Ring Locked Scaffolding with Saving of Time and Cost

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 m²
Supply Capability:
1000000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.   Structure of Ring-lock Scaffolding

Ring-lock Scaffolding consists of cup-lock connector, post, cross bar, diagonal brace, base and top brace. Safe and convenient to operation, fast to assemble and dismantle, widely used in scaffolding construction, such as formwork scaffold and fitment construction. 

It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.

 

2.   Main Features of Ring-lock Scaffolding

.Each Ring-lock is welded on post every 0.6m. Choose step pitch based on mechanical requirements

.When installing the scaffolding, insert ledger connector into the pole of the cup-lock, then hammer ledger connector to finish fastening

.The more load, the more reliable fasten

.Ring-lock Scaffolding has no special retaining member and no active parts. It’s easy and convenient to operation with integral low costs

 

3.   Ring-lock Scaffolding Images


      


4.   Ring-lock Scaffolding Specification

     .Buckling resistance: 2KN.M when concentrate load on cantilever and 6-9KN.m when evenly distributed load

     .Design load of cross bar




    .Design Lord of base:Pmax=60KN

 

5.   FAQ of Ring-lock Scaffolding

     1) What can we do for you? 

 We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

    .We can provide you the professional design team.    

    .We can provide fashionable and newest styles for you.    

    .We can design the artwork for you.    

    . Please feel free to customize.  

 

   2) What promises can be done by us?

   . If interested in Ring-lock Scaffolding, please feel free to write us for any QUOTE.

   . If printing required, please advise asap because the whole set need much more time to complete.

   . Please DO check goods when courier knocks your door and contact us asap if any issue.

 

  3) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Frame-Connected Scaffolding cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

  4) What about the package and shipping time?

   .Packing:  As Customer's Requirements

   .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

  .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

    Other mass qty of Ring-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days. 


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Bowl buckle type steel pipe scaffold and full fastener type scaffolding are long what kind of
But do not rule out this situation, as the difference between these two scaffolding,
Q:Which ear should I get a industrial/scaffolding piercing on?
Huh, I have mine on my left ear. I suggest getting it on your right ear, you really need to avoid sleeping on it, and trust me, it's really uncomfortable if you do!
Q:Scaffolding Responsibilities ?? Please help ?
Any safety issue should be monitored by all parties involved. It is the Construction Manager's responsibility to MONITOR that his/her subcontractors are following OSHA regulations. If OSHA comes in, they will fine the subcontractor AND the General contractor if they cannot provide documentation that they are holding the subcontractor accountable.
Q:How much is the erection height of double row scaffold
Single row fastener type steel pipe scaffold erection height requirements is 25 meters, double row height doubled, is 50 meters.The single row of cuplok scaffolding height requirements on top, is 30 meters. The same double bowl buckle scaffold is doubled 60 meters.
Q:is it safe to get an industrial/scaffold and weaving piercing at the same time?
It's not SUPER dangerous, but I wouldn't recommend getting them at the same time.
Q:would you consider it homo if someone had a scaffold?
I wouldnt think homo I would think ewwwwww
Q:I have a wrist tatto and my belly peirced, will a scaffold/industrial peircing hurt?
It really wasn't that bad at all. it was one of my first piercings, and I was totally fine. Slight pinch.
Q:in the safety scaffolding?
If your talking about jobs, try Gladstone in Queensland or Karratha in WA. Plenty of jobs in safety and scaffolding there. Otherwise I don't know what you mean.
Q:What are the characteristics of bowl buckle scaffold
Scaffolding function WDJ bowl scaffold to create a joint with a bowl, not only is the ability to have good and reliable mechanics in the three-dimensional direction and strength performance and self locking, convenient disassembly, and is extremely fast and labor-saving. The utility model can completely avoid the scattered nature of the bolt operation, and belongs to a scaffold which can conveniently carry out the combined size and the carrying capacity. Multi function, can according to the construction requirements and the size of different group frame and construction load of single and double scaffolding, supporting frame lifting and climbing the construction equipment, mainly used to construction equipment, building and bridge or the construction of chimney building requirements.
Q:A 75kg painter stands on a 5.5m long uniform plank resting on a scaffold.?
The mass of the plank on the left side of the scaffold is: M₁ = (20 kg) × (1.5 m) / (5.5 m) = 5.45 kg The distance between the scaffold and the center of mass on the left side is: L₁ = (1.5 m) / 2 = 0.75 m So the torque of the plank on the left side is: T₁ = (5.45 kg)×(0.75 m) = 4 kgm The mass of the plank on the right side of the scaffold is: M₂ = (20 kg) × ((5.5 m) - (1.5 m)) / (5.5 m) = 14.5 kg The distance between the scaffold and the center of mass on the left side is: L₂ = ((5.5 m) - (1.5 m)) / 2 = 2 m So the torque of the plank on the left side is: T₂ = (14.5 kg)×(2 m) = 29 kgm Now, say the painter stands at X meter on the left side from the scaffold, so the torque added on the left side is: T₃ = X × (75 kg) The total torque on the left must be the same as the total torque on the right, so (4 kgm) + X×(75 kg) = (29 kgm) X×(75 kg) = (25 kgm) X = 0.333 m That is the maximum distance the painter can move away from the scaffold, so the distance to the end of the scaffold is: D = (1.5 m) - (0.333 m) = 1.167 m < - - - - - - answer

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range