Ring Lock Scaffolding System for Formwork Shoring Systems

Ref Price:
Loading Port:
Shekou
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t.
Supply Capability:
1000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Introduction:

 

Ring-lock scaffolding consists of cup-lock connector,post,cross bar,diagonal brace,base and top brace.Safe and convenient to operation,fast to assemble and dismantle,widely used in scaffolding construction,such as formwork scaffold and fitment construction.

 

Specifications:

 

 materialQ235,Q345

 tube size48.3*3.2mm 

 surfacinghot-dip galvanized

 the usual size0.5-3m

 

Main Features of the Ring Lock Scaffolding

 

  - Using less pipes

 - Easy to install

 - It can be used again and again for nearly 20years 

 - Easy to storage and transportation 

 - High degree of standardization

 - Easy and quick erection

 - Excellent stability and bearing capacity



Why choose us?

 professional scaffolding manufacturer

 timely delivery

 authorty certification

 one-stop technical support

 decades of years' experience

 strict quality management


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How do I get permission to go on to scaffolding?
You can rent one of your own. Getting all the contractors, owners and subcontractors to let you sign a waver will not get you far ... in the end if you fall off, your survivors will still sue.
Q:Scaffolding and scaffolding, what is the difference
Different materials: scaffolding is mainly used in Q235 carbon steel tube, plate type scaffold is Q345 high strength low alloy structural steel.
Q:would you consider it homo if someone had a scaffold?
I wouldnt think homo I would think ewwwwww
Q:how much does a scaffolding business earn a year?
The amount earnt very much depends on the size of the business, contacts within the industry, membership of industry associations and the country that you are operating in.
Q:I'm thinking about using commercial industrial scaffolding for my next deer stand.?
My dad's been talking about doing this on his property. Might spook the deer at first, so put it up well ahead of time
Q:Scaffolding construction specification is what? Do you know?
Short distance horizontal transportation2, the basic requirements of the scaffold: (1) sufficient strength, stiffness, stability;(2) sufficient area;(3)Safety, high altitude operation requirements;(4)Has the advantages of simple structure, convenient assembly and disassembly; (5) according to local conditions, local materials.
Q:how much does a scaffold/industrial piercing cost?
it really depends on where you get it done i not really good on math but it should only cost 30 or so check around where you live and see go to a local tattooing shop they should do piercings there for cheap and on the pain level i give about a 6 or 7 depending or youre pain tolarance i hope this helps
Q:How to weigh the weight per meter of wrist button scaffold
Heavy 17.07KG. The main component is 48 *, Q235 welded steel pipe
Q:How to hide scaffolding piercing?
Have you got long hair? Tie your hair in a loose ponytail at the bottom of your neck, without putting any hair behind your ears. This is what my friend did for work, it worked for her. The reason you can't wear jewellery in school is 'health and safety', so just having clear balls won't make a difference. Can you get a clear TFT bar as well as balls? that would probably help hide it. Best of luck!
Q:Physics question! A man stands on a scaffold...?
Required conditions for equilibrium (Other wise the scaffold is moving) Sum of forces = 0 Sum of Torques = 0 Sum of Forces Painter: 800 N DOWN Scaffold: 100 N Down Sum of tensions in chains = 800 + 100 = 900 N UP Sum of Torques (Pick one end, it does not matter which. I choose the Left end) Torque = Force * Lever arm Painter is 3.0 meters from Left end Tp = 800 N * 3.00 m = 2,400 N-m CW (Clockwise) Center of gravity is at the center of the scaffold or 4/2 = 2 meters from the Left enf Ts = 100 * 2 = 200 N-m CW This means that the chain on the Right end must supply 2400 + 200 = 2600 N-m CCW Tc = Fc * 4.00 m 2600 = Fc * 4 Fc= 650 N UP Total need up is 900 N====> 900 - 650 = 250 N in Left chain QED

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range