• QY20G.5,TRUCK CRANE, BEST PRICE AND GOOD QUALITY System 1
QY20G.5,TRUCK CRANE, BEST PRICE AND GOOD QUALITY

QY20G.5,TRUCK CRANE, BEST PRICE AND GOOD QUALITY

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
10 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Dimension

Unit

QY20G.5

Overall length

mm

12400

Overall width

mm

2500

Overall height

mm

3320

Weight

 

 

Total weight in travel

kg

26020

Front axle load

kg

6900

Rear axle load

kg

19120

Power

 

 

Engine model

 

 SC8DK260Q3  WD615.327

Engine rated power

kW/(r/min)

 192/2200    198/2200

Engine rated torque

N.m/(r/min)

 1100/1400      1150/1400

Travel

 

 

Max. travel speed

km/h

75

Min. turning diameter

m

20

Min. ground clearance

mm

275

Approach angle

°

16

Departure angle

°

13

Max. grade ability

%

24

Fuel consumption for 100km

L

≈35

Main performance

 

 

Max. rated total lifting capacity

t

20

Min. rated working radius

mm

3000

Turning radius at turntable tail

m

3.385

Max. lifting torque

kN.m

860

Base boom

m

10.06

Fully extended boom

m

32.76

Fully extended boom+jib

m

42.12

Longitudinal outrigger span

m

4.97

Lateral outrigger span

m

5.4

Working speed

 

 

Boom luffing time

s

75

Boom full extension time

s

95

Max. swing speed

r/min

3

Max. speed of main winch (single rope)

m/min

100

Max. speed of aux. winch (single rope)

m/min

100

 

More excellent performance
• The optimizing layout of the machine makes the stress of the main bearing carriers more reasonable, and the lifting performance is higher than the products with the same tonnage.
• Apply the mature jib technique which integrates plug-in boom head, embedded boom block, and special telescoping mechanism, which makes the jib more stable and reliable.
• Optimize the stress design. Adopt the box-type outriggers which have larger span, stronger rigidity, and better stability.
More reliable quality
• Adopt the classic K series jib telescoping technique, working safer and more reliable.
• Make the most complete safety device system in the industry, ensuring the lifting safer and more reliable.
• The comprehensively upgraded brake system adopts double circuit air pressure design. Multiple systems ensure the brake safety of the truck during travel.
• The intensity and rigidity of the rotary table and frame structure with high rigidity are completely coordinated.
• The perfect integration of the design and structure realizes the automation of welding, which is more reliable.
Easier to maintain
• The optimizing design of the pipeline traces makes the layout more scientific and reasonable, greatly reducing the dismantling and installing time of the pipelines and the maintenance expense.
• Completely upgrade the electrical system. Adopt anti-creep connector clips, greatly prolonging the service life of the parts.
• Adopt K series rope anti-disorder technique, improving the lifting efficiency, reducing the labor intensity, and prolonging the service life of the steel rope.
• The telescoping steel wire rope oriented and protective device avoids the steel wire rope out of the track and broken.
More energy-efficient and environmental friendly
• Adopt double industrial automation control engine, featuring strong power and energy efficiency.
• Under the economical mode, it can meet the engine power requirement of the normal lifting work. Under the high power mode, it can meet the requirement of the high challenge and high efficient lifting work.
• Adopt the advanced matching technique, which makes the design more scientific. It can reduce the consumption of the mechanism, prolong the service life of the machine, and has high residual value.

Q:I am a manufacturing engineering technology and a mechanical engineering double major and am wanting to know how I can go about designing and building automobiles, ships, or heavy construction machinery. What kinds of companies should I be looking at? and what qualifications should I be shooting for?
No individual can design and build automobiles, ships, or construction machinery. You can be a specialised member of a team to design parts of automobiles, ships, or construction machinery.
Q:For example: Humans vs. Artificial humans (robots)
Heres a few I could think of. Salmon vs Hydroelectric dam Barnacles vs Boat Weathering and Erosion vs Road Rust vs Car
Q:then who will pick it?
then we will bring back slavery for all the illegal immigrants... i said ILLEGAL immigrants...
Q:How can I work my biceps without machinery or equipment?
Simple. Clasp your palms together and begin with your arms straight. Then slowly curl one arm, flexing at the elbow while resisting with the other arm. You'll be doing concentric (positive) training the biceps of one while doing eccentric (negative) training of the triceps of the other arm. Do that until the muscle burns and you cannot flex any more. Good luck and good health!! ?
Q:How do you define host-cell machinery?
That phrase is used when discussing viruses. A virus lacks the ability to construct proteins from the nucleic acid instructions within it (that process is called translation). The host cell the virus invades does have the molecular components/organelles (machinery is an analogy) for translation.
Q:How long is MOS school for a mechanic in the Marines? Heavy machinery?
In the 80's, most mechanic MOS training was self paced with a 6-8 week standard. It may be different now. The reason being, the Marines want to make sure you grasp what you are training for. If it takes a little more time for some it will be worth it to have a well trained devil dog.
Q:Hi, could someone explain what are the basic machinery and process required for mining and processing coal?.Something that would support a lower capital investment as opposed to what big multinationals can afford.Even your business ideas on mining is welcomed.thank you
Strip mining? underground mining: drift or shaft? Horizontal seams or vertical seams? The nature of the coal deposit is a major factor. As is host nation mining laws, carbon content, seam height etc. I would need more data to give you a comprehensive answer as there are many types of coal mining operations. It was done for years with a pick axe and bucket--someplaces it still is. Today where long wall mining is the most efficient. Some are using robots to go back over coal mined 100 years ago to remove gangue/non coal content.
Q:can we as humans learn how to fly without any type of machinery?
Yes. But the mental discipline would be very hard to maintain.
Q:I want Civil construction machineries manufactures list
you want companies around the world or companies located in india?
Q:Question about jounal entry Purchased a machinery I have to affect this entry on purchase a/c as well as fixed assets also I want to take tax set off, How can I ?suppose I pass purchase entryParty / Purchase Dr. (Creditor)To Machinery Net 4% cr.(Purchase)To Vat 4% cr.(Duties Taxes) Fixed asset machinery Machinery a/c dr. (fixed assets)To party/ or purchase or what ?
Well you are not very clear with yoUr question , you need to be clear about what you are trying to do, Did you receive an invoice for the fixed asset or the payment has already been made ? answer would depend on the situation: Although i think the main entry you are after is DR Fixed assets ( machinery) DR VAT paid- (assuming Ur sub ledger doesn't pick up any VAT) CR Trade creditors see the above entry when ur paid first and purchases the machinery in last month and invoice received in this month u can take vat Cr ok it will depand upon this type of situation

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords