Ringlock Scaffolding Superior Q235 Q345 Steel Galvanized
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 5000 m.t.
- Supply Capability:
- 100000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Galvanized Ringlock Scaffold System
1. Introduction:
Ringlock scaffolding, also called Modular Scaffolding and Multidirectional Scaffolding, the junction enables quick and easy connection of load bearing items as well as reinforcing parts to each other with an enormous rigidity.
Ringlock scaffolding is the new generation product of cuplock sacffolding.The buckle part is a disc which diameter 133mm,and thickness 10mm. Scaffold vertical is a tube of D48*3.5mm which material is Q235/Q345B. On the vertical welded many disc every specific distance ,there is 8 holes on the disc,used to jonit the posts. On the bottom of vertical post is a base collar used to connect the scaffolding and the ground. Ledger is made by a tube with two wedge welded on the ends separately.
2. Specification:
Item | Ringlock system | Dimensions(mm) | Weight(KG) | Surface treatment | Remark |
WY001050 | Vertical Φ48.3x3.25mm | 500 | 3.0 | Hot-Dip galvanized | |
WY001100 | 1000 | 5.4 | Hot-Dip galvanized | ||
WY001150 | 1500 | 7.7 | Hot-Dip galvanized | ||
WY001200 | 2000 | 10.0 | Hot-Dip galvanized | ||
WY001250 | 2500 | 12.4 | Hot-Dip galvanized | ||
WY001300 | 3000 | 14.8 | Hot-Dip galvanized | ||
WY001400 | 4000 | 19.3 | Hot-Dip galvanized | ||
WY002023 | Starting Collar | 230 | 1.6 | Hot-Dip galvanized | |
WY002043 | 430 | 2.7 | Hot-Dip galvanized | ||
WY003073 | Ledger Φ48.3x3.25mm | 732 | 3.5 | Hot-Dip galvanized | |
WY003075 | 750 | 3.6 | Hot-Dip galvanized | ||
WY003100 | 1000 | 4.0 | Hot-Dip galvanized | ||
WY003106 | 1065 | 4.1 | Hot-Dip galvanized | ||
WY003109 | 1088 | 4.6 | Hot-Dip galvanized | ||
WY003129 | 1290 | 5.2 | Hot-Dip galvanized | ||
WY003140 | 1400 | 5.3 | Hot-Dip galvanized | ||
WY003150 | 1500 | 5.7 | Hot-Dip galvanized | ||
WY003157 | 1572 | 6.4 | Hot-Dip galvanized | ||
WY003200 | 2000 | 7.6 | Hot-Dip galvanized | ||
WY003207 | 2072 | 8.4 | Hot-Dip galvanized | ||
WY003250 | 2500 | 9.5 | Hot-Dip galvanized | ||
WY003257 | 2572 | 10.0 | Hot-Dip galvanized | ||
WY003300 | 3000 | 11.4 | Hot-Dip galvanized | ||
WY003307 | 3072 | 11.7 | Hot-Dip galvanized |
3. The parts of Ring Lock Scaffold
4. About us:
We are a professonal manufacturer of scaffolding,scaffolding couplers,frames and related products.
We have been in the business for more than 16 years, and all our products are BS 1139 and EN 74 certified, the quality is the best. Our products are very popular in European countries, Australia, North America, Mid-east countries, and South East Asia and some African countries, etc.
5. Our Service:
Inquiry service:
Accept user’s enquiries by all kinds of ways and establish user’s product cognition.Provide all kinds of product data and let customer understand characteristics of product.
Pre-sale service:
Accept inquiry of customers ,confirmation of investment advice of choice of product ,assist the customers to design the workshop
In-sale service:
Sale of product,help customers build the base ,technical training of customers’ workers ,practice of operation ,help to install ,train the operators in the workshop.
After-sale service:
24 hours service of technology inquiry, instant components supply, regularly technical service guidance of maintain,long distance malfunction control.
Unique service:
System up-grade,special design according to the customers’ requirement, mould renew ,supply new technology and products information.
- Q:Does it matter what size your ear is when you get an industrial/scaffolding piercing?
- The size of your ear does not matter. The proper placement and jewelry length do.
- Q:Tell me how much the shear strength can reach MPa, thank you
- The rail is made of steel plate, the load is 0.11kN/m, the safety net load is 0.0050kN/m2. Under the foot of the small cross bar on the top of the big bar, and a small bar between the main node. Basic wind pressure 0.35kN/m2, height variation coefficient 1.2500, shape coefficient of 1.1280. The standard value of bearing capacity of foundation is 190kN/m2, the basal area is 0.250m2, and the coefficient of bearing capacity is 1.
- Q:What is the size of the bowl buckle scaffold?
- Bowl buckle type scaffold poleName specification A (mm) B (mm) theoretical weight (kg)Riser LG-60 6004
- Q:What is the bowl buckle scaffold operating layer
- It is divided into single and double scaffolding, double row with landing and cantilever type. Single row are generally used for landing. Its main function is to protect. Specific reference to JGJ 1302011 "construction fastener type steel pipe scaffolding safety technical specifications" in the relevant instructions, and illustrations.
- Q:I've had my scaffold piercing for nearly a year now, and on the bottom hole i have a sore red lump on the outside (back of) my ear not in the fold but the back? if you get me?? But its SO sore and its quite red, and i was wondering whether i should pop it? do whatever to it? I've had it for a while now and it does flare up red and painful but then it stops hurting, but it getting on my nerves now and i dunno what to do with it??Thanks :)xx
- ive got that too on my ear i also had it when my i had my belly peirced it went away after a while
- Q:I really wanna get my scaffold done but I've watched video's of it being done on youtube and I'm absolutely terrified now...a lot of the people getting it done screamed :/ .. please can anyone tell me how painful is it to get done? and afterwards? and also is it always done with a needle??Thanks in advance
- Yes, all piercings should be done with a needle. Guns are cattle tagging pieces of poop and are inadequate for any piercing. Everyone has a different pain tolerance but if it's something you really want it'll be worth the pain, and piercings only last for a second and it's done. I imagine it would be quite painful though as it's cartilage which always tends to be a little stingy when being pierced.
- Q:i want to get a scaffold ear pireceing but i got my cartlige done about 2 to 3 years ago but any way if i got a industrial done who would they do it with my cartlige done would thay use it and just make one hole instead of two
- It's possible, but chances are the hole isn't at the perfect angle to meet up across the ear with the second hole. Like previous poster said, try the other ear, or move to a different part of the ear.
- Q:Why do so many buildings in Manhattan have scaffolding on the street level?
- I can think of two reasons: --The building owners are making changes to the entrance and first floor areas --The building owners are making changes to the upper levels, and the scaffolding is to prevent injuries to pedestrians in the case of falling construction debris.
- Q:Okay I have some questions:-When I get it done can I have- 2 labret retainers put in to hide them from my school?-If I can, how discreet are the retainers?-How long to heal? (Even though the piercer will tell me)-Have you got a picture of a scaffolding piercing with retainers? May I see it (:-And a basic clear cleaning regime?Thankyous (: x
- You could but it be best for a bar to be honest. Well retainers are clear and depending on your skin complexion it may be difficult or easy to detect. Industrials hurt I'm not going to lie. It look forever for mine to finally heal enough to wear i can lay on it. Your ear will throb and it will hurt like hell to touch it. The pain goes on for a couple of months. Sorry I have no pictures. For cleaning- Sea salt and warm water.
- Q:i have two holez i the bottom of my ear and now i wanna get something done to the top i want eather a scaffold or a cartlige and a tragus what do you guyz think
- i have my tragus done and it didnt hurt at all, so i would reccomend doing the cartilage/tragus, but make sure, just like with any piercing, to keep it clean.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Ringlock Scaffolding Superior Q235 Q345 Steel Galvanized
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 5000 m.t.
- Supply Capability:
- 100000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords