quick form shaft formwork system made in china

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
3000 m²
Supply Capability:
60000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

quick form shaft formwork system  made in china 


Based on my pp plastic plywood, we develope a formwork unit for shaft /elavator system/.

  this system adopt advanced technology from EU.

size: can be made according to your drawing.

usge: formwork concrete shuttering of elevator shaft.

Rent: available.

brand: Square Circle Formwork

material: plywood + metal.

place of origin: China

factory located in Linyi, shandong,China

tech-support available.


work style:self-adjust and climbing .

        

   The inside form can re-size to fix and dismantle.

quick form shaft formwork system  made in china 


 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to put the beam formwork in concrete structure
When the carpenter die down from the ceiling! To determine! But you need to check it regularly! Not everyone does it by the rules!
Q:How to calculate the amount of beam formwork
If the border, the template area = (0.6+0.6-0.12+0.3) *10.9=1.38*10.9=15.042 square
Q:What are the middle and side beams in the T beam template?
So there are [side span beam], [cross the middle beam], [medium span beam], [across the edge beam] four kinds of distinction. The amount of concrete, steel is a little different
Q:Beam plate with a few face template
The bottom die and the two side die, the height of the side plate with the height of the plate thickness
Q:Calculate the engineering quantity of the beam template or the engineering quantity of the beam and plate
There is a beam slab template engineering quantity = beam template + plate template; beam template and plate template are calculated according to the beam plate
Q:What is the meaning of the steel beam overhead on the top of the beam formwork
That is, after the formwork is supported, the upper part of the formwork is bound with steel bars (usually on the floor)The reinforcement of the ground beam is the first reinforcement and then the template
Q:When the main beam is connected with the secondary beam, the area of the template is calculated
From the main beam to break, that is, the secondary beam axis to the axis of the long axis of the main axis of the beam to reduce the length of the beam width
Q:What is the wire mesh in front of the foundation beam
Beams are reinforced, how to put into the template? How can we ensure that the concrete does not flow out? Wire netting is the best way
Q:Beam template and foundation beam template to separate sets of fixed?
When you have a beam template, you can not add the foundation beam template! Their price is not the same, to separate! (mainly reflected in measures)
Q:Calculate the beam template when you want to reduce the thickness of the plate
Now the general calculation of the template area is the concrete contact surface is positive, the template thickness to be deducted.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range