Ringlock Brace Easy Assembly Top Quality Metal
- Ref Price:
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2 m.t.
- Supply Capability:
- 100000 m.t./month
- OKorder Service Pledge
- Quality Product
- Order Online Tracking
- Timely Delivery
- OKorder Financial Service
- Credit Rating
- Credit Services
- Credit Purchasing
Ringlock Scaffolding
Ringlock is a modular scaffold system which can provide major savings in labor costs while meeting the demands for safety, ease of handling and reductions in maintenance.
Ringlock scaffold has the following features:
1.Quick erection: Ringlock scaffold are all pre-measured and just a hammer is required when erection.
2.Safety: The reliable wedge connections prevent ledgers and diagonal braces from any kind of loosening, The rigid, right fit of all connections with concentric derivation of loads guarantees safety even at great heights.
Main Features of the Ringlock Scaffolding
Place of Origin | Beijing, China (Mainland) |
Product Name: | Ringlock Scaffolding |
Custom Code | 7308400000 |
Color | Silver, golden |
Surface treatment | Painted,Hot-Dip,Galvanized,Electro Galvanized, Powder Coating |
Material | Q235,Q345.etc |
Package | Customized Package |
Payment Terms | T/T,L/C |
Delivery Detail | 15-25 Days |
Quality Control | IS09001 Certification, Quality Test |
Standard | 48.3*3.25*4000mm |
Ledger | 48.3*3.25*3072mm |
Ledger End | 1.2kg |
Advantages
1)To be erected easily and quickly
2)Installed to different angels with rosettes of
two different hole being positioned there
3)Ringlock scaffolding provides complete flexibility to lock in any angel.
4)Diagonal braces are to be tailored in
accordance with the lengths of vertical and horizontal tubes
Specification of Ringlock Scaffolding
The Standards(Verticals) | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
3000 | 3/3.25 | 48 | HDG/Painted | |
2500 | 3/3.25 | 48 | HDG/Painted | |
2000 | 3/3.25 | 48 | HDG/Painted | |
1500 | 3/3.25 | 48 | HDG/Painted | |
1000 | 3/3.25 | 48 | HDG/Painted | |
500 | 3/3.25 | 48 | HDG/Painted | |
The Ledgers(Horizontals) | ||||
Effective Length(mm) | Tube Thickness(mm) | Tube Diameter | Surface Treatment | |
2000 | 3/3.25 | 48 | HDG/Painted | |
1770 | 3/3.25 | 48 | HDG/Painted | |
1000 | 3/3.25 | 48 | HDG/Painted | |
The Diagonal Brace | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
2411 | 3 | 48 | HDG/Painted | |
2244 | 3 | 48 | HDG/Painted | |
The bracket | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
730 | 3 | 48 | HDG/Painted | |
Plank | ||||
Effective Length(mm) | Width(mm) | Height(mm) | Surface Treatme | |
2050 | 480 | 45 | HDG | |
1820 | 480 | 45 | HDG | |
3000 | 240 | 45 | HDG | |
2000 | 240 | 45 | HDG | |
1000 | 240 | 45 | HDG | |
Hollow Head Jack And Jack Base | ||||
Length(mm) | Tube Diameter(mm) | Size of Plate(mm) | Surface Treatment | |
600 | 38 | 150*120*50*4 | HDG | |
600 | 38 | 150*150*4 | HDG |
Accessories
Packing
Inspection
Project
More Photos
- Q:is it possible for me to get an industrial piercing like do i have the right kind of ear shape for it ? or will it look funky and you wont be able to see it ?
- It looks perfect!
- Q:A window washer is standing on a scaffold supported by a vertical rope at each end. The scaffold weighs 210 N and is 3.30 m long. What is the tension in each rope when the 690 N worker stands 2.30 m from one end?______ N (smaller tension)______ N (larger tension)
- assuming the scaffold is uniform weight, take moments around 1 end to get the tension in the rope of the other the ∑M = 0, take the rope tension direction as positive 690 x 2.3 + 210 x (3.3 / 2) = T1 x 3.3 T1 = 586N Now moments around the other end 690 x (3.3-2.3) + 210 x (3.3/2) = T2 x 3.3 T2 = 314N You can check your answers as ∑F = 0, so 586 + 314 - 210 - 690 = 0
- Q:How to allow the height of the bowl - shaped steel tube scaffold
- The risk of a larger segment of the project safety management approach, the fifth set up a height of more than 50m of the floor type steel scaffolding, construction units must organize experts to demonstrate the program.Standard Specification for Standard Specification for bowl buckle steel tubular scaffolding
- Q:Hiya, I just had a scaffold piercing on the 14th of this month.. and everything was fine but in the last couple of days my ear has become a bit swollen and has broke out into spots. The actual piercing is fine, I found some dry blood on the end of the piercing but I dismissed that as nothing. The piercing doesn't hurt at all but its the itching that's getting to me! :(Any advice please, (bear in mind i shall be going to the doctors)Thanks
- You shouldn't need to see the doctor. You may be having a reaction to the jewelry. Doctors are not very knowledgeable about piercings. In fact, most that I've met are quite biased against them. Swelling with a scaffold piercing is normal. Sometimes it takes a few days to take effect. Go to your piercer and let them take a look at it first. If you're wearing surgical steel you may need titanium. Also make sure you're only using sea salt soaks twice a day to keep it clean. No antiseptic cleaners, witch hazel, alcohol, peroxide, antibiotic ointment, most soaps, etc.
- Q:Basically iv had my scaffold for around 2 years, it is completely healed. About six months ago i had to take the single bar out and put two separate bars in, i went to the shop i had it done at and they sold me two clear labret bars, at the time i did not realise that these were much thinner than my normal bar and because after time they became brittle and discoloured i changed them to two metal eyebrow bars as a short term solution, i need some advice on what to do regards changing back to a single scaffold bar, i would like to freely be able to change between a single bar and two bars/hoop, but im sure it would cause too much damage to my ear and too much pain to keep stretching it to a scaffold bar to then let it go down and stretch it again i will be needing a single bar at weekends not in the week, what should i do?
- To return to the bar, you'll need to go to your piercer to have it reinserted using a small taper. Switching it back and forth from a single bar to hoops is absolutely not recommended because the hoops have a curve and will cause the bar to not fit properly because it will change the angle of the piercing, you can use straight barbell studs that are the same gauge as your single bar though without complication.
- Q:im in the midwest
- we bought 9' planks here in AZ. and paid $50.00 each. pressure treated and a bolt thru them, they are $65.00
- Q:Door type steel pipe scaffold, bowl type, plate type, what is the disc pin?
- Fastener steel pipe scaffold, scaffolding, scaffolding, plate type pin type scaffold is currently widely used scaffolding,
- Q:in the safety scaffolding?
- If your talking about jobs, try Gladstone in Queensland or Karratha in WA. Plenty of jobs in safety and scaffolding there. Otherwise I don't know what you mean.
- Q:What are the specifications of the bowl fastener? What kind of?
- Pole commonly used specifications are: LG-300.LG-240.LG-180.LG-150.LG-120.LG-90.LG-60
- Q:I got my scaffolding piercing yesterday (a bar through the cartilage) and when i woke up this morning there was quite a lot of blood, i mean like there was big clumps of it around the holes. I've cleaned it up and it seems to look okay and it isn't any more painful than when i got it done yesterday. Is this normal?Thanks (:
- well when i got my lip pierced idk if this is the same thing but when i woke up the next morning there was blood on my pillow, my face, and running down my neck and now its fine just be sure to clean it every day and it should be fine
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Similar products
New products
Hot products
You Might Also Like