Scaffold Steel Plank Scaffold for Outdoor Building

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
2000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Scaffold Steel Plank Scaffold for Outdoor Building

Product Details

Basic Info.

Model NO.:SD03

 

Material:Steel

Type:Fixed

 

Structural Style:Doors Scaffolding

Framework:Frame Combined Scaffolding

 

Supporting Mode:Floor Type Scaffolding

Lapping Form:Frame Scaffolding

 

Erection Position:Internal Scaffolding

Move Method:Horizontal mobile Scaffolding

 

Scaffolding Part Type:Scaffolding Frames

Working Size:95cmx185cmx170cm

 

Steel Pipe Size:Dia43mm X Thickness 2.3mm

Anti-Rust Treatment:Galvanize Zinc

 

Universal Wheel:Optional

Package:Bare Product

 

Net Weight:92kg

20/40/40hq Container:230/460/570sets

 

Export Markets:Global

Additional Info.

Trademark:Rider

 

Packing:Carton

Standard:CE

 

Origin:Zhejiang, China

HS Code:9401809090

 

Production Capacity:5, 000PCS/Month

Product Description

Working size: 95cmx185cmx170cm
Steel pipe size: Dia43mm x Thickness 2.3mm
Anti-rust treatment: Galvanize zinc
Universal wheel: Optional

Shipping information:
Package: Bare product
Net weight: 92kg
Qty for 20/40/40HQ container: 230/460/570sets

Attention:
Bare product without carton
Universal wheel isn't included
.
More products:

ModelSpecificationPacking info.Note
SD01Working size:95cmx185cmx170cm
Steel pipe size: Dia43mm x Thickness 2.3mm
Anti-rust treatment: galvanize zinc
universal wheel: optional
Package: Bare product
Net weight:92kg
Qty for 20/40/40HQ container: 230/460/570sets
Bare product without carton
Universal wheel isn't included
SD02Working size:95cmx185cmx170cm
Steel pipe size: Dia43mm x Thickness 2.3mm
Anti-rust treatment: galvanize zinc
universal wheel: optional
Package: Bare product
Net weight:92kg
Qty for 20/40/40HQ container: 230/460/570sets
Bare product without carton
Universal wheel isn't included
SD03Working size:95cmx185cmx170cm
Steel pipe size: Dia43mm x Thickness 2.3mm
Anti-rust treatment: galvanize zinc
universal wheel: optional
Package: Bare product
Net weight:92kg
Qty for 20/40/40HQ container: 200/440/480sets
Bare product without carton
Universal wheel isn't included

Scaffold Steel Plank Scaffold for Outdoor Building

Scaffold Steel Plank Scaffold for Outdoor Building


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:I would like to know what the scope of responsibility for the construction engineering supervision is specific
Especially when the project quality accident and other accidents need to be investigated, the supervising enterprise or the supervisor is often in a passive state of fear or fear , With the resignation of life to describe the situation at this time and then appropriate
Q:Will the scaffolding steel pipe specifications are generally how much ah? What are the specifications?
scaffolding load shall not exceed 270kg / m
Q:I have a concrete transport arm pump, would like to ask which building materials companies need to use, can be resident
Because you scaffolding too high pump enough, so you can only use the tow pump or car pump when the tow pump, the pump tube connected to the pouring site, with the pipe, pipe to complete the concrete pouring task
Q:How to calculate the amount of steel pipe Pay attention to meters as a unit, or tons of units! Thank you
Steel pipe commonly used specifications for 1m-6m first determine your height and length, width
Q:2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~!
(Construction project) single multiple choice questions (a total of 20 questions, each question 1 points
Q:(Spoilers) In the Scarlet Letter if DImmesdale did not die on the scaffold would Chillingworth have killed him? He speaks of revenge.?
Chllingworth's revenge did not involve killing Dimmesdale. He preyed on Dimmesdale's guilty conscience and drove him to do what he did, out of guilt. What Chillingtonworth did was actually much crueler than just killing Dimmesdale outright.
Q:What is the vertical transport of construction and the high increase in fees
The vertical transportation fee is a special item in the construction industry
Q:How to do a good job of typhoon during the mass transfer mobilization work
strong winds may blow down buildings, high-altitude facilities, easily lead to casualties
Q:What are the measures in the rainy season? What precautions must be done?
pay close attention to weather forecast, do a good job in Taiwan flood prevention work, if necessary, should be reinforced in the construction of the project do a good job of building materials, rain and moisture work the construction site of the road, the facilities must be smooth drainage, as far as possible rain to stop the water, to prevent the ground water into the basement foundation, the basic project should do a good job slope anti-skid and anti-collapse in the rainy season before doing live housing, equipment, drainage and rain measures Ready to use the water pump and related equipment, prepare the right amount of plastic cloth, linoleum and other rain material encountered heavy rain should immediately stop the pouring of concrete, and has been pouring silicon parts of the plastic film covered all mechanical and electrical equipment to build the protective shed to be strong, and take rain, flood prevention measures, installation of grounding safety devices, electrical box leakage protection device must be sensitive and reliable, and often check the construction site of the tower crane, construction elevator, outside the scaffolding need to install lightning protection device, grounding resistance is not greater than 4Ω the rainy season construction to do a good job of anti-skid reinforcement work all mechanical equipment after the rain should first check whether the circuit is intact Dry and so on
Q:2 painters are standing on a 5.0 mg long scaffold. Each painter weighs 833 N.?
Summing torques at the left cable T2*5-833*2-285*2.5-833*4.5=0 T2=1225 N Summing torques at the right cable T1*5-833*3-285*2.5-833*.5=0 T1=726 N Check 833*2+285-(1225+726)=0 It checks j

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range