• Ringlock Vertical Easy Assembly Top Quality Metal System 1
  • Ringlock Vertical Easy Assembly Top Quality Metal System 2
  • Ringlock Vertical Easy Assembly Top Quality Metal System 3
Ringlock Vertical Easy Assembly Top Quality Metal

Ringlock Vertical Easy Assembly Top Quality Metal

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
2 m.t.
Supply Capability:
100000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Ringlock Scaffolding 

Ringlock Vertical Easy Assembly Top Quality Metal

Ringlock is a modular scaffold system which can provide major savings in labor costs while meeting the demands for safety, ease of handling and reductions in maintenance. 


Ringlock scaffold has the following features: 


1.Quick erection: Ringlock scaffold are all pre-measured and just a hammer is required when erection. 
2.Safety: The reliable wedge connections prevent ledgers and diagonal braces from any kind of loosening, The rigid, right fit of all connections with concentric derivation of loads guarantees safety even at great heights.

Ringlock Vertical Easy Assembly Top Quality Metal

Main Features of the Ringlock Scaffolding


Place of Origin

Beijing, China (Mainland)

Product Name: 

Ringlock Scaffolding

Custom Code

7308400000

Color

Silver, golden

Surface treatment

Painted,Hot-Dip,Galvanized,Electro Galvanized, Powder Coating

Material

Q235,Q345.etc

Package

Customized Package

Payment Terms

T/T,L/C

Delivery Detail

15-25 Days

Quality Control

IS09001 Certification, Quality Test

Standard

48.3*3.25*4000mm 

Ledger

48.3*3.25*3072mm

Ledger End

1.2kg


Advantages


1)To be erected easily and quickly

2)Installed to different angels with rosettes of

    two different hole being positioned there

3)Ringlock scaffolding provides complete flexibility to lock in any angel.

4)Diagonal braces are to be tailored in 

  accordance with the lengths of vertical and horizontal tubes




Ringlock Vertical Easy Assembly Top Quality Metal

Specification of Ringlock Scaffolding


     Ringlock Vertical Easy Assembly Top Quality Metal

                 Ringlock Vertical Easy Assembly Top Quality Metal

    

 

The Standards(Verticals)

Length(mm)

Tube Thickness(mm)

Tube Diameter(mm)

Surface Treatment

3000

3/3.25

48

HDG/Painted

2500

3/3.25

48

HDG/Painted

2000

3/3.25

48

HDG/Painted

1500

3/3.25

48

HDG/Painted

1000

3/3.25

48

HDG/Painted

500

3/3.25

48

HDG/Painted

Ringlock Vertical Easy Assembly Top Quality Metal 

The Ledgers(Horizontals)  

Effective Length(mm)

Tube Thickness(mm)

Tube Diameter

Surface Treatment

2000

3/3.25

48

HDG/Painted

1770

3/3.25

48

HDG/Painted

1000

3/3.25

48

HDG/Painted

Ringlock Vertical Easy Assembly Top Quality Metal

                                              The Diagonal Brace

Length(mm)

Tube Thickness(mm)

Tube Diameter(mm)

Surface Treatment

2411

3

48

HDG/Painted

2244

3

48

HDG/Painted

Ringlock Vertical Easy Assembly Top Quality Metal

                                                       The bracket

Length(mm)

Tube Thickness(mm)

Tube Diameter(mm)

Surface Treatment

730

3

48

HDG/Painted

Ringlock Vertical Easy Assembly Top Quality Metal

                                                               Plank

Effective Length(mm)

Width(mm)

Height(mm)

Surface Treatme

2050

480

45

HDG

1820

480

45

HDG

3000

240

45

HDG

2000

240

45

HDG

1000

240

45

HDG

Ringlock Vertical Easy Assembly Top Quality Metal

                                         Hollow Head Jack And Jack Base


Length(mm)

Tube Diameter(mm)

Size of Plate(mm)

