Ringlock Scaffolding Hot dip galvanized construction material

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
500 pc
Supply Capability:
100000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description

 

 

Why choose us

 

1. professional scaffold manufacturer
2. timely delivery
3. authorty certification
4. technical support

5. 8 years' experience

6. 6S management

 

 

 

 Ringlock Scaffolding Hot dip galvanized construction material

products size :

 

standard 48.3*3.2 mm

 

ledger     48.3*3.2mm

 

brace      48.3*2.5mm

 

Any size can be specificed


 

 

 

 

 

Packaging & Shipping

 

We ensure your goods can be delivered safely:

 

 1.Experienced packer and technician

 

2.Standard rack

 

3.Long-term cooperative freight forwarding and shipping company 

 

 

Ringlock Scaffolding Hot dip galvanized construction material

 

 

 

 

 

Our Services

 

Rapid Scaffolding takes pride in offering a team of highly experienced and suitably qualified engineering and technical experts. According to different requests from all our customers, we can provide a whole range of scaffolding and formwork designing, we also provide the total solutions for any project.

 

 

 

Ringlock Scaffolding Hot dip galvanized construction material  

 

 

 

 

 

Company Information

 

Certificates

As a professional scaffolding manufacturer for years' experience in China, we have obtained many certification authority, including ISO9001:2008, ISO14000, CE,  OHSAS18000 and our products are also tested to meet USA standard (ANSI A10.8), Australia/New Zealand standard, Japanese standard.

 

 

 

Ringlock Scaffolding Hot dip galvanized construction material  

 

 

 

 

 

Inspection

 

We have a strict quality control system based on the security awarness and the practice. According to the requirements of ISO9001:2008, we examine the products through the whole production from the raw material to the final products.

 

 

 

 

 

Ringlock Scaffolding Hot dip galvanized construction material

 

 

 

 

 

FAQ

 

What we are doing to ensure the high quality?

 

 1. Introducing quality assurance into projects at the earliest stage by continued planning, including comprehensive inspections.

 

 2.Maintaining the highest level of employee skills by the continual assessing and training of all employees.

 

 3. Maintaining a working environment based upon trust, respect, teamwork at all levels within the company.

 

 4. Effectively communicating and encouraging feedback with our clients, sub-contractors, suppliers and consultants to constantly improve our quality and compliance standards.

 

 5. A professional quality control team involves in everyday production.

 

 

Ringlock Scaffolding Hot dip galvanized construction material

 

 Any interest or questions,welcome to contact us.

 

Any inquiry will be replied within 24 hours.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How many kinds of wheel buckle scaffolding and adjustable wire base and support?
3, the vertical and horizontal spacing of the vertical pole, the horizontal and vertical, the step distance of the bridge should be approved by the erection scheme, is approved by the calculation;4. The vertical and horizontal spacing of the vertical rod can be arranged by 90cm * 90cm, which can meet the requirements of JGJ162-2008 specification and GB50666-2011 specification;
Q:How do I know if I'm anatomically suited to get an industrial/scaffold ear piercing?
goto the piercing shop and ask?
Q:What kind of piercing would you recommend a scaffold piercing in the ears cartlidge or a belly button piercing?
I have both my cartilage and my belly button pierced. I love them both! Cartilage piercing was initially less painful until you had to turn it once a day during cleaning - that hurt a lot. Also, whichever side you get it pierced on - it will hurt SO bad if you sleep on that side. It takes around 8 months to a year to completely heal. Cost was $40. Belly button - It felt like a pinch when I got mine done. Clean this one 2x a day with sea salt soaks. Don't swim until it is completely healed. It takes 6-8 months to completely heal. Cost was $20 on half price piercing day - so it's usually $40.
Q:I need to sell some scaffolding?
Use okorder.com, okorder.com, hope these help.
Q:Does the Scaffold Ear Piercing Show?
you will get your bellybutton pierced or you will get your 2nd ear lobe holes pierced in case you have already got your first ones.. my widespread is the cartilage...I even have my spectacular cartilage pierced and that i like it.. verify you get a small stud nevertheless...you dont wanna seem TOO flashy stable success!!
Q:A 75kg painter stands on a 5.5m long uniform plank resting on a scaffold.?
The mass of the plank on the left side of the scaffold is: M₁ = (20 kg) × (1.5 m) / (5.5 m) = 5.45 kg The distance between the scaffold and the center of mass on the left side is: L₁ = (1.5 m) / 2 = 0.75 m So the torque of the plank on the left side is: T₁ = (5.45 kg)×(0.75 m) = 4 kgm The mass of the plank on the right side of the scaffold is: M₂ = (20 kg) × ((5.5 m) - (1.5 m)) / (5.5 m) = 14.5 kg The distance between the scaffold and the center of mass on the left side is: L₂ = ((5.5 m) - (1.5 m)) / 2 = 2 m So the torque of the plank on the left side is: T₂ = (14.5 kg)×(2 m) = 29 kgm Now, say the painter stands at X meter on the left side from the scaffold, so the torque added on the left side is: T₃ = X × (75 kg) The total torque on the left must be the same as the total torque on the right, so (4 kgm) + X×(75 kg) = (29 kgm) X×(75 kg) = (25 kgm) X = 0.333 m That is the maximum distance the painter can move away from the scaffold, so the distance to the end of the scaffold is: D = (1.5 m) - (0.333 m) = 1.167 m < - - - - - - answer
Q:i want to get a scaffold/industrial piercing, but how long does it take to heal?
2weeks and even about 1 month sorry hope it helps! x33
Q:Is there a way to find out when specific scaffolding is scheduled to come down in New York City?
Well on every building that has construction on it there's a little section that he paper work and permits all over it ( usually at street level) so I'm going to guess if you can obtain the constructions companies phone number from those paper you can call and ask when the scaffolding is coming down.
Q:The amount of bowl buckle scaffolding, know the area of 50000m2, height 6m, how to calculate the number of vertical pole,
The reference 0.6m and 1.0m. cannot be determined for pitch and step (the above number can only be estimated in the absence of drawings)
Q:The difference between bowl buckle scaffold and fastener scaffold
Divided by the size of occlusion(1) open type scaffold: only with the work of the railing and the foot board, no other shelter facilities scaffolding.(2) partially enclosed scaffolding: Scaffolding with an area of less than 30%.(3) semi closed scaffolding: shield area of 30% to 70% of the scaffolding.(4) fully enclosed scaffold: scaffold with full length and full height along the outer side of the scaffold.(5) open type scaffold: scaffolding provided along the periphery of the building.(6) sealing ring type scaffold: scaffolding along the periphery of the building.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range