Ringlock Scaffolding System Ring-lock System
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 100 m.t
- Supply Capability:
- 1200 m.t/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Ringlock Scaffolding System
1.Safe and reliability;
2.Simple and efficient to assembly;
3.Free maintenance;
4.Customized design.
Introduction
Ringlock scaffolding is a multi-purpose modular scaffold system which can be used for all forms of access and support structures in the building and construction industries, ship building, offshore construction and industrial maintenance.
NCBM Ringlock system scaffolding consists of galvanized high strength steel modular components that are assembled together using integral wedge connectors. The system has a complete range of accessories, including: steel planks, side brackets, system toe boards, stairs, ladders and reinforced ledgers.
As our all components are galvanized and built for increased safety, service life, and resistance to damage, CNBM ringlock system scaffolding is perfect for all types of applications and industries.
This ringlock system scaffolding can accommodate up to eight connections of combined ledger and braces. Each of these connections can safely carry a load of 11.12kN (2500LBS).
However the total sum of the ledger loads must not exceed the recommended leg load for the given bracing situation.
What we can provide: (click to view products)
Ringlock system standard / vertical / upright
Ringlock system ledger / Horizontal / Runner
Ringlcok system Truss Ledger / Double Ledger
Ringlock system diagonal / Bay braces
Ringlock system Clamp Brace
Ringlock system Lattice Girder
Ringlock system Intermediate Transom/Mid-Transoms
Ringlock system Side Bracket
Ringlock system Leg Lock
Ringlock system Guardrail Standard "Crazy Leg"
Ladder & Bracket
Steel Plank
Ringlock system Interlocking Toe board
Ringlock system Infill plank
Ringlock system Screwjack / Base Jack
Ringlock system Stair stringer & Stair tread
Ringlock system starter / Base Collar
Ringlock system Adapter for 12" Caster
Ringlock system Rosette clamp
Ringlock scaffolding caster 12”
Ringlock system Strorage Rack
Scaffold cage
- Q:What is the most important safety hazard at the construction site?
- Civilized construction Site fencing Some works in the urban area of ??the main section of the site is not set above the 25m fence some site fence material is not strong, unstable, not clean, do not meet the local aesthetic requirements
- Q:What is the exterior scaffolding erection specification? What do you need to pay attention to?
- That it is what to do with it, for home improvement, then, in the end how much help? Need to pay attention to a few points:
- Q:What is the bamboo board for the scaffolding of the building?
- Scaffolding, also known as scaffolding, in the scaffolding, the operating frame laying, to facilitate workers walking in the top, transport materials and construction operations of a temporary turnover of the use of building materials
- Q:Is it necessary to use a mat on the floor? Is that norm prescribed?
- Scaffolding erection specification staff up and down and transport materials When lifting the weight with the lifting device, it is not permissible to connect the lifting device and the scaffolding structure set up scaffolding work leaders should take the scaffolding to pass the test and issued a written proof of the use of the prospective use The person in charge of the maintenance work should check the status of the scaffolding and scaffold used daily, and if necessary, refurbish immediately is strictly prohibited with hand barrels, wooden boxes, bricks and other building materials take temporary plate to replace the regular scaffolding scaffolding on the prohibition of random wire Must be installed temporary lighting lines, wood bamboo scaffolding should be added insulators, metal pipe scaffolding should be another wooden cross the installation of metal pipe scaffolding, prohibit the use of bending, flattened or cracked pipe, the successive parts of each tube to be intact, to prevent dumping or moving metal pipe scaffolding of the pole, must be vertically placed on the plate, in the placement of the floor before the ground to consolidate, leveling The pole should be fitted with a pillar, which is made of a pillar base and a pipe welded to the floor metal pipe scaffolding joints, the application of special hinges overlap each other, this hinge for right angles, but also for acute and obtuse (for bracing, etc) The hinge bolts connecting the various components must be tightened scaffold board must be fixed in the metal pipe scaffold on the beam when moving scaffolding, the scaffolding of all staff must be down, above the work of the scaffolding prohibited to move.
- Q:There is a 6.0-kg pail of paint to one side.How close to the left end can he approach safely? How close to the right end can he approach safely? Can someone help me with this problem, I keep working and reworking it and coming to the same answer. I must be consistently making the same mistake. If someone can help me work through it I would really appreciate it. The answers I got were:Left: dmin, left = .54mRight: dmin, right = .77m
- At the threshold of danger, the tension on the far rope reaches zero. (a) Distance from left edge = x; then summing moments about the left rope gives ΣM = 0 = 71.0kg * g * (1m - x) - 22.0kg * g * 2.0m - 6.0kg * g * 1m The g term cancels, and the rest solves to x = 0.296 m ? (b) Distance from right edge is X; summing about the right rope, and knowing the g terms will cancel, ΣM = 0 = 22.0kg * 2m + 6.0kg * 3m - 71.0kg * (1m - X) leads to X = 0.127 m ? Hope this helps!
- Q:There is no shelter outside the scaffolding project has been accident accident case
- When the construction unit dismantles the top steel formwork, the 18 steel pipes (4m long) and the fasteners are removed to the hanging plate of the frame, and five workers fall from the roof with the hanging plate
- Q:How to do a good job of typhoon during the mass transfer mobilization work
- strong winds may blow down buildings, high-altitude facilities, easily lead to casualties
- Q:Construction scaffolding erected what is the standard, there is no template can refer to it?
- Scaffolding erection specifications are as follows, if you want to do more understanding, then please look carefully Oh, a lot of content, looks a bit boring
- Q:In the scarlet letter why is hester taken to the scaffold in the market-place?
- This is where she is punished. People taunt her while she is standing up there. It is to make her feel shame.
- Q:Also if its possible part B wants to know A ball thrown vertically upward is caught bythe thrower after 2 s.Find the initial velocity of the ball. Theacceleration of gravity is 9.8 m/s2Answer in units of m/sFind the maximum height it reaches.Answer in units of m
- Use, Vf = Vo + g * t With Vo = 0 , Vf = g * t = 9.8 m/s^2 * 3.39 s = 33.222 m/s. part B, use the same equation, but take into consideration to watch for direction and adopt a convention. As before we have considered +ve for downward direction. Now Vf = 0 0 = Vo + g * t. Vo = - 9.8 m/s^2 * 2 s = -19.6 m/s . Negative means upward direction according to the adopted convention.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Ringlock Scaffolding System Ring-lock System
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 100 m.t
- Supply Capability:
- 1200 m.t/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products