Ring-lock Scaffolding,Best Performance,Easy Maintenance,Competitive Prices

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
2500 pc
Supply Capability:
3000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1. Main Description of Ring-lock Scaffolding:

 

  • Name: Ring Lock Scaffolding.

  • Category: Scaffolding system.

  • Material: Steel (Q235/Q345).

  • Size: D48.3*500/1000/1500/2000/2500/3000/4000.

  • Surface: Electro Galvanized/Self Color/Painted/HDG.

  • Component: Standard, base collar, ledger, diagonal brace end, ledger end, ring, connector, guard rail, etc.

  • Application: Highways/Subways, Bridges, Tunnels and Fire Electrical Engineering, Marine Engineering.

  • Advantage:  Durable, Stable, Skid-proof, Antirust, Easy to assemble & Dismantle.

  • Components: Ring-Lock Standard With Spigot, Ring-Lock Ledger, Ring-Lock Diagonal, Wedge Pin, Base Collar, Steel Plank, Steel Stair Case.

 

 

2. Main Futures of Ring-lock Scaffolding


  • Ledger: Made of 48mm O.D. x 3.2mm thickness high grade steel tube, length800mm/ 1500mm, length can be ordered.

  • Ring: Made from cast-steel or pressed steel.

  • Ledger connection-peg: made from cast-steel.

  • Base screw jack: length 600mmx3.5mm thickness strength tube, length to be order, solid tube available.

  • U head screw jack: length 600mmx3.5mm thickness strength tube with U head plate, length can to be order, solid tube available.

  • Surface: painted/electro (hot dipped) galvanized or to be order.

  • Also can be customized.

 

3. Detailed Pictures about Ring-lock Scaffolding

 

 Ring-lock Scaffolding,Best Performance,Easy Maintenance,Competitive Prices

 

Ring-lock Scaffolding,Best Performance,Easy Maintenance,Competitive Prices

 

 

4. FAQ

 

1) What can we do for you? 

    .We can ensure the quality of the Timber Beam Wall Formwork and avoid extra expenses for customers.    

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your projects.        

 

2) What promises can be done by us?

   . If interested in this kind of formwork, please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issueS.

 

3) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

    .Packing: wood package and adhesive tape

    .Shipping: by sea

     Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs declaration, it may need 2weeks.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Industrial/Scaffolding,Tragus or cartilage piercing?
Industrial takes the longest to heal, cartilage and tragus are pretty similar but infection/complications are more common in tragus piercings as they are knocked a lot by hair and headphones etc. They all hurt the same amount, unless you get your cartilage done with a gun, in which case it's much less painful (but more risk of your cartilage cracking, which is pretty painful in the long term). Industrials are usually done as two cartilage piercings with two bars, then the long bar is put in after they've healed. You should expect some discomfort and scarring around the piercing holes for quite a while afterwards. Tragus piercings often give you problems as the area is near to ear wax which contains all sorts of debris and dust ect. Most cartilage piercings should heal fine and be pretty low maintenance, and there are lots of varieties. If you want something unusual, google a 'rook' piercing.
Q:Muslim scaffolding question for dbq? Please help.?
It seems like he is describing them like he respects them. He is idolizing their humility and pride. Is DBQ a Document Based Question? just wondering, if you are in APH, good luck! :) Addition: I found your post responding to this one. lol Hopefully this helped! I remember those DBQs, kinda a pain. lol....but it was a fun class and it is well worth taking!
Q:What is a new type of scaffolding?
The main advantage of the new type of scaffolding scaffolding is quick dismantling.Socket type plate type steel pipe scaffold is composed of a vertical rod, a horizontal rod and a diagonal rod, adjustable base and adjustable bracket and other parts constitute. The vertical rod sleeve or connecting rod socket connection, horizontal rod and an inclined rod buckle connector into the connecting plate by the rod side, quick connection with wedge bolt, steel frame structure form a geometric invariant system (referred to as the speed up, frame) according to its use can be divided into two types of scaffolding and formwork support.
Q:What kind of piercing would you recommend a scaffold piercing in the ears cartlidge or a belly button piercing?
I have both my cartilage and my belly button pierced. I love them both! Cartilage piercing was initially less painful until you had to turn it once a day during cleaning - that hurt a lot. Also, whichever side you get it pierced on - it will hurt SO bad if you sleep on that side. It takes around 8 months to a year to completely heal. Cost was $40. Belly button - It felt like a pinch when I got mine done. Clean this one 2x a day with sea salt soaks. Don't swim until it is completely healed. It takes 6-8 months to completely heal. Cost was $20 on half price piercing day - so it's usually $40.
Q:is it safe to get an industrial/scaffold and weaving piercing at the same time?
It's not SUPER dangerous, but I wouldn't recommend getting them at the same time.
Q:(1)Why do we paint building and steel.(2)what are coarse and aggregate.(3)what are formwork and scaffolding.?
1. ) We really need to paint building and steel to prevent from rust, by then it will help the structure to last long..We all know that rust is one of the problem that loosen the strenght of steel.. 2.) Construction aggregate, or simply aggregate, is a broad category of coarse particulate material used in construction, including sand, gravel, crushed stone, slag, and recycled concrete. Aggregates are a component of composite materials such as concrete and asphalt concrete; the aggregate serves as reinforcement to add strength to the overall composite material.
Q:Is there a such thing as a scaffold fracture?
Are you sure you didn't mean to say Scaphoid Fracture. The scaphoid process is a projection coming from your Scapula(shoulder Blade), that connects with the clavicle( )and humerus(arm). Hope this helps thanks.
Q:How to help a scaffold piercing heal?
your body wont reject it cuz its cartilage and it wont reject. its just sore becuase you just go a while ago so it will hurt of a couple of weeks
Q:Scaffold piercing question please help, is it normal?
Gosh Industrial do harm I'm now not going to lie. Cartilage piercings do not harm. But industrials are quite tough to handle. If you'll be able to manage affliction then get it. They're valued at it however they do harm.
Q:A 75kg painter stands on a 5.5m long uniform plank resting on a scaffold.?
The mass of the plank on the left side of the scaffold is: M₁ = (20 kg) × (1.5 m) / (5.5 m) = 5.45 kg The distance between the scaffold and the center of mass on the left side is: L₁ = (1.5 m) / 2 = 0.75 m So the torque of the plank on the left side is: T₁ = (5.45 kg)×(0.75 m) = 4 kgm The mass of the plank on the right side of the scaffold is: M₂ = (20 kg) × ((5.5 m) - (1.5 m)) / (5.5 m) = 14.5 kg The distance between the scaffold and the center of mass on the left side is: L₂ = ((5.5 m) - (1.5 m)) / 2 = 2 m So the torque of the plank on the left side is: T₂ = (14.5 kg)×(2 m) = 29 kgm Now, say the painter stands at X meter on the left side from the scaffold, so the torque added on the left side is: T₃ = X × (75 kg) The total torque on the left must be the same as the total torque on the right, so (4 kgm) + X×(75 kg) = (29 kgm) X×(75 kg) = (25 kgm) X = 0.333 m That is the maximum distance the painter can move away from the scaffold, so the distance to the end of the scaffold is: D = (1.5 m) - (0.333 m) = 1.167 m < - - - - - - answer

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range