Ring-lock Scaffolding,Best Performance,Large Bearing Capacity and Stable

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
2000 pc
Supply Capability:
3000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1. Main Description of Ring-lock Scaffolding:

 

  • Name: Ring Lock Scaffolding.

  • Category: Scaffolding system.

  • Material: Steel (Q235/Q345).

  • Size: D48.3*500/1000/1500/2000/2500/3000/4000.

  • Surface: Electro Galvanized/Self Color/Painted/HDG.

  • Component: Standard, base collar, ledger, diagonal brace end, ledger end, ring, connector, guard rail, etc.

  • Application: Highways/Subways, Bridges, Tunnels and Fire Electrical Engineering, Marine Engineering.

  • Advantage:  Durable, Stable, Skid-proof, Antirust, Easy to assemble & Dismantle.

  • Components: Ring-Lock Standard With Spigot, Ring-Lock Ledger, Ring-Lock Diagonal, Wedge Pin, Base Collar, Steel Plank, Steel Stair Case.

 

 

2. Main Futures of Ring-lock Scaffolding

 

  • Standard:  Made of 48mm O.D. x 3.2mm thickness high grade steel tube, 1 discal leg 0.5meter, Length: 3000, 2500, 2000, 1500, 1000,  500mm etc.

  • Ledger: Made of 48mm O.D. x 3.2mm thickness high grade steel tube, length800mm/ 1500mm, length can be ordered.

  • Quick erection: All Ringlock scaffold are pre-measured and just a hammer is required when erection.

  • Versatility: The revolutionary node point-rosette provides up to 8 connections in one plate, allowing the system scaffoldhighly adaptable for both straight and curved strucyures. such as ship yards.

  • Power generation stations, petrochemical plants.

  • Base screw jack: length 600mmx3.5mm thickness strength tube, length to be order, solid tube available.

  • U head screw jack: length 600mmx3.5mm thickness strength tube with U head plate, length can to be order, solid tube available.

  • Surface: painted/electro (hot dipped) galvanized or to be order.

  • Also can be customized.

 

3. Detailed Pictures about Ring-lock Scaffolding

 

Ring-lock Scaffolding,Best Performance,Large Bearing Capacity and Stable

 

Ring-lock Scaffolding,Best Performance,Large Bearing Capacity and Stable

 

 

4. FAQ

 

1) What can we do for you? 

    .We can ensure the quality of the Timber Beam Wall Formwork and avoid extra expenses for customers.    

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your projects.        

 

2) What promises can be done by us?

   . If interested in this kind of formwork, please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issueS.

 

3) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

    .Packing: wood package and adhesive tape

    .Shipping: by sea

     Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs declaration, it may need 2weeks.

 


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Physics question! A man stands on a scaffold...?
Required conditions for equilibrium (Other wise the scaffold is moving) Sum of forces = 0 Sum of Torques = 0 Sum of Forces Painter: 800 N DOWN Scaffold: 100 N Down Sum of tensions in chains = 800 + 100 = 900 N UP Sum of Torques (Pick one end, it does not matter which. I choose the Left end) Torque = Force * Lever arm Painter is 3.0 meters from Left end Tp = 800 N * 3.00 m = 2,400 N-m CW (Clockwise) Center of gravity is at the center of the scaffold or 4/2 = 2 meters from the Left enf Ts = 100 * 2 = 200 N-m CW This means that the chain on the Right end must supply 2400 + 200 = 2600 N-m CCW Tc = Fc * 4.00 m 2600 = Fc * 4 Fc= 650 N UP Total need up is 900 N====> 900 - 650 = 250 N in Left chain QED
Q:Requirements for the current bowl frame
The vertical rod spacing is the vertical distance between the scaffold and the bent frame, which is the center distance between two adjacent vertical bars.Refers to the distance between the upper horizontal bar of the frame, that is, the distance between the upper and lower horizontal bars
Q:Do we need to wear Safety harness if we need to climb approved scaffolding platforms in construction industry?
Navy blue feathers.
Q:What is a new type of scaffolding?
principleSocket type steel pipe scaffold with novel and beautiful, solid plug and socket welding steel as the connecting piece, Q235 steel shots component, the vertical rod is in a certain length of the rigid pipe at regular intervals on a socket welding (as shown below, the top structure) with 57 cylinder connecting rod. The cross bar is welded at the two ends of the steel pipe. The vertical rod is a vertical force member, and is composed of a horizontal rod and a tie. Connection point of the support, can withstand the bending moment, shear and torque, so as to form a space support structure is good overall stability.
Q:rental of Hydraulic scaffolding?
your best thing to do is to look up in the phone book or Internet. there are lots of different companies that rent out lifts. Depending on where you live. I know of a few nationwide ones, Hertz for one. Just call the company and tell them you need a lift. if the work is to be done outside I would use a small boom lift, but if it needs to be done inside just a regular platform lift should do the job. they also come in gas, and electric but being that you only need one to reach 16 ft. you probably only need an electric, just be sure to charge it over night when you are not using it! You will probably have to make a credit card deposit also.
Q:What kind of piercing would you recommend a scaffold piercing in the ears cartlidge or a belly button piercing?
I have both my cartilage and my belly button pierced. I love them both! Cartilage piercing was initially less painful until you had to turn it once a day during cleaning - that hurt a lot. Also, whichever side you get it pierced on - it will hurt SO bad if you sleep on that side. It takes around 8 months to a year to completely heal. Cost was $40. Belly button - It felt like a pinch when I got mine done. Clean this one 2x a day with sea salt soaks. Don't swim until it is completely healed. It takes 6-8 months to completely heal. Cost was $20 on half price piercing day - so it's usually $40.
Q:massless scaffold is held up by a wire at each end. The scaffold is 12m long. A 300-N box sits 4.0 m from the?
And you asked this physics question in the math section of answers because? Let Tl and Tr be the tensions in the left and right wires. We are told the weight of the box is W and that the scaffold is weightless.
Q:How much does industrial or scaffolding peircing hurt?
For me, I'd rate it's pain level at about a 5. Just all depends on how well you tolerate. It's more uncomfortable than getting a lobe piercing, really not that similar. Mine took about about 6-8 months to heal for changing the jewelry, but took like maybe 2-3 months until I was able to sleep on it again. Good luck if you get it.
Q:Door type steel pipe scaffold, bowl type, plate type, what is the disc pin?
Fastener steel pipe scaffold, scaffolding, scaffolding, plate type pin type scaffold is currently widely used scaffolding,
Q:Specification for bowl scaffold support rod top length of not more than 30cm
Bowl-scaffold top support rod free length of not more than 30cm, this is right, really did not see the specification

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range