Surface Treatment


600

38

150*120*50*4

HDG


600

38

150*150*4

HDG


Accessories


Ringlock Vertical Easy Assembly Top Quality Metal

Ringlock Vertical Easy Assembly Top Quality Metal


Packing


Ringlock Vertical Easy Assembly Top Quality Metal

Inspection

Ringlock Vertical Easy Assembly Top Quality Metal

    Ringlock Vertical Easy Assembly Top Quality Metal

       Ringlock Vertical Easy Assembly Top Quality Metal

        Ringlock Vertical Easy Assembly Top Quality Metal

Project


Ringlock Vertical Easy Assembly Top Quality Metal


More Photos

Ringlock Vertical Easy Assembly Top Quality Metal

Ringlock Vertical Easy Assembly Top Quality Metal






Q:Can you shorten the distance of the bowl buckle scaffold? That is, regardless of the length of the pole, the distance can be set to 60, 90, 120cm. Thank you
The step distance of the bowl buckle steel tube frame must be determined through calculation; for example, the vertical distance of the vertical rod is 120
Q:What are the requirements for the broken seam connection of bowl buckle scaffold. For example, both sides of the seam on the vertical pole is very neat, with steel pipe
Scaffolding does not require the interface may not be in the same span, and the scaffold is not allowed to mix the length of the pole, must use the same height of the pole or cloth from the same pole, according to your description I guess you use is not the same as the length of the pole, or the use of ordinary steel pipe Mashup scaffolding. If the use of uniform specifications of the bowl buckle steel pipe should not be your problem.
Q:How much is the price of the bowl buckle scaffold
The average price of 150 yuan / ton / month, bowl buckle scaffolding rental costs of -3 minutes / M / day, different regions, different prices.
Q:I got mine done about 10 weeks ago, with the two rings either side of the ear to give it healing space, then about 2 weeks ago, got the bar put through it... but I still can't sleep/lie on it comfortably. How long after getting the piercing, roughly, have people been able to sleep on their without it hurting?
It takes 6-12 months for a cartilage piercing to heal when done properly with a needle and double that time if a gun was used. I don#x27;t know why they pierced you with rings (should never be used in a scaffold#x2F;industrial piercing) and especially why they changed it to a bar so soon. You should have been pierced with a bar to begin with because changing the jewelry like that causes irritation and prolongs healing time. I think you need to find a different piercer.
Q:How to calculate the amount of steel pipe in the bowl buckle scaffold formwork system? What is the good software or experience of the eldest brother?
To determine the spacing between the poles, but these are theoretical things. In fact, the general use of 1200 or 900 of the space. According to the size of the room layout on the line
Q:I'm getting one on Saturday, I already have double lobe piercings in each ear, and a flesh tunnel in my right, but i've heard cartiliage piercings hurt alot more than a normal lobe one?
I just got mine done last weekend, I wont lie its worse then a regular lobe piercing but every body reacts differently. The second hole definitely hurts worse then the first, but for me after the fact mine didn't hurt at all, some people say it throbs or burns but mine never did any of that. Good luck :)
Q:How much is the erection height of double row scaffold
It is true that the bowl buckle scaffold and the steel pipe scaffold height requirements are different, and the single row scaffold and double row scaffold are also different.
Q:How do I know?
If you're ear doesn't have much of a curve at the top , you are probably not suited for it. But for the best opinion , ask a piercer :)
Q:Now there are oblique cast-in-place concrete beam bridge with oblique oblique do not know whether the bowl buckle scaffold or plug type scaffold can freely adjust the angle of skew, plug type scaffolding steel pipe is also 60cm, 90cm a root length
Is not according to the level of tilt adjustment, the height depends mainly on the vertical rod to adjust the height of backwater. Generally in the range of 10-30cm adjustable jacking.
Q:A window washer is standing on a scaffold supported by a vertical rope at each end. The scaffold weighs 210 N and is 3.30 m long. What is the tension in each rope when the 690 N worker stands 2.30 m from one end?______ N (smaller tension)______ N (larger tension)
assuming the scaffold is uniform weight, take moments around 1 end to get the tension in the rope of the other the ∑M = 0, take the rope tension direction as positive 690 x 2.3 + 210 x (3.3 / 2) = T1 x 3.3 T1 = 586N Now moments around the other end 690 x (3.3-2.3) + 210 x (3.3/2) = T2 x 3.3 T2 = 314N You can check your answers as ∑F = 0, so 586 + 314 - 210 - 690 = 0

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords