• QTZ63(5610S) tower crane System 1
  • QTZ63(5610S) tower crane System 2
  • QTZ63(5610S) tower crane System 3
  • QTZ63(5610S) tower crane System 4
QTZ63(5610S) tower crane

QTZ63(5610S) tower crane

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTZ63(5610) tower crane is novel hoisting and conveying machinery which is designed by Shandong Fuyou Co., Ltd. by fully utilizing the group technology, the combinational design technology and the finite element analysis technology and taking the tower crane microcomputer design platform as a tool.
The crane is a horizontal-arm-rest trolley-amplitude upper-revolution hydraulic lifting type crane which has the maximum working amplitude of 56m, the independent lifting height of 40m, the adhesion lifting height of 150m, the rated lifting moment of 710kN•m and the maximum lifting moment of 853.2kN•m. All the performance parameters and technical indexes of the crane meet or surpass national standards.
The crane features advanced parameters, excellent and reliable properties, attractive appearance, high quality, simple and practical structures, advanced safety devices, convenient maintenance, safe usage and reasonable prices, and is ideal construction machinery for many construction enterprises.

The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.

 

Amplitude(m)

3-13.6

14

15

16

17

18

19

20

21

22

23

Lifting capacity(kg)

4000

3890

3618

3380

3170

2860

2810

2660

2530

2400

2290

Amplitude(m)

24

25

26

27

28

29

30

31

32

33

34

Lifting capacity(kg)

2190

2090

2000

1920

1850

1770

1710

1650

1590

1540

1490

Amplitude(m)

35

36

37

38

39

40

41

42

43

44

45

Lifting capacity(kg)

1440

1390

1350

1310

1270

1230

1200

1170

1130

1100

1070

Amplitude(m)

46

47

48

Lifting capacity(kg)

1050

1020

1000

 

(2)2-magnification Lifting Performance Table


Amplitude(m)

3-26

27

28

29

30

31

32

33

34

35

Lifting capacity(kg)

2000

1920

1850

1770

1710

1650

1590

1540

1490

1440

Amplitude(m)

36

37

38

39

40

41

42

43

44

45

Lifting capacity(kg)

1390

1350

1310

1270

1230

1200

1170

1130

1100

1070

Amplitude(m)

46

47

48

Lifting capacity(kg)

1050

1020

1000

 

Technical Performance Parameter Table


Item

Unit

Magnification

α=2

α=4

Rated lifting moment

kN.m

500

Maximum lifting capacity

t

2

4

Working amplitude

m

3 ~48

Maximum amplitude lifting capacity

t

1.0

Lifting height

Independent

m

30

Attached

m

120

Time of moving outrigger end to rotation center

m

48.74

Time of moving balance arm tail to rotation center

m

12.816

Counter weight

t

7

Total motor power

kW

24.9

Allowable working temperature

0C

-20~+40

 

Q:What prior education and skills are needed to become a Crane operator ?
A basic education is required, no need for major courses. Skills however is developed through training. One is communication skills using a radio. Because crane operators have a partner called rigger, who overlooks the movement of crane below while telling instruction to the crane operator. Another skill is synchronization. Crane operators should possessed good movement synchronization and operation of levers and buttons inside his cabin. Another is good eyesight. Lastly, safety skill. Operators should know the capacity or the equipment he is operating and the calibration of the machine he is using.
Q:Where can I get the tower crane manufacturing permit?
Zhengzhou China enterprise management consulting company, oh, my uncle company for tower crane manufacturing license is to find them, they are not only a team of professional, and service is very thoughtful, efficient.
Q:On the show Passions was Fox Crane ever sexually assaulted?
he and several other male characters have been sexually assaulted. Oddly enough, men on the show are equally as likely to be violated as women. Fox Crane, Julian Crane, Luis Lopez-Fitzgerald, Miguel Lopez-Fitzgerald, and Ethan Winthrop have all been victims of sexual assault. His individual character bio doesn't describe about it though.
Q:Well,i just LOVE this piece of origami work...I've tried so many (kinda the same) instructions but i always get confused on the step 3-4...do you know any easy instruction,with clear explanations for a begginer?thank you already~~
visit okorder / that's the place where I learned folding paper cranes. XD I've always loved them.
Q:It got me thinking.
I have not seen the movie, but I think I saw what you're talking about on a preview. I would think that the safeties involved in the control system for a crane would make it highly unlikely to happen. There is no absolute assurance, only probabilities or likelihoods. You just hope that you have enough failsafes in the system so if one part of the system fails, the others will take over, or shut the whole thing down properly.
Q:What are the requirements for the use of an anti-two block device on a lattice boom crane used as a drill?
what the hell are you talking about
Q:Is Fireplace Crane a modern term for the swing-out metal arms that hang over a fireplace for cooking? e.g. like in dutch ovens or pots/cauldrons that hang over a fire. It sounds like a more modern term and I need to know if there is an older term. Thanks.
Happiness is a state that exists only for a moment
Q:How are those really tall construction cranes assembled ???
I assume you are talking about a tower crane. From a distance, it looks like a T with one side shorter than the other. First, you need a good foundation for the crane to sit on. Next, you have a large mobile crane. With the mobile crane, you construct the tower (metal framing going up), the cab (where the operator sits and the motors), the boom (the mast out front) and the counter-weights (on the side opposite the boom). For the most part, this will get you a tower crane that will be about 200 feet above the ground. Most tower cranes today are self-jumping. Once you are ready to jump the tower crame (i.e. insert another section of the metal frame) there are hyraulics that lift the boom, cap and counterwieghts. This will create a gap in the metal frame. The tower crane will then pick up a section of frame and hoist it up and the ironworkers will slide it into place. The top section will be lowered down onto the new frame piece. The hydraulic jacks then get re-attached higher up to continue the jumping process. That is how you get a crane to build a 50+ soty building. By the way, once the crane is about 700 feet in the air, (if you have the stomach for it), it is a blast to ride out to the end of the boom.
Q:How many meters does the tower crane installation height require expert proof?
The installation, disassembly and jacking of tower cranes must be carried out by experts
Q:If I can't leave them outside..what should I do?
recycle

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords