Ring Lock Scaffolding System with High Quality by HDG

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Structure of Ring lock Description 

Ringlock Scaffolding system is the most popular used Scaffolding system in the world.It will greatly reduce the cost because of the following advantages

 

Packaging & Delivery

Packaging Details:

Pallet or bag or upon client's request

Delivery Detail:

35days

 

2.Main Features of Ringlock

 It will greatly reduce the cost because of the following advantages

1)Using less pipes

2)Easy to install

3)It can be used again and again for nearly 20years

 

3.Ring lock product pictures:

   Ring Lock  Scaffolding System with High Quality by HDG

 4.Ringlock Product Description

Type:

ringlock scaffolding diagonal Brace

specification

Ø48.3×3.20

material:

steel Q235

Finished

Hot DIP galvanized, painted

Diagonal length(m)

Weight(kg)

0.9m * 1.25m

6.28

1.25m * 2.7m

11.45

 

 5.FAQ

 We have organized several common questions for our clients,may help you sincerely:

1)How many Scaffolding your company have?

Here comes our 5 types of Scaffolding systems:

- Cup lock Scaffolding(C-Lock Scaffolding)

- Ring lock Scaffolding

-Kwistage Scaffolding

-H-frame Scaffolding

-ID15 Scaffolding Tower, this type Scaffolding is the most widely used in construction, such like bridge.

2)How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Fastener type steel pipe scaffold composed of components
Rotating fasteners, connecting rods, pedals (steel pedals, bamboo pedals can be), the extension of the extension of the galvanized steel pedal easy to use
Q:What are the main safety problems when dismantling the scaffold
3, the demolition of spare parts to be loaded into the container, with a crane hanging; the steel pipe to be tied to secure, double point lifting, prohibited from high altitude thrown.4, more than six wind (including level six) to stop the construction of mobile scaffolding.
Q:What are the problems with having scaffolding piercing in the ear? (pic inside)?
i've not had scaffolding but i've got a wide range of cartilage piercings and they take about 12weeks to heal... i would just say be careful not to catch it and keep it clean. good luck :)
Q:Is it possible to have the scaffold piercing done separately?
Technically yes but it is better to have them done at the same time so the holes are aligned properly. It is better to get them done at the same time, as the second piercing will be less painful because you are all adrenalin-ed up! Probably cheaper too.
Q:Method for inspection of foot hand frame fittings
Should adopt the current national standard "straight welded steel pipe" GBT 13793
Q:Scaffolding steel planks with rubber end caps?
Maybe something like a window washers scafolding planks...?
Q:what happened when author dimmesdale went to the scaffolding in town square?
Which time? The first time he went there at night, admits his sin, mets up with Hester Prynne and Pearl, and an A appears in the sky. The second time, Arthur Dimmesdale reveals this secret to the public. He then has a heart attack on the scaffold and dies.
Q:scaffold piercings? what do you think?
It's not going to hurt 'especially' don't worry. :) xoxox
Q:How badly does getting an industrial/scaffolding piercing hurt?
When I got my industrial, it hurt more after wards. During the first week, it was a pain to sleep. Just make sure you clean it twice a day so it doesn't get infected.
Q:The construction should strengthen the specific meaning of scaffolding and support
In order not to be involved in the whole system due to local errors, the scaffold must be separated from the formwork support, forming a stable system.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range