Sc/Sc Electic Construction Hoist Elevator Motor Good Performance

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
1000 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Structure of Building Hoist


Model NO.:(SC200/200)

Type:Lifting Platform

Application:Construction Usage

Tower Crane Type:Slewing Tower Crane

Sling Type:Wire Rope

Main Girder Form:Double Girder

Power Source:Hydraulic

Moving Type:Fixed

Installation:Jack-Up

Certification:ISO9001: 2000, CE

Condition:New

Max.Lifing Load:2*2000kg

Max.Lifting Height:400m

Main Power Source:3~380V

Cage Size:3mx1.5mx2.6m

Cage:Double

Mast of Section:0.65X;0.65X1.508m

Color:According to Customer Need

Warranty:1 Year

Total Power:43.5

Max. Free End Height of Guides:7.5m

Export Markets:North America, South America, Eastern Europe, Southeast Asia, Africa, Mid East, Eastern Asia, Western Europe


Building hoist Specifiction

Elvator classification ModelRated load capacity(kg)Lifing speed
(m/min)
Motor power
(kw)
Rated fixing load capacity
(kg)
Balanced weight capacityDimension inside cage(length*width*height)
Normal frequency construction elevatorsingle cageBalanced weightSCD2002000332× 11100010003.0× 1.3× 2.4
Unbalanced weightSC2002000333× 11200003.0× 1.3× 2.4
SC1001000332× 11100002.5× 1.3× 2.4
double cageBalanced weightSCD200/2002× 200033(2× 2)× 112× 1000210003.0× 1.3× 2.4
Unbalanced weightSC100/1002× 100033(2× 2)× 112× 100002.5× 1.3× 2.4
SC200/2002× 200033(2× 3)× 112× 200003.0× 1.3× 2.4
Frequency construction elevatorsingle cageBalanced weightSCD20020000-633× 15100010003.0× 1.3× 2.4
Unbalanced weightSC20020000-633× 15200003.0× 1.3× 2.4
SC10010000-633× 11100002.5× 1.3× 2.4
double cageBalanced weightSCD200/2002× 20000-63(2× 3)× 152× 10002× 10003.0× 1.3× 2.4
Unbalanced weightSC100/1002× 10000-63(2× 3)× 112× 100002.5× 1.3× 2.4
SC200/2002× 20000-63(2× 3)× 152× 200003.0× 1.3× 2.4

Building Hoist Images


Sc/Sc Electic Construction Hoist Elevator Motor Good Performance

Sc/Sc Electic Construction Hoist Elevator Motor Good Performance

Sc/Sc Electic Construction Hoist Elevator Motor Good Performance

Sc/Sc Electic Construction Hoist Elevator Motor Good Performance

Sc/Sc Electic Construction Hoist Elevator Motor Good Performance


FAQ of Building Hoist

 

Q: What is the building hoist main purpose? 

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal 

construction equipment for vertical transportation in the field of construction.  

Q: What is the main structure of building hoist? 

A: The P/M construction hoist mainly contains metal structure, driving system, electrical control system, cable guide & 

protection system, electrical top crane and safety device.  

  

Q: What is the meaning of the building hoist’s code?

 A: Take SC200/200 for example: “SC” stands for rack and pinion hoist, “200/200” stands for double cage and capacity 

is 2 tons per cage. “SC200” stands for single cage and capacity is 2 tons. 

 

Q: What is the dimension of the cage? 

A: Normally the cage dimension is 3X1.5X2.5M (L/W/H) for 2t type hoist. Details should be checked according to our 

quotation sheet. Also, the size can be customized according to the factual site condition.  There are two doors (entrance

 & exit doors) for each cage, It can be produced as up & down sliding or ramping model for safety and convenience


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Is the construction elevator a special equipment
The construction elevator is special equipment, the installation and demolition of the special construction plan, after the installation, the special equipment can be tested and qualified for use
Q:How is the construction elevator installed
Construction elevator installation 1) the location of the elevator depends on the condition of the site and the equipment, so as far as possible, stay away from the overhead line and keep the safe distance specified. When the elevator is running, there is a lot of danger and should be avoided. 2) the order of installation is: 3) place the chassis on the base and the base pre-buried bolt, and the platform is placed on the chassis, and the basket is placed in the middle of the chassis. 4) to install the standard section, each installation of two standard sections (usually less than 8m) to be temporarily fixed. The wire rope shall be used for the use of the temporary cable, and the joints and supporting points shall be bolted and not tied with the lead wire. 5) the installation should alternate between the two columns. Node bolt specification must according to the aperture matching, not packing, found that the aperture position at the time, can not arbitrarily expanding, more can't to lead wire bundle, instead to avoid loose node deformation. 6) when installing the standard section, pay attention to the vertical degree of the guide, and the line of the guide line should not appear in the line of folding and too big clearance to prevent the collision from running. 7) when construction site conditions permit, it can be assembled on the ground and then hoisted on the whole to reduce the height of the work. Due to the design of the frame, the stress condition of the construction is only considered, so before the whole moving up, the counter can be temporarily strengthened to enhance the bending capacity of the nodes.
Q:The construction elevator always jumps
The starting current is more than three times the running current, and your air switch is low in the maximum current
Q:How large a leakage protector is used for the construction elevator
The leakage current is less than 30 milliamps The short circuit current is typically 1.2 to 1.5 times the rated current If the motor is rated at 10, it is usually used with a 125-15 leakage protector
Q:How many meters must be installed in the construction elevator search?
In the guangdong area, the first installation and acceptance of the equipment will be below 7 levels, and more than 7 floors will be charged for the inspection. Another 9 meters per wall, the most suitable installation time is a building at least 12 meters, which can be installed at 21 meters in the evening.
Q:Can a construction elevator use a single cage
The construction elevator is designed to solve the construction machinery that can not be carried by the dragon door frame. Dual-use is the biggest feature of the construction elevator.
Q:How many floors are built to use the construction elevator? With six floors?
The construction elevator, the average layer height above 12 floors need to be used, the hoist machine is not to go up to use the construction elevator to send a person to carry a few light things upstairs.
Q:How many years does the construction elevator usually use?
More than eight years will not give you the advice to get the factory refurbished
Q:The construction elevator is commonly used in the process of the project
Basically: completed from the main body - - complete completion
Q:The calculation of the use of electricity in the construction elevator
Use electricity in the field (1) lifting equipment class: tower crane 2, construction elevator 3; According to the table, K = 0.3 cos phi = 0.7 tg phi = 1.02 JC = 40% (temporary load) Pe = 2 times 63 + 3 times 11 = 159 (kW) And then power: PS = 2 times Pe = 2 times 159 = 201 (kW) Pjs1 = K * PS = 0.3 * 201 = 60.3 (kW) Qjs1 = tg phi by Pjs1 = 1.02 times 60.3 = 61.5 (kVA)

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range