Ring-lock Scaffolding,Stable and Durable

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
3000 pc
Supply Capability:
30000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1. Main Description of Ring-lock Scaffolding:

 

  • Ring-Lock Scaffolding System consists of hot dipped galvanized steel pie and modular components that are assembled together using integral wedge connectors. Ring-Lock system is a modular scaffold system which can provide major saving in labor cost while meeting the demands for safety, ease of handling and reductions in maintenance.

  • Consists of galvanized high-strength steel modular components. It can be used for all forms of access and support structures in the building and construction industries, shipbuilding, offshore construction and industrial maintenance.

  • Components: Ring-Lock Standard With Spigot, Ring-Lock Ledger, Ring-Lock Diagonal, Wedge Pin, Base Collar, Steel Plank, Steel Stair Case.

 

 

2. Main Futures of Ring-lock Scaffolding

 

  • Standard:  Made of 48mm O.D. x 3.2mm thickness high grade steel tube, 1 discal leg 0.5meter, Length: 3000, 2500, 2000, 1500, 1000,  500mm etc.

  • Ledger: Made of 48mm O.D. x 3.2mm thickness high grade steel tube, length800mm/ 1500mm, length can be ordered.

  • Ring: Made from cast-steel or pressed steel.

  • Ledger connection-peg: made from cast-steel.

  • Base screw jack: length 600mmx3.5mm thickness strength tube, length to be order, solid tube available.

  • U head screw jack: length 600mmx3.5mm thickness strength tube with U head plate, length can to be order, solid tube available.

  • Surface: painted/electro (hot dipped) galvanized or to be order.

  • Also can be customized.

 

3. Detailed Pictures about Ring-lock Scaffolding

 

 

Ring-lock Scaffolding,Stable and Durable

 

 

 

Ring-lock Scaffolding,Stable and Durable

 

4. FAQ

 

1) What can we do for you? 

    .We can ensure the quality of the Timber Beam Wall Formwork and avoid extra expenses for customers.    

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your projects.        

 

2) What promises can be done by us?

   . If interested in this kind of formwork, please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issueS.

 

3) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

    .Packing: wood package and adhesive tape

    .Shipping: by sea

     Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs declaration, it may need 2weeks.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Physics question! A man stands on a scaffold...?
Required conditions for equilibrium (Other wise the scaffold is moving) Sum of forces = 0 Sum of Torques = 0 Sum of Forces Painter: 800 N DOWN Scaffold: 100 N Down Sum of tensions in chains = 800 + 100 = 900 N UP Sum of Torques (Pick one end, it does not matter which. I choose the Left end) Torque = Force * Lever arm Painter is 3.0 meters from Left end Tp = 800 N * 3.00 m = 2,400 N-m CW (Clockwise) Center of gravity is at the center of the scaffold or 4/2 = 2 meters from the Left enf Ts = 100 * 2 = 200 N-m CW This means that the chain on the Right end must supply 2400 + 200 = 2600 N-m CCW Tc = Fc * 4.00 m 2600 = Fc * 4 Fc= 650 N UP Total need up is 900 N====> 900 - 650 = 250 N in Left chain QED
Q:I need to sell some scaffolding?
Send me some pics, I may be interested in a few.
Q:Would you get on a window washer scaffold on a skyscraper for $1000 ?
As long as it wasn't a windy day and the weather was mostly sunny and nice and warm. Also I would need all the proper safety gear.
Q:Requirements for the current bowl frame
The vertical distance is the distance between two adjacent vertical bars along the length of the scaffold
Q:Scaffold piercing question..Please help?
Yes, all piercings should be done with a needle. Guns are cattle tagging pieces of poop and are inadequate for any piercing. Everyone has a different pain tolerance but if it's something you really want it'll be worth the pain, and piercings only last for a second and it's done. I imagine it would be quite painful though as it's cartilage which always tends to be a little stingy when being pierced.
Q:Physics Problem - A 56.0kg painter is on a uniform 23.5kg scaffold supported from above by ropes?
lacking information. How lots stress can each and each rope sustain, how lots tilt will the scaffolding undergo by using circulate. you desire to be lacking some information, that question is unanswerable too many variables.
Q:What is the most used type of scaffold in construction industries?
Bamboo is an old version of scaffolding. Now, we used couplers or cuplock system. These scaffoldings are very rigid which you may also use as propped supports for concreting of beams, slabs, columns and retaining walls. These scaffoldings are greatly being used right now in UAE where I am working. Safety wise, the system is being recommended for high rise buildings most specially when you are working along the facase for finishing works.
Q:why is steel used in scaffolding?
The reason is simple.....Bamboo will bend in the event of a typhoon and is thus safer than steel scaffolding.
Q:What kind of piercing would you recommend a scaffold piercing in the ears cartlidge or a belly button piercing?
I have both my cartilage and my belly button pierced. I love them both! Cartilage piercing was initially less painful until you had to turn it once a day during cleaning - that hurt a lot. Also, whichever side you get it pierced on - it will hurt SO bad if you sleep on that side. It takes around 8 months to a year to completely heal. Cost was $40. Belly button - It felt like a pinch when I got mine done. Clean this one 2x a day with sea salt soaks. Don't swim until it is completely healed. It takes 6-8 months to completely heal. Cost was $20 on half price piercing day - so it's usually $40.
Q:Bowl buckle scaffold and fastener type scaffolding
In the 40s of last century, the United Kingdom, more than 50 years of foreign use. After so many years of use, because of the carrying capacity is not easy to control, most of them can only be used as the construction of such a lighter load of the project.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range