Ringlock Scaffolding High Quality with high quality made in China

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
300 pc
Supply Capability:
25000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Ringlock Scaffolding High Quality with high quality made in China


Ringlock Scaffolding High Quality with high quality made in China

Ringlock Scaffolding High Quality with high quality made in China

Description

Ringlock scaffolding, also called Modular Scaffolding and Multidirectional Scaffolding, the junction enables quick and easy connection of load bearing items as well as reinforcing parts to each other with an enormous rigidity.

Ringlock scaffolding is the new generation product of cuplock sacffolding.The buckle part is a disc which diameter 133mm,and thickness 10mm. Scaffold vertical is a tube of D48*3.5mm which material is Q235/Q345B. On the vertical welded many disc every specific distance ,there is 8 holes on the disc,used to jonit the posts. On the bottom of vertical post is a base collar used to connect the scaffolding and the ground. Ledger is made by a tube with two wedge welded on the ends separately.

 

Detailed information

Name:

RingLock Scaffold System and Accessories

Category:

Scaffolding System

Material:

Steel (Q235/Q345)

Size:

D48*3.25mm, etc

Surface:

Electro Galvanized, Hot Dipped Galvanized, Painted, Powder Coated

Component: 

Standard, Ledger, Diagonal Brace, Bracket, Base Jack, U Head Jack, Etc.

Application:

Slab Support, Staircase, Stage Plateforms, Bridge Support, Mobile Tower, etc.

Manufacturer:

OEM is Available

Items or goods can be manufactured according to your standards.

 

Advantage

* Good loading capacity

* Easy to assemble and dismantle

* Stable and durable thanks to its structual design & automatic welding quality

 

FAQ

1)Can we provide different size of Frame system Scaffolding as customer need

The answer is Yes, customer can provide the Tec spec to us and Drawing for production.

2)How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:when must you wear safety harnesses on scaffolding?
Both if you are kinda wrong . If said scaffolding has proper bracing and toe board you do not . Is it wise? Maybe. Law ? No
Q:The combination form of bowl buckle type common scaffold?
When erecting pole connecting joints should be staggered, the first layer of the pole using long 1.8m and 3.0m pole staggered arrangement, to have a 3.0m long rod, the top layer with 1.8m and 3.0m two kinds of length of leveling
Q:Specification for bowl buckle scaffold for construction
What does the previous version mean? Once the new version comes out, the previous version is cancelled
Q:What person or place to scaffold?
Scaffolding refers to the construction site for the workers to operate and solve the vertical and horizontal transport and erection of various stents. The general term of the construction industry, refers to the construction site used in the external walls, interior decoration or high level can not be directly construction. Mainly in order to work or work on the construction of the external security network maintenance and installation of high altitude components, etc., is put on the shelf, scaffolding materials are usually made of bamboo, wood, steel or synthetic materials, etc.. Some projects also use scaffolding as a template, in addition to advertising, municipal, transportation, Luqiao, mining and other sectors are widely used.
Q:What is Bakers Scaffolds ? Pl send me picture links if possible..., thx in advance.?
These are pictures of bakers scaffolding..not recommended to staCK OVER TWO HIGH..i WONT DO THAT..FOR THEY ARE NARROW AND POTENTIAL FALLING FROM LEANING ANY DIRECTION INCREASES IMMENSELY WITH HEIGHT..USUALLY FOR INSIDE USE ONLY..NOT OUTSIDE APPLICATIONS..oops sorry for the capitols didnt realize it..
Q:Industrial/ Scaffold Piercing?
Sea salt warm water is the best way to clean it, and the healing time varies from person to person - can be 3 months to 1 year. I have a scaffold too - congrats on the new piercing!
Q:What kind of scaffolding used in engineering construction
Scaffolding has a single floor, double row fastener type steel pipe scaffolding, full fastener type steel pipe scaffolding, steel cantilever fastener type steel pipe scaffolding, full fastener type steel pipe support, etc..
Q:A window washer is standing on a scaffold?
Analyzing the force diagram Forces in the Upward direction:...T1,T2 (tension of the ropes) Forces in the Downward direction...M1g (scaffold), M2g (man) Fnet = 0 T1 + T2 = M1g + M2g Analyzing the moments about the center T1 is nearest man T1(1.51) =M2g(1.51 - 1.28) + T2(1.51) T1 + T2 = (675 + 145)= 820 T1 - T2 = ((675)(1.51 - 1.28))/1.51 = 102.81 sum the two equations 2T1 = 922.81 T1 = 461.5 N T1 + T2 = 820 T2 = 358.6 N
Q:Industrial/Scaffolding piercing.?
yes it is possible. I know people who have done that. But I suggest getting it done at once because it will hurt less in the long run. Getting your cartilage done hurts for about 2 weeks and then get the top part done that is another 2 weeks. So to get it done together it will only hurt for 2 weeks in instead of 4.
Q:can I claim compensation for falling of scaffolding and breaking my arm?
If you can prove that the company was responsible i.e. the scaffolding was not safe, then yes. If it is proved that you ignored instructions, signage preventing your access or training, then no. The company cannot be held responsible for your stupidity, if for example, you decided to climb over a guardrail rather than leave the scaffold at the proper access points. In this case, you would get nowhere with a claim. If the scaffold was missing guardrails where it should have them, then quite rightly the company in charge of the site on which the scaffold is erected is responsible.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range