QTZ63(5610) tower crane

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

QTZ63(5610) tower crane is novel hoisting and conveying machinery which is designed by Shandong Fuyou Co., Ltd. by fully utilizing the group technology, the combinational design technology and the finite element analysis technology and taking the tower crane microcomputer design platform as a tool.
The crane is a horizontal-arm-rest trolley-amplitude upper-revolution hydraulic lifting type crane which has the maximum working amplitude of 56m, the independent lifting height of 40m, the adhesion lifting height of 150m, the rated lifting moment of 710kN•m and the maximum lifting moment of 853.2kN•m. All the performance parameters and technical indexes of the crane meet or surpass national standards.
The crane features advanced parameters, excellent and reliable properties, attractive appearance, high quality, simple and practical structures, advanced safety devices, convenient maintenance, safe usage and reasonable prices, and is ideal construction machinery for many construction enterprises.

The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.

 

Amplitude(m)

3-13.6

14

15

16

17

18

19

20

21

22

23

Lifting capacity(kg)

4000

3890

3618

3380

3170

2860

2810

2660

2530

2400

2290

Amplitude(m)

24

25

26

27

28

29

30

31

32

33

34

Lifting capacity(kg)

2190

2090

2000

1920

1850

1770

1710

1650

1590

1540

1490

Amplitude(m)

35

36

37

38

39

40

41

42

43

44

45

Lifting capacity(kg)

1440

1390

1350

1310

1270

1230

1200

1170

1130

1100

1070

Amplitude(m)

46

47

48

Lifting capacity(kg)

1050

1020

1000

 

(2)2-magnification Lifting Performance Table


Amplitude(m)

3-26

27

28

29

30

31

32

33

34

35

Lifting capacity(kg)

2000

1920

1850

1770

1710

1650

1590

1540

1490

1440

Amplitude(m)

36

37

38

39

40

41

42

43

44

45

Lifting capacity(kg)

1390

1350

1310

1270

1230

1200

1170

1130

1100

1070

Amplitude(m)

46

47

48

Lifting capacity(kg)

1050

1020

1000

 

Technical Performance Parameter Table


Item

Unit

Magnification

α=2

α=4

Rated lifting moment

kN.m

500

Maximum lifting capacity

t

2

4

Working amplitude

m

3 ~48

Maximum amplitude lifting capacity

t

1.0

Lifting height

Independent

m

30

Attached

m

120

Time of moving outrigger end to rotation center

m

48.74

Time of moving balance arm tail to rotation center

m

12.816

Counter weight

t

7

Total motor power

kW

24.9

Allowable working temperature

0C

-20~+40

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Tower crane body standard section connection bolt screw upward or downward, why?.
A few days ago, a special training course of mechanical equipment, a safety supervision station old experts say the screw from the upward wear, stress is the same, but if the nut screw will fall off, in order to find problems. If you can't get it off the top and bottom nut, you won't find it
Q:Under what circumstances does a tower crane require third party testing?
New installation, demolition, close, major transformation, the use of site work committee, the use of factories to the Technical Supervision Bureau
Q:Climbing process of an internal climbing tower crane
Climbing tower crane, usually installed in the elevator shaft building or ad hoc Bay, also can be installed in the cylinder structure, by means of a climbing mechanism increases with the structure increases, generally every building 3~8m, crane climbing a tower, its height is only 20m left and right, lifting height with construction height and.
Q:What is an attached tower crane?
Attached tower craneAttached tower crane is arranged close to the building, the tower by themselves to rise up with the increase of buildings and roof, tower, every 20m with attachment support device, the tower body is fixed on the building, in order to maintain stability. Figure 11 is a QT4 - 10 self - elevating four - tower crane (attachable, stationary, walkable, and climbing).
Q:How to build a tower crane?
7, the boom of the horizontal installation, setup of counterweight, main hoist installation, installation sequence of these large, there are provisions in the instructions.8 、 install operating room, main cable and control cable. Installation of crane wire rope, hook, lifting the car has been in the assembly of the boom when installed.9, at this time has completed the basic installation, the later self lifting installation, the main work by the tower crane itself equipment and artificial to complete.10 tower crane from basic height to work height.Each type of tower crane has different self lifting mounting methods. In fact, in addition to carrying heavy loads, the installation of a large number of high-strength bolts is a heavy work.11, the above is the general procedure, the actual installation work in strict accordance with the installation instructions. According to historical experience, tower crane installation accidents often occur in some professional installation team.12, the old type of tower crane installation is relatively simple, but also have independent installation, and now the development of automobile crane is not a must, general use of car crane can complete all the installation.
Q:What is the calibration value of a tower crane?
Three, gravity moment MThe product of amplitude L and the corresponding lifting objects called Q gravity lifting moment, the unit is kN - M.Tower crane capacity is based on lifting moment representation. It uses the product of the maximum working range and the corresponding maximum lifting load as the calibration value of the lifting moment.Four 、 lifting height HIt refers to the vertical distance from the surface to the parking level of the crane sling allows the highest position. The unit is m.Five, work speed1. lifting speed (down) Vn - stable state of motion, the vertical displacement velocity of the rated load. The unit is m/min.2. crane (CART) running speed of Vk, stable state of motion, the running speed of the crane. The operating speed of a crane with rated load on the horizontal (or horizontal rail) surface, at the height of 10m away from the ground, and when the wind speed is less than 3m/s.
Q:How many meters is the tower crane installed on the edge of the deep foundation pit?
If you set the tower crane foundation in the foundation pit, which is based on another piling, the general is to help the wall of the tower crane (unless your project in the free height under it), so far away from the foundation by the wall distance set.The two tower cranes are all supported by piles and steel lattice columns in the foundation pit. The distance is determined by the distance between the outer edge of the main structure and the supporting wall.
Q:Operation points of tower crane (tower crane)?
Safe use requires the use of tower crane, issued by the state competent authorities shall abide by the rules and regulations, but also comply with the relevant provisions in the manual: the crane working environment temperature is -20~40 degrees Celsius, the maximum working pressure is 205N/m2, when should stop using the winds of more than 6 level; the same construction site to install more than two sets of tower crane when should pay attention to the location of each tower, take the elevation of different operations, in order to avoid the tower crane jib, balance arm collision accidents; safety device of tower crane, luffing and slewing height, mass and moment limiter, the last two more important, if the two is not detected qualified, will be regarded as the unqualified, because it plays a role to ensure the safety and prevent the tilting of the tower crane. As a construction site, the tower crane torque limiter failure or to replace the operating personnel mistakenly believe that daily only hanging 800-1000kg materials, not what the risk, the results in a process of lifting materials, because of the construction site is narrow, hanging by the operator sight blocked, hanging objects hanging on building the steel frame, caused by tower crane shaking, was the occurrence of major accidents, thanks to the ground work riggers promptly notify the operator immediately stop to avoid rollover accident of tower crane appeared. It is obvious that all safety devices on the tower crane are essential and must be checked regularly to ensure that all the safety devices are in good condition, sensitive and reliable.
Q:What is the scrap standard of tower crane hook?
The American Standard can provide for your reference:1, hook hanging points in the effective area of cross sectional wear more than 10%, should be disabled and scrapped.2 any visible permanent deformation and cracks shall be disabled and scrapped.3, if the wear is in the same area in two directions, it should be controlled within 5%.4, any hook opening deformation is not greater than 5%, or in accordance with the manufacturer's guidelines to determine.5, hook bow hook (i.e. intermediate position hook C shape) wear amount should be less than 5%.
Q:What are the climbing claws on the tower crane?
You mean the set section? Used to be rubber, and later found that when the top of the friction is too large, not too good, plus plus the festival, but also always remove the standard section paint, and now basically the pulley

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range