• Removable Folding Window or door Manufactory System 1
  • Removable Folding Window or door Manufactory System 2
  • Removable Folding Window or door Manufactory System 3
  • Removable Folding Window or door Manufactory System 4
Removable Folding Window or door Manufactory

Removable Folding Window or door Manufactory

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
5000 set
Supply Capability:
20000 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Introduction of Removable Folding Window or door


The latest in European styling, the Screen Solutions Plisse is the newest and most innovative retractable screen designavailable. So simple to install that almost anyone can do it in as little ashalf an hour.
This elegant, stylish, pleated screen is unlikeany other screen on the market. This unique product has low-profile bottomglide is making it ideal for any locations. You can leave the screen in anyposition without any spring action and will stay in that position till you moveit.


Avaiable Size for Removable Folding Window or door

Single door width: 800-1500mm Height: 1900-2700mm
Double Door width: 1600-3000mm Height: 1900-2700mm
Other special size could be also available


Advantage for Removable Folding Window or door

▪The mesh cassette could be removable then easy to clean and when damage the mesh, each to change the new mesh.

▪(6063-T5) aluminum alloy outline border. Hardness ≥12.

Environmental no-lead process surface, thickness ≥1.0.

Anti-friction, spring folding net, PET and terylene are optional.

▪Anti-friction and anti-striction draw cord, with special process.

▪Advanced adhesion machine, first-class adhesion technique.

▪Super anti-friction rivet, can stand up to 100,000 times friction.

▪Super amphiphobic process makes a complementary (e.g bulge and concave) structure.


Removable Folding Window or door Manufactory

▪Super loeophobic performance after super amphiphobic process

Removable Folding Window or door Manufactory

▪Super dewatering performance after super amphiphobic process

Removable Folding Window or door Manufactory


Q:How to learn metal doors and windows by looking at the map
The most important thing is that you are familiar with profiles, as long as you are familiar with a variety of profiles, that is, do not look at the map can also clear a variety of doors and windows
Q:What is the amount of metal blinds?
Such as the use of electric systems can be linked with the fire control center, as an automatic smoke exhaust gate.
Q:Metal screens can be used how to stick ah.
1. Use dry cloth or sandpaper will be followed by the surface of the dust, oil, rust, etc. to remove, and then acetone or trichlorethylene and other cleaning agents to clean the surface to clean. (A: B = 2: 1); in order to ensure the use of the effect, but also pumping a vacuum and then use the same, in order to ensure the use of the effect, The 3. Note that the use of time must be used within the run out, or will be solidified, resulting in waste of material, 24 hours after the maximum strength. 4. After coating at room temperature 2 to 6 hours curing 40 degrees to 50 degrees 1 to 3 hours curing; glue 24 hours after use; ten days after the sticky better. Cold and wet days, need 15 to 25 degrees room temperature bonding as well. 5. Adhesive face. After pouring the surface. After the glue must be sticky paper stickers. Or 502 glue positioning. Epoxy Resin Adhesive Epoxy Resin AB is made of epoxy resin based two-component high temperature adhesive, mainly for high temperature metal, ceramic and other adhesive. The use of temperature operating temperature of -50 ~ + 180 ℃, short-term up to +250 ℃.
Q:What is the difference between the external wall and the door and the wall? Feeling the same ah
The use of building natural grounding device for grounding, grounding resistance requirements are the same.
Q:Do metal doors and windows project, do a more convenient, want to know the process and time
Metal doors and windows engineering contractor qualification is divided into one, two, three. The qualification of new enterprises can only be reported from the third level. Three qualification standards: 1, the company nearly two years to undertake the following three items in more than two metal doors and windows construction, project quality qualified. (1) metal doors and windows of buildings of 6 or more buildings; (2) area of ??1000 square meters above the metal doors and windows works; (3) single contract amount of more than 1 million yuan of metal doors and windows works. 2, business managers with more than 2 years of project management experience; technical person in charge with more than 5 years engaged in metal doors and windows construction technology management experience and has the relevant professional intermediate titles; financial executives with intermediate or above accounting titles. Enterprises with titles of engineering and economic management of not less than 8 people, including engineering and technical personnel of not less than 5 people; engineering and technical personnel, with more than mid-level titles of not less than 3 people. Enterprises with three qualifications above the project manager of not less than 3 people. 3, the registered capital of more than 100 million enterprises, corporate net assets of more than 1.2 million. 4, the enterprise nearly two years the highest annual settlement income of more than 3 million yuan. 5, the enterprise has a metal doors and windows processing, production of the plant area of ??not less than 500 square meters, and a matching processing, production, installation equipment and testing equipment.
Q:Construction general contracting special qualification can contract metal doors and windows project?
of course can. Curtain wall works depends on the qualifications there is no. Yes, too.
Q:Metal doors and windows project what acceptance criteria
Metal doors and windows project, first check the number, must be checked by Tang.
Q:Less than three months of pregnancy are all wood furniture processing plants, as well as metal doors and windows processing plant will affect the tire
Factory and then so close to Nigeria, adult immunity is strong, and pregnant women because of weak immunity, to pay special attention, you better still away from this environment.
Q:Non-metallic windows, how to prevent the side of the mine
Lightning can only be on the building of metal objects on the lightning induction, as long as the indoor and outdoor metal objects (metal windows, doors, railings, color steel roof, indoor metal equipment, etc.) connected with the ground line on the line, so the plastic windows do not Need to do equipotential bonding.
Q:High-rise commercial housing metal doors and windows how to leave the ground? And can not be steel out of the wall paint what are the brush. Most of the balcony of the metal railings are not received
Metal doors and windows are connected with the pressure ring is cast in the shear wall before the embedded and done. Rework now is not an ordinary loss.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords