• Ring-lock Scaffolding,High Quality Steel,HDG System 1
  • Ring-lock Scaffolding,High Quality Steel,HDG System 2
  • Ring-lock Scaffolding,High Quality Steel,HDG System 3
  • Ring-lock Scaffolding,High Quality Steel,HDG System 4
Ring-lock Scaffolding,High Quality Steel,HDG

Ring-lock Scaffolding,High Quality Steel,HDG

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
2000 pc
Supply Capability:
3000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Main Description of Ring-lock Scaffolding:

 

  • Ring-Lock Scaffolding System consists of hot dipped galvanized steel pie and modular components that are assembled together using integral wedge connectors. Ring-Lock system is a modular scaffold system which can provide major saving in labor cost while meeting the demands for safety, ease of handling and reductions in maintenance.

 

 

2. Main Futures of Ring-lock Scaffolding

 

  • Ledger: Made of 48mm O.D. x 3.2mm thickness high grade steel tube, length800mm/ 1500mm, length can be ordered.

  • Base screw jack: length 600mmx3.5mm thickness strength tube, length to be order, solid tube available.

  • U head screw jack: length 600mmx3.5mm thickness strength tube with U head plate, length can to be order, solid tube available.

  • Surface: painted/electro (hot dipped) galvanized or to be order.

  • Also can be customized.

 

3. Detailed Pictures about Ring-lock Scaffolding

 

 

Ring-lock Scaffolding,High Quality Steel,HDG

 

 Ring-lock Scaffolding,High Quality Steel,HDG

 

4. FAQ

 

  • How to guarantee the quality of the products:

     

    We have established the international advanced quality management system,every link from raw material to final product   we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

 

  • How long can we receive the product after purchase?

 

In the purchase of product within three working days, We will arrange the factory delivery as soon as possible. The percific time of receiving is related to the state and position of customers.Commonly 7 to 10 working days can be served.

    

      What can we do for you? 

    .We can ensure the quality of the Timber Beam Wall Formwork and avoid extra expenses for customers.    

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your projects.        

 

      What promises can be done by us?

   . If interested in this kind of formwork, please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issueS.



Q:What pages are each of the scaffold scenes in quot;The Scarlet Letterquot;? :) thanks
There are obviously different printings of the Scarlet Letter, but I do remember this: 1st: Chp 2 2nd: Chp 12 3rd: Chp 23
Q:I have to write an essay on the use of the scaffold in the novel. The first use is in the beginning when Hester is standing on it for public punishment. The third time is at the end, when Dimmesdale pleads for forgiveness and then dies. I am confused on the second time it is used. Any ideas?
The second time is like the turning point of the novel i believe. I think it was acceptance and purging. Don't they feel better after that? Its the same principle when Dimmesdale goes through the forest and comes out feeling better. Its the beginning of them purging for their sins. I think that the second time could be labeled as confession, actually Because they all meet up and its discovered that Dimmesdale is an adulterer as well. So go with that, confession and purging, haha I read it last year; we totally did an essay on it too. (and i totally aced it! whattt) haha Hope this helps!
Q:Cuplock scaffolding pole bearing capacity in which can be found? Read a lot of calculations are said to check, but also a lot of difference calculated
Do not know if there is no other specification on sized, I only this.The bearing capacity of the value of as manufacturers offer. I have a screenshot for you to see.
Q:How to calculate the cost of scaffolding erection
The majority of bridges and supporting the use of scaffolding is mostly subject construction of gate type scaffold floor scaffold use scaffolding, scaffolding pole of the vertical distance of 1.2-1.8m rail distance is 0.9-1.5m
Q:The bowl buckle scaffold allows the joint to be in a section
This bowl buckle scaffold will be built more stable, reduce the probability of accidents
Q:i'm writting an essay about symbols in the scarlet letter. can you tell me what the scaffold symbolizes or any other symbols. thanks
This Site Might Help You. RE: what does the scaffold symbolize in the scarlet letter? i'm writting an essay about symbols in the scarlet letter. can you tell me what the scaffold symbolizes or any other symbols. thanks
Q:Requirements for the current bowl frame. What is the vertical distance, the horizontal distance and the step distance
The specification of bowl buckle frame is JGJ 166-2008 "safety technical specification for construction of bowl buckle scaffold"
Q:What are the specifications of the bowl fastener? What kind of?
Bowl buckle bracket. Divided into horizontal and vertical rod.Crossbar common specifications are: HG-60.HG-90.HG-120.HG-150
Q:What are the main types of bowl buckle scaffold
Scaffolding is used to build houses, built in the periphery to the workers up and down
Q:A window washer is standing on a scaffold supported by a vertical rope at each end. The scaffold weighs 210 N and is 3.30 m long. What is the tension in each rope when the 690 N worker stands 2.30 m from one end?______ N (smaller tension)______ N (larger tension)
assuming the scaffold is uniform weight, take moments around 1 end to get the tension in the rope of the other the ∑M = 0, take the rope tension direction as positive 690 x 2.3 + 210 x (3.3 / 2) = T1 x 3.3 T1 = 586N Now moments around the other end 690 x (3.3-2.3) + 210 x (3.3/2) = T2 x 3.3 T2 = 314N You can check your answers as ∑F = 0, so 586 + 314 - 210 - 690 = 0

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords