QUICK ASSEMBLING SCAFFOLDING WITH GREAT REPUTATIONS

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
4000 pc
Supply Capability:
300000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Specifications of Cup Lock Scaffolding:

Name: Cup Lock Scaffolding

Surface Treatment:  Painting
Fitting Name: Ledger 

Color: Red
Package:Steel Pallet
 



3.The Advantages of Cup-lock Scaffolding:

 

Easy assembly, time and labor saving. 

High load-carrying capacity.

Adaptable to various construction projects.

All elements safely connected

Highly durable:



4.Pictures of Cup Lock Scaffolding:
 


QUICK ASSEMBLING SCAFFOLDING WITH GREAT REPUTATIONS

QUICK ASSEMBLING SCAFFOLDING WITH GREAT REPUTATIONS


QUICK ASSEMBLING SCAFFOLDING WITH GREAT REPUTATIONS

5.FAQ:


How about your company?

CNBM International Corporation, China National Building Materials (Group) Corporation, is one of the largest companies in China building material & equipment industry, Our formwork and scaffolding are largely used in both domestic and all over world;


What promises can be done by us?


If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.

If printing required, please advise asap because the whole set need much more time to complete.

Please DO check goods when courier knocks your door and contact us asap if any issue.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How much is the adjusting range of the scaffold of the bottom
(5) bridging angle with the ground control between 45 and 60 degrees, scissors and the horizontal rod or pole cross point application of rotary fastener steel tube firmly, the length is not enough available when docking fasteners then long; the scissors must be set on the top in the end, bridging between bottom and foundation pad. In order to enhance the ability of scissors under load.
Q:Painters on a scaffold?
I know where he should stand, but where he is standing is by the lunch truck when he should be getting his fat-*** back to work.
Q:Industrial/Scaffolding piercing after pain?
I#x27;m pretty sure it#x27;s normal make sure you use the proper cleanser for your ear. And make sure to clean it out as often as the piercer said to.
Q:Scaffolding steel pipe, the number of fasteners?Small wall scaffolding, formwork scaffolding support, the number of steel pipe and fastener calculation,
You can simply think that 5 meters per square meter
Q:A 105 kg scaffold is 6.2 m long. It is hanging with two wires, one from each end. A 520 kg box sits 2.2 m from?
assuming the 105 kg scaffold is uniform taking moment abt left end T * 6.2 = 105 *g * 3.1 + 520 g *2.2 T = 2322.76N answer tension in the right hand side wire
Q:Bowl buckle scaffold from the machine to pull out the upper and lower bowl
It seems that there is no specific load value in the code, but there are some requirements on the calculation method and some structural loads
Q:Does scaffolding piercing hurt more than snug piercing?
A snug is nothing compared to an industrial, you'll be totally fine. Good luck!
Q:I can get a scaffold piercing bar out of my ear HELP!?
Stop sleeping on it and stop trying to pull it out - you're just going to irritate it doing that. If you feel you need new jewelry, go to your piercer. They can help you out.
Q:Can the horizontal bar of the bowl buckle scaffold be oblique to the horizontal position of the vertical bar
The utility model can not form a parallelogram, and the joint of the bowl buckle and the horizontal rod is fixed by the joint.
Q:Industrial/Scaffolding piercing.?
yes it is possible. I know people who have done that. But I suggest getting it done at once because it will hurt less in the long run. Getting your cartilage done hurts for about 2 weeks and then get the top part done that is another 2 weeks. So to get it done together it will only hurt for 2 weeks in instead of 4.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range