• Ringlock Scaffolding for Construction with  SGS Qualified CNBM System 1
  • Ringlock Scaffolding for Construction with  SGS Qualified CNBM System 2
  • Ringlock Scaffolding for Construction with  SGS Qualified CNBM System 3
Ringlock Scaffolding for Construction with  SGS Qualified CNBM

Ringlock Scaffolding for Construction with SGS Qualified CNBM

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

  • Quick Details of Ringlock Scaffolding for Construction with  SGS Qualified

  • Type:Fixed

  • Material:Steel

  • Construction Properties:Installation Scaffold

  • Lapping Form:Special-Shaped Scaffolding

  • Framework:Combined Scaffolding

  • Supporting Mode:Projecting Scaffolding

  • Erection Position:External Scaffolding

  • Scaffolding Part Type:Scaffolding Frames

  • Move Method:Horizontal mobile Scaffolding

  • Structural Style:Multi-Pole Scaffolding

  • Materials Standard:Q235, Q345

  • Materials Specification:48.3*3.25mm, 48.3*3.0mm, 48*2.5mm

  • Qualified Certificate:SGS Test Report, ISO9000, Coc

  • Surface Treatment:Hot DIP Galvanized, Power Coated, Electroplated

  • Standard Size:0.5m, 1m, 1.5m, 2m, 2.5m, 3m

  • Ledger Size:0.6m, 0.9m, 1m, 1.2m, 1.5m, 1.8m, 2.0m, 2.5m, 3m

  • Production Ability:10 Tons Per Day

  • Procedure:Cutting, Drilling, Welding, Galvanized, Assembling

  • Export Markets:North America, South America, Southeast Asia, Western Europe

  • Ringlock Scaffolding for Construction with  SGS Qualified CNBM

  • Ringlock Scaffolding for Construction with  SGS Qualified CNBM

  • Ringlock Scaffolding for Construction with  SGS Qualified CNBM


  • Descriptions of Ringlock Scaffolding for Construction with  SGS Qualified

  • Ringlock is a modular scaffold system which can provide major savings in labor costs while meeting the demands for safety, ease of handling and reductions in maintenance.

  •  

  • Ringlock scaffold has the following features:

  • Quick erection: Ringlock scaffold are all pre-measured and just a hammer is required when erection.

  • Versatility: The revolutionary node point- rosette provides up to 8 connections in one plane, allowing the system scaffold highly adaptable for straight as well as curved structures, such as ship yards, power generation stations, petrochemical plants.

  • Low maintenance: The dip galvanized finish will greatly last the life of the products, no paint required, no more rust or corrosion, even they can be stored externally.

  • Safety: The reliable wedge connections prevent ledgers and diagonal braces from any kind of loosening, The rigid, right fit of all connections with concentric derivation of loads guarantees safety even at great heights. Reasonable customer requirement is acceptable


  • The System of Ringlock Scaffolding for Construction with  SGS Qualified

  • Ringlock
    Scaffold
    System
    Standard
    Q345 tube
    48.3*3.25
    ProcedureSizeWeight(kg)SurfaceCertificate

    1.Cutting

    2.Drilling

    3.Plating    cutting

    4.Forming

    5.Welding

    6.Remove welding slag

    7.Galvnize

    8.Surface finish

    9.Assembling

    10.Packing

    11.Logistics
    0.5m2.96HDGSGS ISO EN
    1.0m5.33HDGSGS ISO EN
    1.5m7.73HDGSGS ISO EN
    2.0m10.06HDGSGS ISO EN
    2.5m12.42HDGSGS ISO EN
    3.0m14.78HDGSGS ISO EN
    Ledger
    Q235 tube
    48.3*3.25
    0.73m3.81HDGSGS ISO EN
    1.09m4.93HDGSGS ISO EN
    1.40m6.44HDGSGS ISO EN
    2.07m8.71HDGSGS ISO EN
    2.57m10.64HDGSGS ISO EN
    3.07m12.41HDGSGS ISO EN
    Brace
    Q235 tube
    48.3*2.5
    1.5*2m9.04HDGSGS ISO EN
    2.0*2m10.05HDGSGS ISO EN
    2.5*2m11.42HDGSGS ISO EN
    3.0*2m12.13HDGSGS ISO EN
    Bracket
    Q345 tube
    48.3*3.2
    0.35m4.5HDGSGS ISO EN
    0.75m6.7HDGSGS ISO EN
    1.1m9.9HDGSGS ISO EN
    Plank
    Q235 
    1.5mm
    1.8mm
    0.73m5.1HDGSGS ISO EN
    1.09m6.9HDGSGS ISO EN
    1.4m8.85HDGSGS ISO EN
    2.07m12.11HDGSGS ISO EN
    2.57m15.02HDGSGS ISO EN
    3.07m17.69HDGSGS ISO EN
    base
    collar
    0.16m1.7HDGSGS ISO EN
    0.2m2.1HDGSGS ISO EN
    Toe
    board
    wood
    15*1.5cm
    0.73m2.16anti-fire ISO EN
    1.09m2.98anti-fire ISO EN
    1.57m4.12anti-fire ISO EN
    2.07m5.75anti-fire ISO EN
    2.57m6.88anti-fire ISO EN
    3.07m7.98anti-fire ISO EN
     
