Sc/Sc Electic Construction Hoist Elevator Motor Good Performance

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
1000 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Structure of Building Hoist


Model NO.:(SC200/200)

Type:Lifting Platform

Application:Construction Usage

Tower Crane Type:Slewing Tower Crane

Sling Type:Wire Rope

Main Girder Form:Double Girder

Power Source:Hydraulic

Moving Type:Fixed

Installation:Jack-Up

Certification:ISO9001: 2000, CE

Condition:New

Max.Lifing Load:2*2000kg

Max.Lifting Height:400m

Main Power Source:3~380V

Cage Size:3mx1.5mx2.6m

Cage:Double

Mast of Section:0.65X;0.65X1.508m

Color:According to Customer Need

Warranty:1 Year

Total Power:43.5

Max. Free End Height of Guides:7.5m

Export Markets:North America, South America, Eastern Europe, Southeast Asia, Africa, Mid East, Eastern Asia, Western Europe


Building hoist Specifiction

Elvator classification ModelRated load capacity(kg)Lifing speed
(m/min)
Motor power
(kw)
Rated fixing load capacity
(kg)
Balanced weight capacityDimension inside cage(length*width*height)
Normal frequency construction elevatorsingle cageBalanced weightSCD2002000332× 11100010003.0× 1.3× 2.4
Unbalanced weightSC2002000333× 11200003.0× 1.3× 2.4
SC1001000332× 11100002.5× 1.3× 2.4
double cageBalanced weightSCD200/2002× 200033(2× 2)× 112× 1000210003.0× 1.3× 2.4
Unbalanced weightSC100/1002× 100033(2× 2)× 112× 100002.5× 1.3× 2.4
SC200/2002× 200033(2× 3)× 112× 200003.0× 1.3× 2.4
Frequency construction elevatorsingle cageBalanced weightSCD20020000-633× 15100010003.0× 1.3× 2.4
Unbalanced weightSC20020000-633× 15200003.0× 1.3× 2.4
SC10010000-633× 11100002.5× 1.3× 2.4
double cageBalanced weightSCD200/2002× 20000-63(2× 3)× 152× 10002× 10003.0× 1.3× 2.4
Unbalanced weightSC100/1002× 10000-63(2× 3)× 112× 100002.5× 1.3× 2.4
SC200/2002× 20000-63(2× 3)× 152× 200003.0× 1.3× 2.4

Building Hoist Images


Sc/Sc Electic Construction Hoist Elevator Motor Good Performance

Sc/Sc Electic Construction Hoist Elevator Motor Good Performance

Sc/Sc Electic Construction Hoist Elevator Motor Good Performance

Sc/Sc Electic Construction Hoist Elevator Motor Good Performance

Sc/Sc Electic Construction Hoist Elevator Motor Good Performance


FAQ of Building Hoist

 

Q: What is the building hoist main purpose? 

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal 

construction equipment for vertical transportation in the field of construction.  

Q: What is the main structure of building hoist? 

A: The P/M construction hoist mainly contains metal structure, driving system, electrical control system, cable guide & 

protection system, electrical top crane and safety device.  

  

Q: What is the meaning of the building hoist’s code?

 A: Take SC200/200 for example: “SC” stands for rack and pinion hoist, “200/200” stands for double cage and capacity 

is 2 tons per cage. “SC200” stands for single cage and capacity is 2 tons. 

 

Q: What is the dimension of the cage? 

A: Normally the cage dimension is 3X1.5X2.5M (L/W/H) for 2t type hoist. Details should be checked according to our 

quotation sheet. Also, the size can be customized according to the factual site condition.  There are two doors (entrance

 & exit doors) for each cage, It can be produced as up & down sliding or ramping model for safety and convenience


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to set up the construction elevator?
According to drawings, find the embedded at the scene near the level of architectural axis positioning and high elevation line (50 wire or 1 m wire) location and double-check, axis dividing levels as much as possible in accordance with the size distribution. Find out after each axis, measuring building contour, and map measure the buildings, and building construction drawing contrast, timely transfer measurement results to the designer, designer analyze the error and make changes
Q:What procedures and procedures will be required to re-use after the construction elevator overhaul?
Important parts replacement needs to be changed to the qualification, the procedure is like the new ladder, according to the new ladder standard test.
Q:How many floors do you need to install a construction elevator?
Do not have a regulation, as long as the benefit construction organization, installation does not install construction lift machine all can. It should be explained that the construction elevator has manned and pure cargo. Note: the installation of the construction elevator is required before the installation of the local quality and technical supervision bureau. After the installation, the safety record is made in the safety record in the use of the safety record.
Q:Is the construction elevator the same as the construction elevator
Construction lifter and building construction elevator, manned cargo construction machinery is a frequently used in construction, because of its unique enclosure structure make it take up both comfort and safety, construction lifter is usually used with tower crane on the construction site, the average load in 1-3 tons, running speed is 1 to 60 m/min. There are many kinds of elevators in construction, there are no two kinds of weights and weights in the way of operation, and they are controlled by manual control and automatic control. You can also add inverter and PLC control modules as needed, and also add floor calling devices to the peace layer. The structure principle and characteristics of construction lifter: construction lifter for meet the needs of the lean construction bridge, chimney, etc, it according to the building shape, install the guide frame tilt, and hanging basket level, along the inclined guide plane running up and down.
Q:Why is the construction elevator open on one side and the other on the other
Open the door, commonly known as the feed door, usually open up, and add weights to both sides. Only if the construction ladder stops at the bottom. If the door is double open, the room must be left with half a door (> 1.3 m) to open the door completely. If it is a single open door that opens up, you can save space in the cage. Double door, namely, two doors, either up or down, the two doors balance weight. It usually arrives on the required floor. There is enough room for double doors.
Q:Why is the construction elevator not so close to the structure?
Isn't there a car? Normally, the center line of the car should be in the same line as the support frame center. If the frame body (standard) get into the building, inevitably cause capsules center, usually the center of gravity and center is not a straight line on the standard section, capsules will force up and down roller, increase and the frame body wear, and certainly not safe.
Q:Do the elevator need to be installed when the main project is in construction
Installation, of course. The general building should be installed at about 10 meters on the 4th floor, or the person will go up and down the time is dangerous, and there will be some materials that can't be carried by the tower, too slowly
Q:How does the construction lift fall without electricity
The lockers are finished with the report, unless there is a problem
Q:How does the construction elevator add up
The principle is simple Now, the construction of a manned, cargo-carrying construction elevator is a gear rack. You can't understand how to say that you can't understand
Q:There are differences between the construction elevator and the construction elevator
The principle is different, the construction elevator operates in the litter box. The elevators are short for construction elevators, which are very high in the safety and performance of large facilities that can be used on the site. The construction elevator should be a dual-use lifting device.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range