Ring-lock Scaffolding for Slab Formwork System,Easy Maintenance

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
2000 pc
Supply Capability:
300000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1. Main Description of Ring-lock Scaffolding:

 

  • Ring-Lock Scaffolding System consists of hot dipped galvanized steel pie and modular components that are assembled together using integral wedge connectors. Ring-Lock system is a modular scaffold system which can provide major saving in labor cost while meeting the demands for safety, ease of handling and reductions in maintenance.

  • Low maintenance: The dip galvanized finish will greatly extend the life of the product, no paint required, no more rust or corrosion, even they can be stored externally.

  • Components: Ring-Lock Standard With Spigot, Ring-Lock Ledger, Ring-Lock Diagonal, Wedge Pin, Base Collar, Steel Plank, Steel Stair Case.

 

 

2. Main Futures of Ring-lock Scaffolding

 

  • Standard:  Made of 48mm O.D. x 3.2mm thickness high grade steel tube, 1 discal leg 0.5meter, Length: 3000, 2500, 2000, 1500, 1000,  500mm etc.

  • Ledger: Made of 48mm O.D. x 3.2mm thickness high grade steel tube, length800mm/ 1500mm, length can be ordered.

  • Ring: Made from cast-steel or pressed steel.

  • Ledger connection-peg: made from cast-steel.

  • Base screw jack: length 600mmx3.5mm thickness strength tube, length to be order, solid tube available.

  • U head screw jack: length 600mmx3.5mm thickness strength tube with U head plate, length can to be order, solid tube available.

  • Surface: painted/electro (hot dipped) galvanized or to be order.

  • Also can be customized.

 

3. Detailed Pictures about Ring-lock Scaffolding

 

 

Ring-lock Scaffolding for Slab Formwork System,Easy Maintenance

 

Ring-lock Scaffolding for Slab Formwork System,Easy Maintenance

  

 

 

4. FAQ

 

1) How to guarantee the quality of the products:

    We have established the international advanced quality management system,every link from raw material to final product           we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will     provide necessary follow-up service assurance.


2) What promises can be done by us?

   . If interested in this kind of formwork, please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issueS.

 

3) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

    .Packing: wood package and adhesive tape

    .Shipping: by sea

     Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs declaration, it may need 2weeks.

 


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the difference between the new type of scaffold and the scaffold?
2, convenient operation: the connection frame, a self-locking capability, flexible assembly and disassembly is simple and easy to master workers, pitched, demolition work efficiency than the bowl type multifunctional scaffold fastener is three times, 20 times higher.3, reduce costs: the same conditions of large space three-dimensional scaffold, the new building quick dismantling scaffold material consumption than the bowl buckle type multifunctional scaffolding less, with the specification of a single bar weight than the bowl buckle type multifunctional scaffolding light.4, saving materials: the most suitable for the new type of formwork keel early demolition, through early demolition can save a lot of keel, formwork and support rod, saving about 30%.
Q:At what height do we need to erect scaffolding?
Any height you can fall from and get hurt. I would say this would be above say 6 feet or so. Scaffolding is cheap. You can rent it around here for $14 for two weeks.
Q:Help!!! what are 3 significances of the scaffold in the Scarlet letter!!! i need help!!!?
just okorder.com i had to read that book, i hated it.
Q:What is the purpose of the scaffold in The Scarlet Letter?
The scaffold is the only place where Hester, Dimmesdale and Pearl are together in the town. The first is when Hester is being interrogated by Dimmesdale, the second is at night when they meet him, and the third is at the end of the book. The Scaffold is used by Hawthorne just like it would be in real life, to bring a crime to the public, just as it does in the book. Not sure about philosophical truths, nothing like that I could think of at the moment.
Q:Why do so many buildings in Manhattan have scaffolding on the street level?
the buildings are probably worn out and need renovations the scaffoldings there so some1 doesnt get injured its the same here in queens, nyc anywhere i walk, those are there lol theres are 3 being renovated around where i live
Q:How many kinds of wheel buckle scaffolding and adjustable wire base and support?
3, the vertical and horizontal spacing of the vertical pole, the horizontal and vertical, the step distance of the bridge should be approved by the erection scheme, is approved by the calculation;4. The vertical and horizontal spacing of the vertical rod can be arranged by 90cm * 90cm, which can meet the requirements of JGJ162-2008 specification and GB50666-2011 specification;
Q:Bowl buckle scaffold is not a pipe fitting scaffold
The steel pipe scaffold is mainly used to connect the steel pipe, the specific method is different.
Q:Can you shorten the steps of the bowl buckle scaffold
It can not be used when erecting the 180 step, must be carried out by 120 step distance control, set up close to the bottom plate beam always available for 60 or 90 bars and the adjustable bracket is adjusted.
Q:Is there a way to find out when specific scaffolding is scheduled to come down in New York City?
Well on every building that has construction on it there's a little section that he paper work and permits all over it ( usually at street level) so I'm going to guess if you can obtain the constructions companies phone number from those paper you can call and ask when the scaffolding is coming down.
Q:for how long must hester prynne stand on the scaffold ? The Scarlet letter a?
I don't know, but you know who does probably know? Nathaniel Hawthorne. Why don't you read that book he wrote, the scarlett letter. The answers probably in there.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range