  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Q:I'm interested in a scaffold career in the oil rigs in the north sea
Sorry if I'm not serious, but go to Hong Kong as there they do scaffolding made of bamboo and 170 floors high ,2000mtrs above the sea level... Now that is serious...
Q:Which loads are considered in the design of the scaffold
The variable load of the scaffold shall contain the following contents:1) construction load: including the personnel, equipment and materials, etc.;2) wind load.Safety code for construction of steel tubular scaffold with couplers JGJ130-2011
Q:Specification for construction steel pipe scaffolding and construction safety rules?
2, operating conditionsAccording to the engineering characteristics and construction requirements of the scaffolding erection scheme.The shelf position has to clean up the site.On the soft soil foundation has been hardening.
Q:Construction, outdoor double scaffolding a square meter how many meters of steel pipe and how much?
According to the height of their own construction plans, according to the construction area of 1 square root, fasteners ranging from docking fasteners and rotating fasteners, rotating fasteners should be every square of the 3 bar, a detailed look at the old construction workers
Q:The outer hanging scaffold board 12 embedded parts embedded in the crack?
The outer hanging scaffold board 12 embedded parts embedded in the crack, because the outer hanging scaffold embedded generally should be buried in the beam, and checking of the beam.
Q:The construction scheme of high rise and external cantilever scaffold!
Cantilever scaffold erection scheme1, the basis of preparation (omitted)2, engineering survey:This project is the building of electricity production, Handan power supply company, located in the main street and Chaoyang Road Interchange, a total construction area of 17747.8m2, the ground layer ten, partial eleven, annex four, underground two floors, the total height of the building is 44 m, frame structure, the project frame adopts double row cantilever beam pick the scaffold in a layer, five layer nine layer is arranged in the cantilever beam. The scaffold scaffold.
Q:i got my scaffold piercing 4 days ago and it still hurtsit usually doesn't hurt when nothing touches it, but then with the lightest touch of a finger or anything else, it hurts badly.i just cleaned it with h2Ocean and a q-tip and now it hurts really bad. :|should it not be hurting by now? or is this normal.? if its normal.. how long until it heals/stops hurting like a *****. hah
the industrial take over a year to FULLY heal. and it will be for a while.
Q:Salt doesn't really make any different when cleaning infact I think it makes more dried skin to get stick on the bar. My side piercing is fine but the one closest to my eye is painful when pushed or touched I think this is because I accidentally sleep on it without realising. It's red but it has no lump around the piercing is it infected or is it just trying to heal?
The reason why the earring will stick to the skin and dry up because you're using too much salt. Cleaning it with warm sea salt water is the best way to clean your piercing, especially soaking it in a bowl for 5-10 min. Make-up wipes have alcohol in them, which irritates piercings, just stick to salt. H2Ocean is great, it's a little pricey but it has the right salinity and other ingredients essential for healing tissues. It's not infected, it's just irritated because you slept on it. An infection will have pain, lots of swelling, dark yellowish pus, and throbbing. Give it a sea salt soak and the redness and soreness will go away.
Q:What are the functions and requirements of the masonry wall
4, we must attach great importance to a variety of structural measures: scissors, pull nodes, etc. should be set according to requirements.5, the level should be closed: the first step, every step or two, covered with planks or hand foot fence, scaffolding to laying along the long, joints should be overlapped in the small bar, do not appear short board. And in between in the pole and the wall every four steps long laying safety bottom fence.
Q:improper design of formwork and scaffolding, not adequate braces and supports, improper handling, corrosion of material is several factor of formwork and scaffolding failure. it is estimated that more than 3000 accidents involving falls from scaffolds and 30 fatalities
Improper assembly seems to be a big one. Workers often neglect to install the internal diagonal from upper corner to opposite lower corner when it comes to scaffolding. Formwork usually fails by inadequate bracing at the bottom as hydrostatic pressure builds. This can be mitigated to some extent by allowing the concrete to set up a bit before pouring the next layer. For earth formwork, you have to be real careful about expansive clay becoming saturated and overwhelming the bracing as it expands.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords