in this case, scaffolds. consult your design and count the distribution of the scaffolds to be used.. average ratio of scaffolding tonnage is a ton per 10 square meter... also depends on the quantity of the project.
Q:Is it dangerous to get a scaffold piercing?
It shouldn't be dangerous if you go to a good piercer (mine pierced mine funny) and clean it regularly. and it should be fine, Just learn which type of earring you;re allergic to and make sure they dont pierce it with that kind of metal.
Q:Scaffolding scaffolding erection norms which requirements, who can say?
The construction load on the frame must be in accordance with the design requirementsAfter the first erection of the body, must be approved by the company's safety and technical departments, and the company's project safety officer after the visa can continueIn case of suspension frame, use more than one month, such as re started, the frame must pass the reinforcement, rod must be re tighten oil, can be usedBefore the building should be approved with the consent of the special construction plan, should be in accordance with the scheme requirements of embedded embedded parts of the main structure of the construction processFeet should be laid flat tile, and tied with wire fixed on the lower supporting steel pipe. Scaffold of the butt joint between the tile, the rest of the bearing rail spacing shall not be greater than 400~700 mm
Q:What are the common rules for calculating the amount of scaffolding works
The calculation of masonry construction height within 1.35 ~ 3.6m according to the calculation in the scaffold; scaffold height above 3.6m, the independent brick columns are less than 3.6m in height according to the circumference of the core column is built by scaffolding in height according to the calculation; at an altitude of 3.6m and above at the circumference of the core column is built by 3.6m and calculated by single row height scaffolding.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range