• Ringlock Scaffolding Ledger End System 1
  • Ringlock Scaffolding Ledger End System 2
  • Ringlock Scaffolding Ledger End System 3
Ringlock Scaffolding Ledger End

Ringlock Scaffolding Ledger End

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Place of Origin:
Shandong China (Mainland)


Model Number:
210
Material:
Malleable Steel
Framework:
Combined Scaffolding
H S Code:
73084000
Support Mode:
Protecting scaffoldig
Type:
Fixed
Surface finish:
HDG/Black/Painted
Usage:
Welded on the Ledger and Standard
Packing:
By Gunny bag and steel pallet

Packaging & Delivery

Packaging Detail:BY PALLET OR LOOSE IN CNTR
Delivery Detail:20DAYS

Specifications

ringlock scaffolding ledger end
1)Raw material: Malleable Steel
2)Weight:0.4-0.75kg
3)With Insert Wedge
4)Surface finish:B

Ledger End Used For Ringlock Product detail /Ringlock Scaffolding Ledger End :

Ringlock Accessoires:Ledger end/Right and Left Diagonal brace end.

Rosette

Raw material

Casted steel

Item Name

Casting Ledger/Left and right diagonal brace end for Ringlock scaffolding

Weight

0.3-0.8kg

Size:50x50x63mm 0.85kg

Size:42x50x69mm 0.45kg

Left/Right diagonal brace 0.75kg

Surface finish

Natural color.Galv. HDG

Standard

En74 AS1576

Certificate

SGS ,ISO9001:2000

Usage

Welded in Ringlock system

Package

Pvc bag with pallet

Service

OEM is offered

Payment term

T/T   L/C

Delivery time

28days upon prepayment

Rosette for Ringlock

Q345 raw material

Size

128x8mm     0.48kg

123x9.5mm 0.42kg

134x8mm   0.48kg


Q:What are the characteristics of disc scaffolding
Disc scaffolding and scaffolding, for manufacturers, construction units, rental units refer to a scaffold, just two different names. The same scaffolding.
Q:I got my scaffolding approximately about 7 weeks ago maybe just a lil over, I want to know when is a good time to change the bar/take it out, I am keeping up with cleaning it 2 to 3 times a day with the saline solution, even though, it only requires to be cleaned 1-2 times a day to be fair though
Scaffold piercings, being two cartilage piercings connected by a single bar, take six months for initial healing and twelve months for a fully healed tunnel of flesh to be formed. Don't change it yet, I assure you, you will regret it. Just be patient, keep on cleaning, cleaning, salt-soaking.
Q:21M high full scaffold erection scheme
2 even wall pieces must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall of the whole layer or several layers removed and then removed the scaffolding; demolition should not exceed the height of the 2 step, such as the height difference is greater than the step, should be added to strengthen the wall;3 when the scaffolding removed to the lower part of the last long rod height (about 6.5m), should be in the appropriate position to set up temporary support reinforcement, and then dismantle the wall;4 when the scaffold is divided into sections and sub sections to be removed, the two ends of the scaffold without dismantling should be added with the wall and the transverse reinforcement.
Q:Key points for safety of portal scaffolding
2, take off the scaffolding workers must wear a helmet, wearing a seat belt, wear non slip shoes.3, the construction load should meet the design requirements, shall not overload; shall not be stacked on the scaffolding template, steel and other objects. Prohibited in the scaffolding on the pull cable wind rope or fixed, erection of concrete pump, pump and lifting equipment etc..
Q:male scaffolders only if i was swinging on the scaffold would ya stomp on my fingers with ya workboots on?
No, I would use my hammer while I had my workboots on.
Q:A scaffold is constructed by placing two supports under a 13 ft, 9 in (a) board weighing 84 lbs. The supports are each 2 ft, 8 in (b) from their respective ends. Two painters stand on the board; one weighs 158 lbs and stands 4 ft, 11 in (c) from the left end of the board. Where must the 222 lbs painter stand so that each support carries the same weight? (express your distance in feet from the right end of the board (d).)please help!! thanks(:
Total weight = 222 + 158 + 84 = 464 lb So, each support must carry 232 lbs Working in inches: Take moment about Right hand end Board is assumed to be uniform - CG is at the center (232 x 32) + (232 x 133) = (158 x 106) + ( 84 x 82.5 ) +(222 x d)7424 + 30856 = 16748 + 6930 + 222d 222d = 14602 d = 65.77 inches Distance of 222 lb painter should be 5ft 5.77inches from Right end
Q:I have to write a 1 page commentary on a geographical issue for school, and, I've never done that before.Could someone please tell me or link me to a very simple 'writing commentary' scaffold for beginners?Please?Thankyou :)
A vegan alcoholic! A chuckle emerges, a laugh perhaps for a few more bobs. Absent the mind, nicely put.
Q:The outer hanging scaffold board 12 embedded parts embedded in the crack?
Is the pre embedded parts installation (burial) component hidden in the works inside. Is placed in the structure of casting fittings, for masonry superstructure when the lap. In order to facilitate the installation of engineering equipment based on external fixation. Most embedded parts made of metal, such as steel or iron, can also be used in wood, plastic and other nonmetallic rigid materials.
Q:Which kind of scaffolding is the most convenient and time-saving?
4, the new type of formwork is the most suitable for the early removal of the keel, through early demolition can save a lot of keel, formwork and support rod, saving about 30%.5, strong and durable, plug and socket is not afraid to fall, not easy to be dead by cement, easy to transport, easy to inventory. At the same time, there is no loss of spare parts, lower than the bowl buckle type multifunctional scaffold.
Q:I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
10, the scaffolding removed, should first check to connect with the building, and will remain on the scaffold material, clean, and other debris from the top down, according to the first after the demolition, demolition of first order after installation, demolition materials should be passed down or lifted onto the ground, step one clear. Not allowed to use the method of step down, it is strictly prohibited to throw down or push (pull) down the demolition method.11, take off scaffolding, should be set up warning area, and sent a special alert. In case of more than six winds and bad weather, the scaffolding should be stopped.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords