Product Description:

Ringlock Scaffolding System
1.Safe and reliability; 
2.Simple and efficient to assembly; 
3.Free maintenance; 
4.Customized design.


Ringlock Scaffolding System Ring-lock System


Introduction

Ringlock scaffolding is a multi-purpose modular scaffold system which can be used for all forms of access and support structures in the building and construction industries, ship building, offshore construction and industrial maintenance.
NCBM Ringlock system scaffolding consists of galvanized high strength steel modular components that are assembled together using integral wedge connectors. The system has a complete range of accessories, including: steel planks, side brackets, system toe boards, stairs, ladders and reinforced ledgers.
As our all components are galvanized and built for increased safety, service life, and resistance to damage, CNBM ringlock system scaffolding is perfect for all types of applications and industries.
This ringlock system scaffolding can accommodate up to eight connections of combined ledger and braces. Each of these connections can safely carry a load of 11.12kN (2500LBS).
However the total sum of the ledger loads must not exceed the recommended leg load for the given bracing situation.


What we can provide: (click to view products)

Ringlock system standard / vertical / upright

Ringlock system ledger / Horizontal / Runner

Ringlcok system Truss Ledger / Double Ledger

Ringlock system diagonal / Bay braces

Ringlock system Clamp Brace

Ringlock system Lattice Girder

Ringlock system Intermediate Transom/Mid-Transoms

Ringlock system Side Bracket

Ringlock system Leg Lock

Ringlock system Guardrail Standard "Crazy Leg"

Ladder & Bracket

Steel Plank

Ringlock system Interlocking Toe board

Ringlock system Infill plank

Ringlock system Screwjack / Base Jack

Ringlock system Stair stringer & Stair tread

Ringlock system starter / Base Collar

Ringlock system Adapter for 12" Caster

Ringlock system Rosette clamp

Ringlock scaffolding caster 12”

Ringlock system Strorage Rack

Scaffold cage


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the measures in the rainy season? What precautions must be done?
the preparation of construction organization plan, according to the characteristics of the construction of the rain, will not be the construction of the sub-project in advance or delayed construction
Q:Prefabricated concrete pipe piles belong to raw materials or structural parts
There are columns: pipe pile, frame column, independent column, structural column, Cylindrical, L-shaped columns; brick columns, concrete columns, wooden columns Beam: frame beam, connecting beam, over beam, ring beam, cantilever beam, curved beam; steel beam, wooden beam, concrete beam Plate: cast-in-place board, prefabricated flat plate, prefabricated hollow plate; reinforced concrete plate, wood board Wall: brick wall, concrete wall, roof daughter wall, light partition Doors: solid wood doors, plywood doors, steel doors Windows: steel windows, wooden windows, aluminum windows, steel windows Building accessories are construction and construction components other than building blocks, such as scaffolding, pipe thread regulators for construction, construction bars, triangular construction supports, and steel joints
Q:In the scarlet letter why is hester taken to the scaffold in the market-place?
This is where she is punished. People taunt her while she is standing up there. It is to make her feel shame.
Q:What would you like to ask?At what height do scaffolds have to be engineered?
At all heights...they are engineered as a system.
Q:Seeking the Responsibility System of Safety Responsibility of Each Function Department
The responsibility system, policies, laws and regulations for the safe production of the production safety departments, and the actual development of the company's safety production, civilized construction and environmental management in line with the actual implementation of the company's safety production responsibility system
Q:Can the fifteen typhoon blow up the three - storey house?
The residents in the home against the typhoon to pay attention to what】? To put away a variety of hanging objects inside and outside the house to prevent the wind falling objects wounding; garden flowers with a bracket to protect, pruning branches to prevent the destruction or damage to the roof; The need for doors and windows, and add nailed wood; check the line, ready to flashlight, candles, storage of drinking water to prevent power off the water; more than a day food and vegetables, not necessary to go out
Q:A man of mass 60.3 kg stands on a scaffold supported by a vertical rope at each end. The scaffold has a mass o?
this is a 2d concern. The moments approximately any component interior the gadget could desire to stability, in any different case the gadget (scaffold) might rotate. additionally, the vertical forces could desire to stability, or the gadget (scaffold) might translate. it style of feels to me that to the spectacular from the middle of the scaffold this is a distance one 6th of the dimensions of the scaffold is the comparable as announcing 2-thirds from the left-edge of the scaffold. The moments could be summed approximately any component. i will evaluate the left edge of the scaffold, the place the 2d produced by utilising the left rope is 0. finished M = 0 = scaffold M + guy M + spectacular rope M 0 = 23.7kg*9.8m/s^2*(3.1m/2) + 60.1kg*9.8m/s^2*(2*3.1m/3) - F*3.1m wherein: the scaffold is assumed to be a component mass placed at its middle the tension F acts opposite to the load of the guy and the scaffolding, and subsequently has -ve sign sparkling up for F. To get the tension in the different rope, you may basically evaluate the vertical forces interior the gadget. besides the fact that, you're able to desire to sum the moments approximately another component (say, the spectacular rope). desire this enables.
Q:Sprinkling water on the construction helps to help reduce haze days
to strengthen the possible production of dust material management, bags of cement, fly ash, lime and other handling and use of the process, should avoid falling from the height, Put, should not be forced to beat in the cutting tiles, concrete and other bulk materials used wet method the construction site of the road, gravel and other building materials yard and other operating areas, continuous wet ground in the dry, often sprinkle water, keep the dust is not up bulk materials, construction waste must be in accordance with the provisions of the implementation of vehicle closed transport, loading and unloading is strictly prohibited volley scattered To strictly control the dust of the mixing machine Scaffolding and other facilities to be removed after the first dust removal, and to be removed when someone was monitoring safety and environmental protection Second, the dust management living area canteen stove as far as possible the use of liquefied petroleum gas, gas and electricity, shall not use wood and bamboo, etc, to reduce dust pollution the site is strictly prohibited incineration of waste and waste materials and linoleum, plastic, etc, in person to clean up garbage the scene is not allowed to melt asphalt, to prevent emissions and dust pollution the scene of cement into the library to prevent dust, pay attention to control the cement library purchase volume Third, the sound of environmental management (a) sound environmental management strict control of construction noise, noise emissions should be consistent with the state's "construction site environmental noise emission standards" (GB-90) should be scientific and reasonable arrangements for operating time, must be at night construction, according to the provisions of the construction permit, reduce construction noise
Q:Is it necessary to use a mat on the floor? Is that norm prescribed?
Scaffolding erection specification staff up and down and transport materials When lifting the weight with the lifting device, it is not permissible to connect the lifting device and the scaffolding structure set up scaffolding work leaders should take the scaffolding to pass the test and issued a written proof of the use of the prospective use The person in charge of the maintenance work should check the status of the scaffolding and scaffold used daily, and if necessary, refurbish immediately is strictly prohibited with hand barrels, wooden boxes, bricks and other building materials take temporary plate to replace the regular scaffolding scaffolding on the prohibition of random wire Must be installed temporary lighting lines, wood bamboo scaffolding should be added insulators, metal pipe scaffolding should be another wooden cross the installation of metal pipe scaffolding, prohibit the use of bending, flattened or cracked pipe, the successive parts of each tube to be intact, to prevent dumping or moving metal pipe scaffolding of the pole, must be vertically placed on the plate, in the placement of the floor before the ground to consolidate, leveling The pole should be fitted with a pillar, which is made of a pillar base and a pipe welded to the floor metal pipe scaffolding joints, the application of special hinges overlap each other, this hinge for right angles, but also for acute and obtuse (for bracing, etc) The hinge bolts connecting the various components must be tightened scaffold board must be fixed in the metal pipe scaffold on the beam when moving scaffolding, the scaffolding of all staff must be down, above the work of the scaffolding prohibited to move.
Q:What is the difference between a steel pipe stent and a steel scaffolding? The
If you can "combine", it is a good thing, you can reduce the type of components and models, to improve the use of its turnover, thereby reducing the project cost

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range