quick form shaft formwork system made in china

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
3000 m²
Supply Capability:
60000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

quick form shaft formwork system  made in china 


Based on my pp plastic plywood, we develope a formwork unit for shaft /elavator system/.

  this system adopt advanced technology from EU.

size: can be made according to your drawing.

usge: formwork concrete shuttering of elevator shaft.

Rent: available.

brand: Square Circle Formwork

material: plywood + metal.

place of origin: China

factory located in Linyi, shandong,China

tech-support available.


work style:self-adjust and climbing .

        

   The inside form can re-size to fix and dismantle.

quick form shaft formwork system  made in china 


 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to calculate the foundation beam, template, and cushion.
The calculation of the net area on both sides of the formwork. Cushion volume should be very good
Q:I would like to ask the three sides of the template is calculated on the surface of which is the three?
Beam template is to calculate three sides, is the beam of the two sides with the bottom of the beam
Q:What are the building structure of the template
On the contrary, the beam plate is the first template, tied after the reinforcement, because the beam plate is flat, the first binding steel, do you want to let the first suspension? That's not going to collapse
Q:What is the meaning of the steel beam overhead on the top of the beam formwork
That is, after the formwork is supported, the upper part of the formwork is bound with steel bars (usually on the floor)The reinforcement of the ground beam is the first reinforcement and then the template
Q:Remove the larger span of the beam pillar template why should be removed from the middle to the two ends
Remove from the ends of beams began to load, is Liang Hezhu nodes under pure shear, a shear deformation from the middle split beam gradually remove support, after the load is gradually increased, the shear in the support under the protection of gradually increasing load, small impact.
Q:Calculation of the area of beam formwork
Calculation of contact area between concrete and formworkPillar: circumference multiplied by the column height, from the pile or board surface of a first floor surface, non beam plate count to the bottom of the column cap
Q:According to the experience, who knows the construction area and template, plate, column, beam volume, steel, etc.!
Non residential frame structure of each floor area of the content of the square (excluding basement): template development area of about 2.2 to 2.6 square meters,About 0.35 cubic meters of concrete, steel bar about 50 to 60Kg.
Q:How to calculate the beam model
According to the calculation of the expansion area, the height of support according to the bottom elevation
Q:What are the main composition of the beam template
According to the different support parts are divided into four kinds
Q:Calculate the beam template when you want to reduce the thickness of the plate
Now the general calculation of the template area is the concrete contact surface is positive, the template thickness to be deducted.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range