RM70 Electric Motor Rammer Hammer, Stamping Hammer 2.2kw 3kw

Ref Price:
Loading Port:
China main port
Payment Terms:
Min Order Qty:
1 pc
Supply Capability:
100 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

Robeta tamping rammer add 4-cycle engine to the preferred vibratory rammer design in the industry and you have a winning combination. The engines are specifically designed for rugged rammer applications. These tamping rammers are designed for the compaction of cohesive, mixed and granular soils in confined areas.

Features and Benefits:

The separating structural design of gear box’ cover makes the machine run smoothly, easy to assemble and disassemble.

The assembled plate with unique technological production is durable, not easy to damage.

The forging gear is strong and durable; the mount with double strengthened steel bar makes driving power safe and reliable.

The switch adopted new sealed design and assembled by company’s professionals thoroughly clear up bad hidden trouble.

Strict check of all parts and complete machine has ensured that quality of every product is best before leaving our factory.

It owns many advantages. Such as interchangeability of end cover, high concentricity between bearings, low energy consumption, strong impacting force and setting an observation hole of lubricant oil.

Product Specifications: 

Model: RM70

Engine Type: 220V/380V

Engine Power: 2.2kw/3kw

Leap height: 40-65mm

Impact Force: 10-13KN

Impact Frequency: 450-650 times/min

Plate Size: 30cm x 31cm

Weight: 70kg

Packing Size: 54cm x 60cm x 97cm


Q1: Does the Rammer Hammer use electricity or diesel?

A1: The Rammer Hammer adopt World Famous Brand electric motor.

Q2: How do we guarantee the quality of our products?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 10 to 30 workdays.

Q4: If we can produce some Rammer Hammer according to customers request?

A4: Yes, we can produce Rammer Hammer according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.

Q5: How to make a quick resolution for after service?

A5: OKorder and our manufacture both have overseas branches all-around of world, IF needed, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities & skilled personnel at site for training.

RM70 Electric Motor Rammer Hammer, Stamping Hammer 2.2kw 3kw

RM70 Electric Motor Rammer Hammer, Stamping Hammer 2.2kw 3kw

RM70 Electric Motor Rammer Hammer, Stamping Hammer 2.2kw 3kw

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How much force hit the rammer
The unit that is not a force is an energy unit, usually tons of meters.For example, RAM hammer (diesel hammer) weighs 2 tons, lifting distance of 2 meters, then ramming energy is 2X2=4 tons of meters.
Q:Ramming machine add gear oil or hydraulic oil
Then, where do you want to add? Generally add hydraulic oil ~!
Q:Gasoline rammer return pipe leakage is going on
This problem is not recommended to repair and repair, repair and repair once hundreds to thousands or even tens of thousands. But it may not solve the problem, but also hurt the car. It is recommended that the majority of car owners use the "free repair and repair" method to solve the problem of automobile oil leakage.
Q:Vertical rammer leakage repair
In addition, we should also pay attention to whether the camshaft rear oil seal is leaking. Oil seal aging, rupture, oil leakage should be replaced in a timely manner. In addition, check the engine lubrication system for leakage of parts.If the oil leakage at front and rear oil sealEven after the cylinder head cover, and the valve tappet chamber, oil filter, oil sump liner multiple oil exudation, but can not find obvious leakage, should check the crankcase ventilation, clean crankcase ventilation pipe, especially to check whether the PCV valve due to carbon deposition and glue card lag caused by bad work.
Q:CFG pile base can use tamper tamp it
1, CFG pile profiles:CFG pile is English Cement Fly-ash Gravel Pile abbreviation, meaning cement fly ash gravel pile, by gravel, stone chip, sand, fly ash mixed with cement, water mixing, with a variety of pile machine made of variable strength pile. By adjusting the amount and proportion of cement, the strength grade varies between C15-C25, which is a kind of pile type between the rigid pile and the flexible pile. CFG pile and soil between piles with the formation of CFG pile composite foundation to work together through the cushion, so it can be based on the behavior of composite foundation and calculation in engineering design. CFG piles generally do not need to calculate the reinforcement, and can also use industrial waste, fly ash and stone debris as admixture, further reducing the cost of the project.
Q:Do not pull a gasoline rammer
I hope you can describe and supplement your questions as soon as possible so that everyone can help you. Thank you.
Q:The memory has a rammer is star connection, only received three Fire
The three phases of an electric motor are balanced. Neither the star nor the horn requires zero lines, as long as the three lines are on fire.
Q:Principle and application of rammer
Ramming machine power rammerCompaction machine for tamping compacted backfill soil by impact and impact vibration. Sub fire rammer, breaststroke tamping rammer and etc..Thermal rammerAccording to the principle of two stroke internal combustion engine, there are two upper and lower pistons in the cylinder. The upper piston is an internal combustion piston, and the lower piston is a buffer piston. The lower part of the cylinder is fitted with a rammer with an inclined bottom to deflect the vertical axis of the cylinder toward the front. The piston rod from the through hole of the cylinder cover in the middle reach of piston rod from the lower end of the cylinder and hammer out and integrated between cylinder and hammer with spring tension, direction and a handrail is arranged to control the rammer. The fire is rammed under the action of the explosive force of the combustible mixture, so it jumps off the ground from the top to the top, and then hits the ground and strikes the soil under the weight of itself. The hammer falls and the body moves forward step by step.
Q:Vibratory plate compactor and impact rammer which effect is good
Tamping large area sand and crushed stone should be done by flat rammer,Compacted clay like long and narrow groove foundation shall be impacted by vertical impact rammer. Hope to help you.
Q:Should the foundation be compacted by tamping machine?
Yes, the filling soil must be compacted to reach the requirements of the compactness given by the drawing or specification

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range